Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chapmanville, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 358ft / 109mTotal length
  • $2,310,000Total costs
  • 108,631Total average daily traffic
  • 8,621Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chapmanville
  • No street view available for this location

New bridges in Chapmanville, WV - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 131970-1979
  • 71980-1989
  • 21990-1999
  • 32000-2009
  • 32010-2019
Reconstructed bridges in Chapmanville, WV - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Chapmanville, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.0%Good
  • 40.0%Satisfactory
  • 40.0%Fair
  • 4.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.0%Good
  • 44.0%Satisfactory
  • 40.0%Fair
  • 4.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.0%Good
  • 52.0%Satisfactory
  • 12.0%Fair
  • 24.0%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.8%Good
  • 54.2%Satisfactory
  • 20.8%Fair
  • 4.2%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 3A144,  Location: 0.01 MI S OF CR 119/30 (Lat: 37.985261,  Lng: -81.954311),  Route carried "on" structure: US 119,  Year Built: 1975,  Status: Open,  Structure Length: 0.63m (2.07ft),  Average Daily Traffic: 12,300 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 17,220 (year 2039),  Features Intersected: TRACE FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.511,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 23A004,  Location: 0.15 MI WEST OF WV 10 (Lat: 37.975450,  Lng: -82.019661),  Route carried "on" structure: County highway 300,  Year Built: 1989,  Status: Open,  Structure Length: 8.98m (29.46ft),  Average Daily Traffic: 3,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,411 (year 2039),  Design Load: HS 20,  Features Intersected: GUYANDOTTE RIVER,  Facility Carried by Structure: CR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: May 2021,  Underwater Inspection Date: September 2019,  Bridge Improvement Cost: $661,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $700,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A005,  Location: 0.01 MI WEST OF CR 3/2 (Lat: 37.938431,  Lng: -82.061631),  Route carried "on" structure: County highway 300,  Year Built: 1984,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 1,700 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,785 (year 2040),  Design Load: HS 20,  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.936,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2020,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $14,000,  Total Project Cost: $200,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A01,  Location: 0.01 MI NO OF CR 3 (Lat: 37.962339,  Lng: -82.048869),  Route carried "on" structure: County highway 304,  Year Built: 1989,  Status: Open,  Structure Length: 1.33m (4.36ft),  Average Daily Traffic: 650 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 683 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A024,  Location: 0.86 MI EAST OF US 119 (Lat: 37.974119,  Lng: -81.980489),  Route carried "on" structure: County highway 700,  Year Built: 1985,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 1,300 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,365 (year 2040),  Design Load: HS 20,  Features Intersected: GARRETT FORK,  Facility Carried by Structure: CR 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.384,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.16m (3.81ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2020,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $200,000 ( Estimate for 2016),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A075,  Location: 3.08 MI SOUTH OF CR 6 (Lat: 37.990569,  Lng: -81.985461),  Route carried "on" structure: US 11900,  Year Built: 1972,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 5,872 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,166 (year 2039),  Design Load: HS 20,  Features Intersected: MEETINGHOUSE BR TRACE FK,  Facility Carried by Structure: US 119 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.06m (0.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Total Project Cost: $20,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A076,  Location: 0.08 MI SOUTH OF CR 6 (Lat: 37.990689,  Lng: -81.985669),  Route carried "on" structure: US 11900,  Year Built: 1972,  Status: Open,  Structure Length: 3.83m (12.57ft),  Average Daily Traffic: 5,872 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,166 (year 2039),  Design Load: HS 20,  Features Intersected: MEETINGHOUSE BR TRACE FK,  Facility Carried by Structure: US 119 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.06m (0.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $15,000,  Total Project Cost: $20,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A086,  Location: 0.09 MI SOUTH OF CR 7 (Lat: 37.981619,  Lng: -81.991650),  Route carried "on" structure: US 11900,  Year Built: 1971,  Status: Open,  Structure Length: 5.90m (19.36ft),  Average Daily Traffic: 8,150 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,240 (year 2039),  Design Load: HS 20,  Features Intersected: GARRETT FORK,  Facility Carried by Structure: US 119 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.970,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $535,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A091,  Location: 0.09 MI SOUTH OF CR 7 (Lat: 37.981761,  Lng: -81.991831),  Route carried "on" structure: US 11900,  Year Built: 1971,  Status: Open,  Structure Length: 5.90m (19.36ft),  Average Daily Traffic: 8,150 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 15,240 (year 2039),  Design Load: HS 20,  Features Intersected: GARRETT FORK,  Facility Carried by Structure: US 119 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.970,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 23.5m (77.