Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Clarks Summit, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 256ft / 78.0mTotal length
  • $25,560,000Total costs
  • 81,833Total average daily traffic
  • 4,887Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Clarks Summit
  • No street view available for this location

New bridges in Clarks Summit, PA - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 61950-1959
  • 31980-1989
  • 11990-1999
  • 12010-2019
Reconstructed bridges in Clarks Summit, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 12000-2009
  • 12010-2019
Average Bridge Daily Traffic in Clarks Summit, PA
Average Bridge Truck Traffic in Clarks Summit, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 57.1%Good
  • 42.9%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 57.1%Good
  • 14.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 28.6%Good
  • 42.9%Satisfactory
  • 14.3%Fair
  • 14.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 20373,  Location: CLK SMT BO .2 M E SR 4011 (Lat: 41.500069,  Lng: -75.710808),  Route carried "on" structure: US 6,  Year Built: 1986,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 12,498 (year 2022),  Truck Traffic: 9%,  Average Future Daily Traffic: 18,759 (year 2032),  Design Load: HS 20,  Features Intersected: NS RAILROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 97.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 58.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20758,  Location: NEWTON TWP .8M S SR 3003 (Lat: 41.453756,  Lng: -75.737081),  Route carried "on" structure: State highway ,  Year Built: 1937,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 526 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 688 (year 2032),  Design Load: HS 20,  Features Intersected: BRANCH OF GARDNERS CREEK,  Facility Carried by Structure: SR 3009
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.236,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $19,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $252,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20831,  Location: CLARKS SUMMIT BO JCT TR 6 (Lat: 41.494836,  Lng: -75.705969),  Route carried "on" structure: State highway ,  Year Built: 1996,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 5,380 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,000 (year 2032),  Design Load: H 20,  Features Intersected: N.S. RR,  Facility Carried by Structure: SR4024 WINOLA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.540,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.19m (7.19ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20832,  Location: CLARKS SUMMIT .5M S TR 6 (Lat: 41.490883,  Lng: -75.702347),  Route carried "on" structure: State highway ,  Year Built: 1984,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 6,383 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,655 (year 2032),  Design Load: HS 20,  Features Intersected: N.S. RR,  Facility Carried by Structure: SR 4026 WEST GROVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.822,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20925,  Location: 1000 FT SW OF US 6 (Lat: 41.489103,  Lng: -75.700314),  Route carried "on" structure: City street ,  Year Built: 1987,  Status: Open,  Structure Length: 12.28m (40.29ft),  Average Daily Traffic: 1,400 (year 2012),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,875 (year 2032),  Features Intersected: D&H RAILROAD,  Facility Carried by Structure: KNAPP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Very good,  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 13.20m (43.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20957,  Location: CLARKS SUMMIT BOROUGH (Lat: 41.483333,  Lng: -75.691667),  Route carried "on" structure: Interstate 476,  Year Built: 1955,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 49.59m (162.70ft),  Average Daily Traffic: 6,895 (year 2001),  Truck Traffic: 19%,  Average Future Daily Traffic: 10,187 (year 2030),  Design Load: HS 20,  Features Intersected: US6&11, SR0407, CP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 51.8m (169.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 18.6m (61.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 50.30m (165.03ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2019,  Critical Feature Inspection Date: July 2019,  Bridge Improvement Cost: $1,875,000,  Roadway Improvement Cost: $5,521,000,  Total Project Cost: $25,308,000,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 47771,  Location: S ABINGTN TP .4M E TR307 (Lat: 41.475383,  Lng: -75.702161),  Route carried "on" structure: State highway ,  Year Built: 2013,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 4,437 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 7,294 (year 2033),  Design Load: HL 93,  Features Intersected: PA TURNPIKE,I-476;NB-736,  Facility Carried by Structure: SR 4032
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.201,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 65.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported by rating factor (RF) using HL93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 20954,  Location: N. SCRANTON CITY (Lat: 41.471389,  Lng: -75.704183),  Route carried "under" structure: ServiceOther road ,  Year Built: 1957,  Structure Length: 0. m,  Features Intersected: SR0307, LR671,  Facility Carried by Structure: PA TPK (I-476)
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 20954,  Location: N. SCRANTON CITY (Lat: 41.471389,  Lng: -75.704183),  Route carried "under" structure: State highway 307,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 8,603 (year 2022),  Truck Traffic: 3%,  Features Intersected: SR0307, LR671,  Facility Carried by Structure: PA TPK (I-476)
Minimum Vertical Clearance: 12.41m (40.72ft),  Kilometerpoint: 23.846,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 46.6m (152.9ft)

Find on map >>   Show street view

Structure Number: 20957,  Location: CLARKS SUMMIT BOROUGH (Lat: 41.483333,  Lng: -75.691667),  Route carried "under" structure: State highway 407,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 9,481 (year 2021),  Truck Traffic: 2%,  Features Intersected: US6&11, SR0407, CP RR,  Facility Carried by Structure: PA TPK (I-476)
Minimum Vertical Clearance: 14.33m (47.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 20957,  Location: CLARKS SUMMIT BOROUGH (Lat: 41.483333,  Lng: -75.691667),  Route carried "under" structure: US 6,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 13,673 (year 2022),  Truck Traffic: 5%,  Features Intersected: US6&11, SR0407, CP RR
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 12.036,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 51.8m (169.9ft)

Find on map >>   Show street view

Structure Number: 20957,  Location: CLARKS SUMMIT BOROUGH (Lat: 41.483333,  Lng: -75.691667),  Route carried "under" structure: US 6,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 12,557 (year 2022),  Truck Traffic: 5%,  Features Intersected: US6&11, SR0407, CP RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.028,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 51.8m (169.9ft)

Discuss Clarks Summit, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.