Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Chalco, Nebraska (NE)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 315ft / 95.8mTotal length
  • 657,320Total average daily traffic
  • 71,592Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Chalco
  • No street view available for this location

New bridges in Chalco, NE - historical statistics
  • New bridges - historical statistics
  • 71950-1959
  • 11980-1989
  • 81990-1999
  • 32000-2009
Reconstructed bridges in Chalco, NE - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Chalco, NE
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.1%Very good
  • 33.3%Good
  • 44.4%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Very good
  • 33.3%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 55.6%Good
  • 11.1%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 66.7%Very good
  • 16.7%Good
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: C007710425,  Location: 2N 4.5E GRETNA (Lat: 41.176700,  Lng: -96.148300),  Route carried "on" structure: County highway 3772,  Year Built: 1980,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 10,695 (year 2011),  Average Future Daily Traffic: 12,090 (year 2033),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 33.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 22.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: C007711925,  Location: .5W OF CHALCO (Lat: 41.185800,  Lng: -96.158300),  Route carried "on" structure: County highway 3772,  Year Built: 1995,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 6,970 (year 2011),  Average Future Daily Traffic: 10,804 (year 2033),  Design Load: HS 20,  Features Intersected: S BR PAPILLION CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.694,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.66m (12.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S050 08596,  Location: JCT N50/N370 .7S (Lat: 41.137800,  Lng: -96.139100),  Route carried "on" structure: State highway 50,  Year Built: 2005,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 12,470 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 20,576 (year 2038),  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.834,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Very good,  Culverts: Satisfactory,  Operating Rating: 43.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: S050 08662,  Location: JCT N 370/50 (Lat: 41.147300,  Lng: -96.138800),  Route carried "on" structure: State highway 50,  Year Built: 2000,  Status: Open,  Structure Length: 7.62m (25.00ft),  Average Daily Traffic: 12,470 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 20,576 (year 2038),  Features Intersected: N370
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.940,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.8m (124.0ft),  Curb-To-Curb Width: 29.9m (98.1ft),  Out-to-Out Width: 30.6m (100.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S050 08894,  Location: 3SW MILLARD (Lat: 41.180500,  Lng: -96.138900),  Route carried "on" structure: State highway 50,  Year Built: 1995,  Status: Open,  Structure Length: 15.97m (52.40ft),  Average Daily Traffic: 35,690 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 53,535 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BNSF/S PPLN CR 073-185-K
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.313,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 33.5m (109.9ft),  Curb or Sidewalk Widths: Left: 2.7m (8.9ft),  Right: 0.0m,  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 24.2m (79.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 43922,  Location: N370 INTRCHG (Lat: 41.147000,  Lng: -96.158400),  Route carried "on" structure: Interstate 80,  Year Built: 1992,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.96m (26.12ft),  Average Daily Traffic: 53,360 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 74,704 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: N370
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.685,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.9m (98.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 52.4m (171.9ft),  Curb-To-Curb Width: 37.8m (124.0ft),  Out-to-Out Width: 38.4m (126.0ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 61.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 44066,  Location: N50 INTRCHG (Lat: 41.161800,  Lng: -96.138800),  Route carried "on" structure: State highway 50,  Year Built: 1958,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 26,190 (year 2018),  Truck Traffic: 12%,  Average Future Daily Traffic: 39,285 (year 2038),  Design Load: HS 20,  Features Intersected: I80
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.101,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 24 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.2m (76.1ft),  Curb-To-Curb Width: 26.2m (86.0ft),  Out-to-Out Width: 27.0m (88.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 44207,  Location: 2N N50 INTRCHG (Lat: 41.176200,  Lng: -96.120800),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Year Reconstructed: 2000,  Status: Open,  Structure Length: 21.58m (70.80ft),  Average Daily Traffic: 77,980 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 116,970 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: BN/FAS 3789/CR 073-038-X
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.144,  Lanes on structure: 8,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 37.8m (124.0ft),  Skew: 22 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 46.3m (151.9ft),  Curb-To-Curb Width: 36.9m (121.1ft),  Out-to-Out Width: 38.6m (126.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 44292,  Location: JCT I80/126TH ST (Lat: 41.185100,  Lng: -96.108900),  Route carried "on" structure: County highway 5129,  Year Built: 1990,  Status: Open,  Structure Length: 7.80m (25.59ft),  Average Daily Traffic: 22,500 (year 2010),  Average Future Daily Traffic: 22,500 (year 2033),  Design Load: HS 20,  Features Intersected: I80
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.093,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.5m (86.9ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 20.4m (66.9ft),  Out-to-Out Width: 23.0m (75.5ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 44324,  Location: .2SW DOUGLAS/SARPY CL (Lat: 41.188300,  Lng: -96.104300),  Route carried "on" structure: County highway 5022,  Year Built: 1990,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 16,425 (year 2010),  Average Future Daily Traffic: 16,425 (year 2033),  Features Intersected: I80
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.550,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.6m (61.0ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Very good,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.10m (23.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S080 44342,  Location: US275/N92 INTRCHG 1S (Lat: 41.189900,  Lng: -96.102000),  Route carried "on" structure: Interstate 80,  Year Built: 1959,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 103,755 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 166,008 (year 2038),  Features Intersected: FAU 5003/UP/CR 815-679-G
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.361,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 48.6m (159.4ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 48.6m (159.4ft),  Out-to-Out Width: 48.6m (159.4ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 62.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: S050 08662,  Location: JCT N 370/50 (Lat: 41.147300,  Lng: -96.138800),  Route carried "under" structure: State highway 370,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 15,930 (year 2012),  Truck Traffic: 4%,  Features Intersected: N370,  Facility Carried by Structure: N50
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.838,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.8m (124.0ft)