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $535,000 ( Estimate for 2017),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A095,  Location: 0.04 MI S.WV 10 EXIT RAMP (Lat: 37.974911,  Lng: -82.016519),  Route carried "on" structure: US 11900,  Year Built: 1971,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 6,350 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,846 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: WV 10,  Facility Carried by Structure: US 119 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.041,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.0m (105.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A102,  Location: 0.21 MI S. US 119 EXIT R. (Lat: 37.974750,  Lng: -82.018469),  Route carried "on" structure: US 11900,  Year Built: 1972,  Status: Open,  Structure Length: 5.57m (18.27ft),  Average Daily Traffic: 6,700 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,174 (year 2040),  Design Load: HS 20,  Features Intersected: CSX RAILROAD,  Facility Carried by Structure: US 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.897,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.2m (86.0ft),  Skew: 32 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.4m (66.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 23.9m (78.4ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 23A146,  Location: 0.01 MI NORTH OF CR 3 (Lat: 37.964100,  Lng: -82.046461),  Route carried "on" structure: County highway 334,  Year Built: 1989,  Status: Open,  Structure Length: 1.39m (4.56ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 66 (year 2038),  Design Load: HS 20,  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3/34
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23A165,  Location: 0.01 MI WEST OF CR 3 (Lat: 37.953631,  Lng: -82.056369),  Route carried "on" structure: County highway 309,  Year Built: 1980,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 132 (year 2038),  Design Load: HS 20,  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3/9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.329,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A166,  Location: 0.01 MI NORTH OF CR 3 (Lat: 37.969569,  Lng: -82.038261),  Route carried "on" structure: County highway 319,  Year Built: 1978,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 20 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 26 (year 2039),  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3/19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020
Find on map >>   Show street view

Structure Number: 23A168,  Location: 0.05 MI. N. OF CR. 4/1 (Lat: 37.995461,  Lng: -82.006131),  Route carried "on" structure: County highway 400,  Year Built: 1988,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 600 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 792 (year 2037),  Design Load: HS 20,  Features Intersected: GARRETT FORK,  Facility Carried by Structure: CR 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 23A173,  Location: 0.02 MI N. OF CR 119/27 (Lat: 37.974500,  Lng: -82.019461),  Route carried "on" structure: US 11900,  Year Built: 1972,  Status: Open,  Structure Length: 20.69m (67.88ft),  Average Daily Traffic: 13,156 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,601 (year 2039),  Design Load: HS 20,  Features Intersected: GUYANDOTTE RIVER,  Facility Carried by Structure: US 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.639,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 20 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.4m (152.2ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 23A255,  Location: 0.01 MILE SOUTH OF CR 7 (Lat: 37.968361,  Lng: -81.959361),  Route carried "on" structure: County highway 713,  Year Built: 1998,  Status: Posted for load,  Structure Length: 0.74m (2.43ft),  Average Daily Traffic: 50 (year 2019),  Average Future Daily Traffic: 66 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: ROCKLICK FORK,  Facility Carried by Structure: CR 7/13
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.1m (23.3ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $30,000,  Total Project Cost: $30,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A267,  Location: 0.01 MILE WEST OF CR 3 (Lat: 37.942119,  Lng: -82.060689),  Route carried "on" structure: County highway 330,  Year Built: 1993,  Status: Open,  Structure Length: 0.81m (2.66ft),  Average Daily Traffic: 20 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 27 (year 2037),  Design Load: HS 20,  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3/30
