Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Danvers, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 256ft / 78.1mTotal length
  • $75,921,000Total costs
  • 930,459Total average daily traffic
  • 70,762Total average daily truck traffic
  • 1,352,510Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Danvers
  • No street view available for this location

New bridges in Danvers, MA - historical statistics
  • New bridges - historical statistics
  • 41940-1949
  • 71950-1959
  • 31960-1969
  • 41970-1979
  • 11980-1989
  • 32010-2019
Reconstructed bridges in Danvers, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
Average Bridge Daily Traffic in Danvers, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 26.3%Good
  • 52.6%Satisfactory
  • 15.8%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.1%Very good
  • 13.6%Good
  • 22.7%Satisfactory
  • 40.9%Fair
  • 13.6%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.5%Very good
  • 18.2%Good
  • 27.3%Satisfactory
  • 45.5%Fair
  • 4.5%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 80.0%Good
Find on map >>   Show street view

Structure Number: D030022PEMUNNBI,  Location: .75 MI NW OF PEABODY (Lat: 42.552258,  Lng: -70.924983),  Route carried "on" structure: City street 35,  Year Built: 1980,  Status: Open,  Structure Length: 1.71m (5.61ft),  Average Daily Traffic: 32,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 42,325 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CRANE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.070,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.8m (55.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,012,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,519,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D03003325DOT634,  Location: .5 MI E ST 128 (Lat: 42.550131,  Lng: -70.926792),  Route carried "on" structure: State highway ,  Year Built: 1952,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 28,800 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 15,477 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA/BMRR,  Facility Carried by Structure: HWY ENDICOTT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.483,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $934,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,402,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D030092UHDOTNBI,  Location: OVER IPSWICH RIVER (Lat: 42.573953,  Lng: -70.993483),  Route carried "on" structure: State highway 114,  Year Built: 1954,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 38,957 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 81,650 (year 2032),  Design Load: HS 20,  Features Intersected: WATER IPSWICH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.422,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Serious,  Channel: Good,  Operating Rating: 48.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 6 months,  Underwater Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Underwater Inspection Date: June 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,771,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $2,657,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: D03013AVFMUNNBI,  Location: .25 MI NW OF PEABODY (Lat: 42.545836,  Lng: -70.920583),  Route carried "on" structure: City street 35,  Year Built: 2016,  Status: Open,  Structure Length: 4.37m (14.34ft),  Average Daily Traffic: 27,500 (year 2017),  Truck Traffic: 2%,  Design Load: HL 93,  Features Intersected: WATER WATERS RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.893,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 14.7m (48.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.6m (67.6ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 5.2m (17.1ft),  Curb-To-Curb Width: 14.7m (48.2ft),  Out-to-Out Width: 23.7m (77.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D030162T6DOTNBI,  Location: 1.6 MI N ST114 (Lat: 42.583950,  Lng: -70.967172),  Route carried "on" structure: US 1,  Year Built: 1950,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 23,230 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 46,905 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: ST 62 MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.647,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 67.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D030162T7DOTNBI,  Location: 1.6 MI N ST114 (Lat: 42.584069,  Lng: -70.967386),  Route carried "on" structure: US 1,  Year Built: 1950,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 2.99m (9.81ft),  Average Daily Traffic: 19,815 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 46,905 (year 2031),  Design Load: H 20,  Features Intersected: ST 62 MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 92.647,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 67.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $638,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D030172T2DOTNBI,  Location: 1.6 MI S ST62 (Lat: 42.560767,  Lng: -70.977381),  Route carried "on" structure: US 1,  Year Built: 1950,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 24,220 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 75,017 (year 2031),  Design Load: HS 20,  Features Intersected: ST114 ANDOVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.928,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.6m (34.8ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,454,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $2,182,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: D030172T3DOTNBI,  Location: 1.6 MI S ST62 (Lat: 42.560872,  Lng: -70.977575),  Route carried "on" structure: US 1,  Year Built: 1950,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 20,656 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 63,962 (year 2031),  Design Load: HS 20,  Features Intersected: ST114 ANDOVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 89.928,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 11.6m (38.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,454,000,  Roadway Improvement Cost: $146,000,  Total Project Cost: $2,182,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: D030192U1DOTNBI,  Location: 0.1 MI SOUTH OF ST 35 (Lat: 42.556158,  Lng: -70.931250),  Route carried "on" structure: State highway 128,  Year Built: 1940,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 73,800 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 110,551 (year 2031),  Design Load: H 20,  Features Intersected: WATER CRANE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 97.202,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 27.1m (88.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 95.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $456,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $685,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: D03020AQ8DOTNBI,  Location: 2 KM NORTH OF ST114 (Lat: 42.557042,  Lng: -70.930208),  Route carried "on" structure: State highway 128,  Year Built: 2012,  Status: Open,  Structure Length: 2.78m (9.12ft),  Average Daily Traffic: 98,000 (year 2019),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: RR MBTA/BMRR (ABANDON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 34.2m (112.2ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.5m (34.4ft),  Curb-To-Curb Width: 31.0m (101.7ft),  Out-to-Out Width: 36.2m (118.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 94.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D030212U3DOTNBI,  Location: 1.3 MI N ST114 (Lat: 42.558086,  Lng: -70.928969),  Route carried "on" structure: State highway 128,  Year Built: 1940,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 72,449 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 116,552 (year 2032),  Design Load: H 20,  Features Intersected: ST 35 HIGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 26.0m (85.3ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 30.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,452,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $3,679,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D030222U4DOTNBI,  Location: 1000 FT N OF ST-35 (Lat: 42.560150,  Lng: -70.926800),  Route carried "on" structure: State highway 128,  Year Built: 1941,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 73,898 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 127,134 (year 2031),  Design Load: H 20,  Features Intersected: WATER PORTER RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.858,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 24.4m (80.1ft),  Skew: 30 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.4m (80.1ft),  Out-to-Out Width: 28.0m (91.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 88.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $990,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,486,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: D030252U5DOTNBI,  Location: JCT ST 62 & ST 128 (Lat: 42.565344,  Lng: -70.922964),  Route carried "on" structure: State highway 128,  Year Built: 1940,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 72,449 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 116,552 (year 2032),  Design Load: H 20,  Features Intersected: ST 62 ELLIOT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 22.9m (75.1ft),  Out-to-Out Width: 25.4m (83.3ft)

