Bridge Statistics for Chickasaw, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 22Number of bridges
  • 449ft / 137mTotal length
  • $73,567,000Total costs
  • 465,101Total average daily traffic
  • 49,976Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chickasaw
  • No street view available for this location

New bridges in Chickasaw, AL - historical statistics
  • New bridges - historical statistics
  • 21920-1929
  • 21950-1959
  • 61960-1969
  • 11970-1979
  • 41980-1989
  • 41990-1999
  • 32000-2009
Reconstructed bridges in Chickasaw, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Chickasaw, AL
Average Bridge Truck Traffic in Chickasaw, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 41.7%Satisfactory
  • 25.0%Fair
  • 8.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
  • 8.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
  • 8.3%Poor
  • 8.3%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Good
  • 71.4%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 152,  Location: 0.7 MI.N.OF US 331 (Lat: 32.307431,  Lng: -86.299678),  Route carried "on" structure: County highway 277,  Year Built: 1920,  Status: Closed,  Structure Length: 39.26m (128.81ft),  Average Daily Traffic: 3,320 (year 1990),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,580 (year 2025),  Design Load: H 15,  Features Intersected: CATOMA CREEK,  Facility Carried by Structure: NORMAN BRIDGE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 53,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.9m (22.6ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Serious,  Channel: Fair,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 39.26m (128.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2003,  Other Special Inspection Date: December 2004,  Bridge Improvement Cost: $5,923,000,  Roadway Improvement Cost: $592,000,  Total Project Cost: $6,515,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4251,  Location: .1 MI. N.E. HWY. 17 (Lat: 33.925169,  Lng: -88.146853),  Route carried "on" structure: County highway 35,  Year Built: 1952,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 490 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 728 (year 2036),  Design Load: H 15,  Features Intersected: PINE SPRINGS CREEK,  Facility Carried by Structure: RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $426,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $469,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 6175,  Location: 3 MI E OF LOCUST FORK (Lat: 33.884075,  Lng: -86.581344),  Route carried "on" structure: County highway 15,  Year Built: 1958,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 786 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,167 (year 2040),  Design Load: H 15,  Features Intersected: SAND VALLEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $21,000,  Total Project Cost: $232,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7116,  Location: 1.5 MI N CO RT 67 T5SR7E (Lat: 34.561872,  Lng: -85.880417),  Route carried "on" structure: County highway 102,  Year Built: 1960,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 310 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 461 (year 2040),  Design Load: H 15,  Features Intersected: STRAIGHT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.5m (34.4ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.66m (5.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $499,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $549,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 858,  Location: 1.3 MI N SR 45 (Lat: 30.763358,  Lng: -88.093108),  Route carried "on" structure: City street ,  Year Built: 1965,  Status: Open,  Structure Length: 8.11m (26.61ft),  Average Daily Traffic: 1,452 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,178 (year 2038),  Design Load: HS 20,  Features Intersected: I65,  Facility Carried by Structure: THOMPSON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 48.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,499,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $2,749,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9272,  Location: 1.1 MI N CELESTE ROAD (Lat: 30.842275,  Lng: -88.079350),  Route carried "on" structure: Interstate 65,  Year Built: 1967,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 51,074 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 76,611 (year 2038),  Design Load: HS 20,  Features Intersected: HELLS SWAMP CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.133,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.0m (118.1ft),  Skew: 14 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $4,584,000,  Roadway Improvement Cost: $458,000,  Total Project Cost: $5,042,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 12285,  Location: 0.37 MI N ALPINE ST (Lat: 30.781372,  Lng: -88.086928),  Route carried "on" structure: City street ,  Year Built: 1960,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 160 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 250 (year 2041),  Design Load: HS 20,  Features Intersected: BAYOU BARATARA,  Facility Carried by Structure: BARATARA DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.369,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $801,000,  Roadway Improvement Cost: $80,000,  Total Project Cost: $881,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 1232,  Location: 2.1 MI N US 45 (Lat: 30.767067,  Lng: -88.094236),  Route carried "on" structure: City street ,  Year Built: 1980,  Status: Open,  Structure Length: 8.10m (26.57ft),  Average Daily Traffic: 4,287 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 6,431 (year 2038),  Design Load: HS 20,  Features Intersected: I65,  Facility Carried by Structure: WEST LEE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.004,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 26.5m (86.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $5,370,000,  Roadway Improvement Cost: $537,000,  Total Project Cost: $5,907,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13906,  Location: 0.9 MI S SR 158 (Lat: 30.781825,  Lng: -88.072764),  Route carried "on" structure: US 43,  Year Built: 1986,  Status: Open,  Structure Length: 14.97m (49.11ft),  Average Daily Traffic: 14,103 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 21,155 (year 2038),  Design Load: HS 20,  Features Intersected: CHICKASABOGUE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.845,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 23.1m (75.8ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 10,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 23.1m (75.8ft),  Out-to-Out Width: 25.2m (82.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.74m (51.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Underwater Inspection Date: November 2020,  Bridge Improvement Cost: $8,850,000,  Roadway Improvement Cost: $885,000,  Total Project Cost: $9,735,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14324,  Location: Beaverton (Lat: 33.928833,  Lng: -88.024383),  Route carried "on" structure: US 278,  Year Built: 1926,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 2,323 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 3,716 (year 2040),  Design Load: H 15,  Features Intersected: Branch,  Facility Carried by Structure: AL-118
