Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Coffeeville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 390ft / 119mTotal length
  • $34,637,000Total costs
  • 14,690Total average daily traffic
  • 3,348Total average daily truck traffic
  • 18,962Total future (year 2032) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Coffeeville
  • No street view available for this location

New bridges in Coffeeville, AL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 81950-1959
  • 31960-1969
  • 41980-1989
  • 11990-1999
  • 22000-2009
Average Bridge Truck Traffic in Coffeeville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 28.6%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 31.6%Very good
  • 15.8%Good
  • 31.6%Satisfactory
  • 21.1%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 8.3%Excellent
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 8.3%Fair
Find on map >>   Show street view

Structure Number: 3302,  Location: 2.5MI.S.OF COFFEEVILLE (Lat: 31.716917,  Lng: -88.066017),  Route carried "on" structure: State highway 69,  Year Built: 1948,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 710 (year 2013),  Truck Traffic: 8%,  Average Future Daily Traffic: 923 (year 2033),  Design Load: H 15,  Features Intersected: EBERLEIN MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.943,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $916,000,  Roadway Improvement Cost: $92,000,  Total Project Cost: $1,008,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 391,  Location: 2 MI NE OF INLAND (Lat: 33.880019,  Lng: -86.580608),  Route carried "on" structure: City street 241,  Year Built: 1950,  Status: Posted for load,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 100 (year 2016),  Average Future Daily Traffic: 148 (year 2036),  Features Intersected: LITTLE WARRIOR RIVER,  Facility Carried by Structure: HOUSE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.78m (12.40ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $399,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 4915,  Location: 2.8 MI. N. OF COFFEEVILLE (Lat: 31.792422,  Lng: -88.083833),  Route carried "on" structure: State highway 69,  Year Built: 1954,  Status: Open,  Structure Length: 1.17m (3.84ft),  Average Daily Traffic: 470 (year 2013),  Truck Traffic: 25%,  Average Future Daily Traffic: 611 (year 2033),  Design Load: H 15,  Features Intersected: ULCANUSH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.868,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $820,000,  Roadway Improvement Cost: $82,000,  Total Project Cost: $902,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4916,  Location: 3.5 MI. N. OF COFFEEVILLE (Lat: 31.800400,  Lng: -88.091050),  Route carried "on" structure: State highway 69,  Year Built: 1954,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 470 (year 2013),  Truck Traffic: 25%,  Average Future Daily Traffic: 611 (year 2033),  Design Load: H 15,  Features Intersected: ESTIS MILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.988,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 50.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.25m (7.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,002,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,102,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 4917,  Location: 4.7 MI. N. OF COFFEEVILLE (Lat: 31.819778,  Lng: -88.099708),  Route carried "on" structure: State highway 69,  Year Built: 1954,  Status: Open,  Structure Length: 1.15m (3.77ft),  Average Daily Traffic: 470 (year 2013),  Truck Traffic: 25%,  Average Future Daily Traffic: 611 (year 2033),  Design Load: H 15,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.291,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.82m (5.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $579,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 6199,  Location: 2.3 MI. W. OF COFFEEVILLE (Lat: 31.746353,  Lng: -88.136258),  Route carried "on" structure: US 84,  Year Built: 1958,  Status: Open,  Structure Length: 27.98m (91.80ft),  Average Daily Traffic: 1,690 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 2,267 (year 2033),  Design Load: H 20,  Features Intersected: TOMBIGBEE RIVER REL.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 32.895,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 27,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 27.98m (91.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $5,372,000,  Roadway Improvement Cost: $537,000,  Total Project Cost: $5,909,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 62,  Location: 1 MI. W. OF COFFEEVILLE (Lat: 31.751831,  Lng: -88.114983),  Route carried "on" structure: US 84,  Year Built: 1958,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,690 (year 2013),  Truck Traffic: 26%,  Average Future Daily Traffic: 2,267 (year 2033),  Design Load: H 20,  Features Intersected: TOMBIGBEE RIVER REL.