Find on map >>   Show street view

Structure Number: S080 43922,  Location: N370 INTRCHG (Lat: 41.147000,  Lng: -96.158400),  Route carried "under" structure: State highway 370,  Year Built: 1992,  Structure Length: 0. m,  Average Daily Traffic: 12,210 (year 2012),  Truck Traffic: 6%,  Features Intersected: N370,  Facility Carried by Structure: I80
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 0.674,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.4m (171.9ft)

Find on map >>   Show street view

Structure Number: S080 44066,  Location: N50 INTRCHG (Lat: 41.161800,  Lng: -96.138800),  Route carried "under" structure: Interstate 80,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 63,185 (year 2013),  Truck Traffic: 15%,  Features Intersected: I80,  Facility Carried by Structure: N50
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 70.917,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.2m (76.1ft)

Find on map >>   Show street view

Structure Number: S080 44207,  Location: 2N N50 INTRCHG (Lat: 41.176200,  Lng: -96.120800),  Route carried "under" structure: Interstate 80,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2007),  Features Intersected: BN/FAS 3789/CR 073-038-X
Minimum Vertical Clearance: 7.74m (25.39ft),  Kilometerpoint: 71.144,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: S080 44207,  Location: 2N N50 INTRCHG (Lat: 41.176200,  Lng: -96.120800),  Route carried "under" structure: Interstate 80,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 8,200 (year 2007),  Features Intersected: BN/FAS 3789/CR 073-038-X
Minimum Vertical Clearance: 7.92m (25.98ft),  Kilometerpoint: 71.144,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 46.3m (151.9ft)

Find on map >>   Show street view

Structure Number: S080 44292,  Location: JCT I80/126TH ST (Lat: 41.185100,  Lng: -96.108900),  Route carried "under" structure: Interstate 80,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 82,755 (year 2013),  Truck Traffic: 12%,  Features Intersected: I80,  Facility Carried by Structure: 126TH ST/FAU 5129
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 71.281,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: S080 44324,  Location: .2SW DOUGLAS/SARPY CL (Lat: 41.188300,  Lng: -96.104300),  Route carried "under" structure: Interstate 80,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 82,755 (year 2013),  Truck Traffic: 12%,  Features Intersected: I80,  Facility Carried by Structure: HARRISON/FAU 5022
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 71.333,  Lanes on structure: 6,  Lanes under structure: 6,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.3m (119.1ft)

Find on map >>   Show street view

Structure Number: S080 44342,  Location: US275/N92 INTRCHG 1S (Lat: 41.189900,  Lng: -96.102000),  Route carried "under" structure: City street 5003,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 5,580 (year 2010),  Features Intersected: FAU 5003/UP/CR 815-679-G,  Facility Carried by Structure: I80
Minimum Vertical Clearance: 7.13m (23.39ft),  Kilometerpoint: 16.130,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 39.6m (129.9ft)

Discuss Chalco, Nebraska (NE) on our hugely popular Nebraska forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.