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.106,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 78.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $320,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $352,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 14467,  Location: 1.3 MI N OF I65 (Lat: 32.367914,  Lng: -86.300072),  Route carried "on" structure: Interstate 85,  Year Built: 1970,  Year Reconstructed: 1988,  Status: Open,  Structure Length: 5.15m (16.90ft),  Average Daily Traffic: 83,530 (year 2013),  Truck Traffic: 13%,  Average Future Daily Traffic: 110,089 (year 2033),  Design Load: HS 20,  Features Intersected: UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.221,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 30 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 32.0m (105.0ft),  Out-to-Out Width: 33.8m (110.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 55.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 6.17m (20.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,657,000,  Roadway Improvement Cost: $466,000,  Total Project Cost: $5,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 14476,  Location: TURKEY CREEK RD. (Lat: 31.759175,  Lng: -86.212331),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 80 (year 1993),  Average Future Daily Traffic: 88 (year 2033),  Design Load: HS 20,  Features Intersected: BEAR CREEK,  Facility Carried by Structure: TURKEY CREEK RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 70.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $297,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $327,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15161,  Location: 2.84 MILES NW OF CR-14 (Lat: 32.827600,  Lng: -86.165264),  Route carried "on" structure: County highway 18,  Year Built: 1991,  Status: Open,  Structure Length: 1.78m (5.84ft),  Average Daily Traffic: 152 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 226 (year 2040),  Design Load: HS 20,  Features Intersected: Swamp Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.48m (8.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $716,000,  Roadway Improvement Cost: $72,000,  Total Project Cost: $788,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 15263,  Location: 1.3MI. SW CO.RT.17 (Lat: 32.184369,  Lng: -87.927436),  Route carried "on" structure: County highway 462,  Year Built: 1990,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 50 (year 1990),  Average Future Daily Traffic: 70 (year 2042),  Design Load: H 10,  Features Intersected: LITTLE BEAVER CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 2.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 1.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.48m (4.86ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2022,  Other Special Inspection Date: Febuary 2022,  Bridge Improvement Cost: $223,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $245,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 15505,  Location: 2.74 MI N US 45 (Lat: 30.771986,  Lng: -88.095372),  Route carried "on" structure: Interstate 65,  Year Built: 1965,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 71,118 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 106,677 (year 2038),  Design Load: HS 20,  Features Intersected: EIGHTMILE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.589,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 39.9m (130.9ft),  Skew: 34 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 40.0m (131.2ft),  Out-to-Out Width: 41.9m (137.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $8,725,000,  Roadway Improvement Cost: $873,000,  Total Project Cost: $9,598,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 15539,  Location: 0.1 MI S SR 213 (Lat: 30.762194,  Lng: -88.125519),  Route carried "on" structure: US 45,  Year Built: 1992,  Status: Open,  Structure Length: 9.02m (29.59ft),  Average Daily Traffic: 15,638 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,457 (year 2038),  Design Load: HS 20,  Features Intersected: EIGHT MILE CREEK
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 9.936,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.4m (53.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 16.4m (53.8ft),  Out-to-Out Width: 19.7m (64.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 85.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 62.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.99m (32.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $4,385,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $4,824,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1659,  Location: 0.7 MI E US 43 (Lat: 30.764003,  Lng: -88.063803),  Route carried "on" structure: City street ,  Year Built: 1996,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,500 (year 2021),  Truck Traffic: 50%,  Average Future Daily Traffic: 1,650 (year 2041),  Design Load: HS 20,  Features Intersected: BRANCH FRM RESERVIOR,  Facility Carried by Structure: VIADUCT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.698,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 12.9m (42.3ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $396,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $436,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 17473,  Location: 3.8 MI N US 45 (Lat: 30.786875,  Lng: -88.100417),  Route carried "on" structure: Interstate 65,  Year Built: 2003,  Status: Open,  Structure Length: 17.34m (56.89ft),  Average Daily Traffic: 71,118 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 106,677 (year 2038),  Design Load: HS 20,  Features Intersected: CHICKASAW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.290,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 12,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 34.1m (111.9ft),  Out-to-Out Width: 35.4m (116.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 18.05m (59.22ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Underwater Inspection Date: June 2021,  Bridge Improvement Cost: $14,359,000,  Roadway Improvement Cost: $1,436,000,  Total Project Cost: $15,795,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1825,  Location: 0.2 MI E US 43 (Lat: 30.763886,  Lng: -88.073283),  Route carried "on" structure: City street ,  Year Built: 2001,  Status: Open,  Structure Length: 13.93m (45.70ft),  Average Daily Traffic: 2,200 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,064 (year 2040),  Design Load: HS 20,  Features Intersected: B-N * N-S RR SOUTH ST,  Facility Carried by Structure: VIADUCT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 14.73m (48.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,636,000,  Roadway Improvement Cost: $364,000,  Total Project Cost: $4,000,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 858,  Location: 1.3 MI N SR 45 (Lat: 30.763358,  Lng: -88.093108),  Route carried "under" structure: Interstate 65,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 70,680 (year 2018),  Truck Traffic: 11%,  Features Intersected: I65,  Facility Carried by Structure: THOMPSON BLVD
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 16.576,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 1232,  Location: 2.1 MI N US 45 (Lat: 30.767067,  Lng: -88.094236),  Route carried "under" structure: Interstate 65,  Year Built: 1980,  Structure Length: 0. m,  Average Daily Traffic: 70,680 (year 2018),  Truck Traffic: 11%,  Features Intersected: I65,  Facility Carried by Structure: WEST LEE ST
Minimum Vertical Clearance: 5.04m (16.54ft),  Kilometerpoint: 17.003,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 1825,  Location: 0.2 MI E US 43 (Lat: 30.763886,  Lng: -88.073283),  Route carried "under" structure: Bypass City street ,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2020),  Features Intersected: B-N * N-S RR SOUTH ST,  Facility Carried by Structure: VIADUCT RD
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Chickasaw, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.