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 35.109,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,394,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $1,533,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6201,  Location: CHOCTAW * CLARKE COLINE (Lat: 31.754900,  Lng: -88.103200),  Route carried "on" structure: US 84,  Year Built: 1958,  Status: Open,  Structure Length: 39.32m (129.00ft),  Average Daily Traffic: 2,050 (year 2012),  Truck Traffic: 26%,  Average Future Daily Traffic: 2,267 (year 2033),  Design Load: H 20,  Features Intersected: TOMBIGBEE RIVER
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 36.180,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Navigation Control: Yes ( Vertical Clearance: 11.3m (37.1ft), Horizontal Clearance: 121.9m (399.9ft)),  Material/Design: Steel continuous,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 11,  Length of Maximum Span: 121.9m (399.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 34.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 39.32m (129.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Critical Feature Inspection Date: October 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $8,088,000,  Roadway Improvement Cost: $809,000,  Total Project Cost: $8,897,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 966,  Location: 0.48 MI.E.JCT.CO.31*CO.21 (Lat: 31.831667,  Lng: -88.126667),  Route carried "on" structure: County highway 21,  Year Built: 1968,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 250 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 275 (year 2041),  Design Load: H 15,  Features Intersected: WEST BEND CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.65m (5.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $38,000,  Total Project Cost: $420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9661,  Location: 0.54 MI.E.JCT.AL.69*CO.21 (Lat: 31.823333,  Lng: -88.093333),  Route carried "on" structure: County highway 21,  Year Built: 1968,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 250 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 265 (year 2041),  Design Load: H 15,  Features Intersected: PACE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 77.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $483,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $531,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9662,  Location: 1.38 MI.E.JCT AL69*CO. 21 (Lat: 31.826667,  Lng: -88.080000),  Route carried "on" structure: County highway 21,  Year Built: 1968,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 225 (year 1995),  Truck Traffic: 5%,  Average Future Daily Traffic: 240 (year 2041),  Design Load: H 15,  Features Intersected: ENOCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $403,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13132,  Location: COFFEEVILLE (Lat: 31.763333,  Lng: -88.075000),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 100 (year 1995),  Average Future Daily Traffic: 115 (year 2041),  Design Load: H 15,  Features Intersected: TOLAND CREEK,  Facility Carried by Structure: GIN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 14.1m (46.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 81.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $349,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $384,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 13597,  Location: 0.5 MI. E. OF COFFEEVILLE (Lat: 31.753450,  Lng: -88.077500),  Route carried "on" structure: US 84,  Year Built: 1985,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,500 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 2,012 (year 2033),  Design Load: HS 20,  Features Intersected: EBERLEIN MILL CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 39.048,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $677,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $745,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13598,  Location: 0.8 MI. E. OF COFFEEVILLE (Lat: 31.752267,  Lng: -88.073667),  Route carried "on" structure: US 84,  Year Built: 1985,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,500 (year 2013),  Truck Traffic: 24%,  Average Future Daily Traffic: 2,012 (year 2033),  Design Load: HS 20,  Features Intersected: CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.179,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 85.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $607,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $668,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14525,  Location: 3.8 MI. E. OF COFFEEVILLE (Lat: 31.746133,  Lng: -88.026125),  Route carried "on" structure: US 84,  Year Built: 1988,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 1,330 (year 2013),  Truck Traffic: 29%,  Average Future Daily Traffic: 1,784 (year 2033),  Design Load: HS 20,  Features Intersected: SATILPA CREEK REL.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.049,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $2,930,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $3,223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14526,  Location: 4 MI. E. OF COFFEEVILLE (Lat: 31.744972,  Lng: -88.022761),  Route carried "on" structure: US 84,  Year Built: 1988,  Status: Open,  Structure Length: 17.62m (57.81ft),  Average Daily Traffic: 1,330 (year 2013),  Truck Traffic: 29%,  Average Future Daily Traffic: 1,784 (year 2033),  Design Load: HS 20,  Features Intersected: SATILPA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.371,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 17,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 18.32m (60.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $5,778,000,  Roadway Improvement Cost: $578,000,  Total Project Cost: $6,356,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15334,  Location: 1.8 MI. CO RT 21 (Lat: 31.773333,  Lng: -88.036667),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 75 (year 1992),  Average Future Daily Traffic: 100 (year 2041),  Design Load: HS 20,  Features Intersected: SATILPA CREEK RELIEF,  Facility Carried by Structure: NORRIS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 86.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $340,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 19627,  Location: 3.3 MI NORTH OF CR#35 (Lat: 33.401119,  Lng: -88.085031),  Route carried "on" structure: County highway 37,  Year Built: 2006,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 180 (year 2008),  Truck Traffic: 3%,  Average Future Daily Traffic: 270 (year 2032),  Design Load: HS 20,  Features Intersected: BRANCH OF COALFIRE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $283,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $311,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 19849,  Location: 250' S OF W. 8TH ST (Lat: 33.177000,  Lng: -86.259833),  Route carried "on" structure: City street ,  Year Built: 2002,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 300 (year 2020),  Average Future Daily Traffic: 400 (year 2040),  Design Load: HS 20,  Features Intersected: BIG DITCH,  Facility Carried by Structure: WOODLAWN AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $812,000,  Roadway Improvement Cost: $81,000,  Total Project Cost: $893,000 ( Estimate for 2022)
Discuss Coffeeville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.