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.8m (25.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.2m (20.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 23A271,  Location: 0.02 MILE WEST OF CR 3/2 (Lat: 37.927031,  Lng: -82.068169),  Route carried "on" structure: County highway 341,  Year Built: 2000,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 40 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 53 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: CRAWLEY CREEK,  Facility Carried by Structure: CR 3/41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $60,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $70,000 ( Estimate for 2018),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A284,  Location: 0.01 MILE SOUTH OF CR 2 (Lat: 38.007311,  Lng: -81.978050),  Route carried "on" structure: County highway 206,  Year Built: 1960,  Year Reconstructed: 2019,  Status: Open,  Structure Length: 1.24m (4.07ft),  Average Daily Traffic: 10 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11 (year 2040),  Design Load: HL 93,  Features Intersected: BIG CREEK,  Facility Carried by Structure: CR 2/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.14m (3.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 23A301,  Location: 0.01 MILE SOUTH OF CR 7 (Lat: 37.970181,  Lng: -81.970581),  Route carried "on" structure: County highway 719,  Year Built: 2002,  Status: Open,  Structure Length: 1.51m (4.95ft),  Average Daily Traffic: 20 (year 2018),  Average Future Daily Traffic: 27 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: GARRETT FORK,  Facility Carried by Structure: CR 7/19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 3.0m (9.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Epoxy,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A314,  Location: 0.52 MILE NORTH OF US 119 (Lat: 37.986769,  Lng: -81.996231),  Route carried "on" structure: County highway 400,  Year Built: 2006,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 700 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 747 (year 2039),  Design Load: HL 93,  Features Intersected: GARRETTS FORK,  Facility Carried by Structure: COUNTY ROUTE 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A347,  Location: 0.23 miles east of CR 7/6 (Lat: 37.979569,  Lng: -81.986119),  Route carried "on" structure: County highway 700,  Year Built: 2012,  Status: Open,  Structure Length: 2.26m (7.41ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,640 (year 2038),  Design Load: HL 93,  Features Intersected: Garrett Fork,  Facility Carried by Structure: CR 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A358,  Location: 1.43 MILE EAST OF US 119 (Lat: 37.970869,  Lng: -81.971650),  Route carried "on" structure: County highway 7,  Year Built: 2012,  Status: Open,  Structure Length: 1.32m (4.33ft),  Average Daily Traffic: 1,515 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,591 (year 2039),  Design Load: HL 93,  Features Intersected: GARRETT FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.301,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Poor,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2020,  Other Special Inspection Date: June 2021,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 23A37,  Location: 0.78 MI EAST OF US 119 (Lat: 37.974700,  Lng: -81.981550),  Route carried "on" structure: County highway 700,  Year Built: 2014,  Status: Open,  Structure Length: 1.57m (5.15ft),  Average Daily Traffic: 2,000 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,640 (year 2038),  Design Load: HL 93,  Features Intersected: GARRETT FORK,  Facility Carried by Structure: COUNTY ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.255,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A371,  Location: 0.04 MI S.WV 10 EXIT RAMP (Lat: 37.974831,  Lng: -82.017069),  Route carried "on" structure: US 11900,  Year Built: 1971,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 5.24m (17.19ft),  Average Daily Traffic: 6,350 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 6,846 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: WV RT 10,  Facility Carried by Structure: US 119
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.041,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.0m (105.0ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 23A372,  Location: 0.02 MI N OF CR 119/27 (Lat: 37.973319,  Lng: -82.021039),  Route carried "on" structure: US 119,  Year Built: 1972,  Status: Open,  Structure Length: 20.69m (67.88ft),  Average Daily Traffic: 13,156 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,601 (year 2039),  Design Load: HS 20,  Features Intersected: GUYANDOTTE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.639,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 30 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 2,  Length of Maximum Span: 46.4m (152.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 23A095,  Location: 0.04 MI S.WV 10 EXIT RAMP (Lat: 37.974869,  Lng: -82.016750),  Route carried "under" structure: State highway 1000,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,300 (year 2013),  Truck Traffic: 7%,  Features Intersected: WV 10,  Facility Carried by Structure: US 119 SB
Minimum Vertical Clearance: 7.37m (24.18ft),  Kilometerpoint: 54.138,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 23A371,  Location: 0.04 MI S.WV 10 EXIT RAMP (Lat: 37.974869,  Lng: -82.016750),  Route carried "under" structure: State highway 1000,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 4,300 (year 2013),  Truck Traffic: 7%,  Features Intersected: WV RT 10,  Facility Carried by Structure: US 119
Minimum Vertical Clearance: 7.37m (24.18ft),  Kilometerpoint: 54.138,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 20.7m (67.9ft)

Discuss Chapmanville, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.