Condition: Superstructure: Satisfactory,  Substructure: Fair,  Inventory Rating: 61.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,195,000,  Roadway Improvement Cost: $220,000,  Total Project Cost: $3,293,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D03026B1TDOTNBI,  Location: 0.7 MI N OF RTE 114 (Lat: 42.569328,  Lng: -70.973628),  Route carried "on" structure: US 1,  Year Built: 2012,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 32,600 (year 2016),  Truck Traffic: 10%,  Design Load: HS 25 or greater,  Features Intersected: HWY CENTRE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.2m (36.7ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 23.0m (75.5ft),  Out-to-Out Width: 37.8m (124.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 97.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $2,697,000,  Roadway Improvement Cost: $270,000,  Total Project Cost: $4,046,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: D0302830JDOTNBI,  Location: AT SHOPPING CENTERS (Lat: 42.549006,  Lng: -70.936556),  Route carried "on" structure: State highway ,  Year Built: 1954,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 17,450 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,742 (year 2032),  Design Load: HS 20,  Features Intersected: ST128,  Facility Carried by Structure: HWY ENDICOTT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 4,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $2,112,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $3,169,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: D030312VEDOTNBI,  Location: 1.5 MI N ST62 (Lat: 42.559694,  Lng: -70.974394),  Route carried "on" structure: Interstate 95,  Year Built: 1969,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 40,100 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 91,599 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST114 ANDOVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.214,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.8m (137.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,547,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $5,321,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D030312VFDOTNBI,  Location: 1.5 MI N ST62 (Lat: 42.559522,  Lng: -70.973875),  Route carried "on" structure: Interstate 95,  Year Built: 1969,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 39,400 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 91,599 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST114 ANDOVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 106.214,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 41.8m (137.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 18.6m (61.0ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,547,000,  Roadway Improvement Cost: $355,000,  Total Project Cost: $5,321,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D0303230KDOTNBI,  Location: 1 MILE SOUTH ST 62 (Lat: 42.568297,  Lng: -70.970772),  Route carried "on" structure: State highway ,  Year Built: 1969,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 28,600 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,161 (year 2032),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: HWY CENTRE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.2m (53.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 42.1m (138.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 17.5m (57.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $5,912,000,  Roadway Improvement Cost: $592,000,  Total Project Cost: $8,869,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D030332VGDOTNBI,  Location: 1.6 MI N ST114 (Lat: 42.581861,  Lng: -70.963669),  Route carried "on" structure: Interstate 95,  Year Built: 1972,  Status: Temporarily open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 40,095 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 91,599 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST 62 MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.389,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 21.0m (68.9ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $3,218,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $4,828,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D030332VHDOTNBI,  Location: 1.6 MI N ST114 (Lat: 42.582092,  Lng: -70.964089),  Route carried "on" structure: Interstate 95,  Year Built: 1972,  Status: Temporarily open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 72,740 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 91,599 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: ST 62 MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 109.389,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 58.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $3,740,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $5,611,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D030342T8DOTNBI,  Location: .5 MI N OF ST-62 (Lat: 42.592394,  Lng: -70.961644),  Route carried "on" structure: US 1,  Year Built: 1972,  Status: Open,  Structure Length: 10.18m (33.40ft),  Average Daily Traffic: 24,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 54,328 (year 2032),  Design Load: H 20,  Features Intersected: I 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.661,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 50.3m (165.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 11.20m (36.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $8,390,000,  Roadway Improvement Cost: $840,000,  Total Project Cost: $12,586,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: D030352T9DOTNBI,  Location: .8 MI N OF ST-62 (Lat: 42.595869,  Lng: -70.963553),  Route carried "on" structure: US 1,  Year Built: 1972,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 29,500 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 50,853 (year 2032),  Design Load: H 20,  Features Intersected: I 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 93.661,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $3,872,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $5,809,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Danvers, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.