Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Central Valley, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 56ft / 17.2mTotal length
  • $18,568,000Total costs
  • 149,012Total average daily traffic
  • 7,837Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Central Valley
  • No street view available for this location

New bridges in Central Valley, NY - historical statistics
  • New bridges - historical statistics
  • 41900-1909
  • 11930-1939
  • 71950-1959
  • 12010-2019
Reconstructed bridges in Central Valley, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Central Valley, NY
Average Bridge Truck Traffic in Central Valley, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 50.0%Satisfactory
  • 16.7%Poor
  • 16.7%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Good
  • 50.0%Fair
  • 16.7%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Good
  • 50.0%Satisfactory
  • 16.7%Fair
  • 16.7%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 200336,  Location: 2000' SE JCT Rt.32 & CR 9 (Lat: 41.327467,  Lng: -74.115144),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 652 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 913 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WOODBURY CREEK,  Facility Carried by Structure: ESTRADA ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $247,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $392,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 334541,  Location: IN CENTRAL VALLEY (Lat: 41.333969,  Lng: -74.118314),  Route carried "on" structure: County highway ,  Year Built: 1935,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 3,822 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,728 (year 2040),  Design Load: HS 20,  Features Intersected: WOODBURY CREEK,  Facility Carried by Structure: SMITH CLOVE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $641,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334542,  Location: 0.4 MI SE OF HIGHL. MILLS (Lat: 41.344594,  Lng: -74.121014),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 999 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,236 (year 2040),  Design Load: H 20,  Features Intersected: WOODBURY CREEK,  Facility Carried by Structure: PARK AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $590,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $935,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 500337,  Location: 1.6 MI N INT US-6 and I87 (Lat: 41.326342,  Lng: -74.112622),  Route carried "on" structure: Other road ,  Year Built: 1953,  Year Reconstructed: 2016,  Status: Open,  Structure Length: 6.86m (22.51ft),  Average Daily Traffic: 652 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 913 (year 2039),  Design Load: HS 20,  Features Intersected: 87IX SB, RTE I87,  Facility Carried by Structure: ESTRADA RD
Minimum Vertical Clearance: 30.18m (99.02ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.85m (22.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $3,369,000,  Roadway Improvement Cost: $1,973,000,  Total Project Cost: $5,343,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5514279,  Location: 2.2 MI N. U.S. RTE 6/I-87 (Lat: 41.335017,  Lng: -74.115625),  Route carried "on" structure: Interstate 87,  Year Built: 1953,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 39,792 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 67,383 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: COUNTY ROUTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.906,  Lanes on structure: 4,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 33.2m (108.9ft),  Out-to-Out Width: 34.4m (112.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,742,000,  Roadway Improvement Cost: $2,777,000,  Total Project Cost: $7,519,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 551428,  Location: 0.6 MI SE OF HIGHL. MILLS (Lat: 41.342775,  Lng: -74.117414),  Route carried "on" structure: Other road ,  Year Built: 1953,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 999 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,236 (year 2040),  Design Load: HS 20,  Features Intersected: 87IX, RTE I87,  Facility Carried by Structure: PINE HILL ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 8.1m (26.6ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Poor,  Operating Rating: 60.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 47.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,357,000,  Roadway Improvement Cost: $1,380,000,  Total Project Cost: $3,738,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 500337,  Location: 1.6 MI N INT US-6 and I87 (Lat: 41.326342,  Lng: -74.112622),  Route carried "under" structure: Interstate 87,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 48,019 (year 2015),  Features Intersected: 87IX SB, RTE I87,  Facility Carried by Structure: ESTRADA RD
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 74.690,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 5514279,  Location: 2.2 MI N. U.S. RTE 6/I-87 (Lat: 41.335017,  Lng: -74.115625),  Route carried "under" structure: County highway ,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 3,822 (year 2020),  Truck Traffic: 2%,  Features Intersected: COUNTY ROUTE 9,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 0.274,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 551428,  Location: 0.6 MI SE OF HIGHL. MILLS (Lat: 41.342775,  Lng: -74.117414),  Route carried "under" structure: Interstate 87,  Year Built: 1953,  Structure Length: 0. m,  Average Daily Traffic: 48,006 (year 2014),  Features Intersected: 87IX, RTE I87,  Facility Carried by Structure: PINE HILL ROAD
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 76.556,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 700335,  Location: 0.4 MI E OF CENTRL VALLEY (Lat: 41.328789,  Lng: -74.117808),  Route carried "under" structure: Other road ,  Year Built: 1908,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 2021),  Features Intersected: ESTRADA ROAD,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 3.25m (10.66ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 8.8m (28.9ft)

Find on map >>   Show street view

Structure Number: 771227,  Location: 1 MI N OF CENTRAL VALLEY (Lat: 41.342861,  Lng: -74.120122),  Route carried "under" structure: Other road ,  Year Built: 1908,  Structure Length: 0. m,  Average Daily Traffic: 999 (year 2020),  Truck Traffic: 3%,  Features Intersected: PINE HILL ROAD,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 7.9m (25.9ft)

Find on map >>   Show street view

Structure Number: 771228,  Location: IN CENTRAL VALLEY (Lat: 41.333867,  Lng: -74.118447),  Route carried "under" structure: County highway ,  Year Built: 1908,  Structure Length: 0. m,  Average Daily Traffic: 1,000 (year 2021),  Features Intersected: SMITH CLOVE R CR9,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 9.4m (30.8ft)

Find on map >>   Show street view

Structure Number: 771297,  Location: IN CENTRAL VALLEY (Lat: 41.331778,  Lng: -74.118056),  Route carried "under" structure: Other road ,  Year Built: 1908,  Structure Length: 0. m,  Average Daily Traffic: 50 (year 2021),  Features Intersected: LAURA LANE,  Facility Carried by Structure: MNRR PJ LINE
Minimum Vertical Clearance: 2.87m (9.42ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 7.9m (25.9ft)

Discuss Central Valley, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.