Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Canton, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 148ft / 45.2mTotal length
  • $22,605,000Total costs
  • 65,819Total average daily traffic
  • 4,076Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Canton
  • No street view available for this location

New bridges in Canton, NY - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 51950-1959
  • 51980-1989
  • 31990-1999
  • 32010-2019
Reconstructed bridges in Canton, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11990-1999
  • 22000-2009
  • 22010-2019
Average Bridge Daily Traffic in Canton, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 20.0%Very good
  • 46.7%Good
  • 6.7%Satisfactory
  • 6.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 26.7%Excellent
  • 33.3%Very good
  • 33.3%Good
  • 6.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 13.3%Excellent
  • 26.7%Very good
  • 53.3%Good
  • 6.7%Critical
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Excellent
  • 33.3%Very good
  • 46.7%Good
  • 6.7%Satisfactory
  • 6.7%Fair
Find on map >>   Show street view

Structure Number: 100877,  Location: VIL CANTON-.1 MI E JCT68W (Lat: 44.595131,  Lng: -75.175078),  Route carried "on" structure: State highway 11,  Year Built: 1981,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 13,965 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,030 (year 2040),  Design Load: HS 20,  Features Intersected: GRASSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.139,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 22 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 42.6m (139.8ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 71.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.35m (14.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,157,000,  Roadway Improvement Cost: $1,263,000,  Total Project Cost: $3,421,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100878,  Location: VIL CANTON-.3 MI E JCT68W (Lat: 44.595247,  Lng: -75.173842),  Route carried "on" structure: US 11,  Year Built: 1981,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 13,965 (year 2014),  Truck Traffic: 8%,  Average Future Daily Traffic: 14,030 (year 2040),  Design Load: HS 20,  Features Intersected: GRASSE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 49.251,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 21 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.8m (58.4ft),  Out-to-Out Width: 21.3m (69.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.97m (22.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,010,000,  Roadway Improvement Cost: $1,763,000,  Total Project Cost: $4,772,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 10088,  Location: 3.5 MI NE JCT US11 &SH310 (Lat: 44.626194,  Lng: -75.092617),  Route carried "on" structure: US 11,  Year Built: 1981,  Year Reconstructed: 2006,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 7,828 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,902 (year 2040),  Design Load: HL 93,  Features Intersected: TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.782,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.3m (40.4ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $531,000,  Roadway Improvement Cost: $311,000,  Total Project Cost: $843,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 102931,  Location: 0.6 MI SE JCT RTS 68 + 11 (Lat: 44.591750,  Lng: -75.137581),  Route carried "on" structure: State highway 68,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,696 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,060 (year 2040),  Design Load: H 20,  Features Intersected: TRACY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.398,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $664,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102932,  Location: 2.0 MI SE JCT RTS 68 + 11 (Lat: 44.581683,  Lng: -75.117422),  Route carried "on" structure: State highway 68,  Year Built: 1959,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 1,696 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,706 (year 2040),  Design Load: H 20,  Features Intersected: GRANNIS BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.377,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $398,000,  Total Project Cost: $1,077,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102933,  Location: 4.3 MI SE JCT RTS 68 + 11 (Lat: 44.572486,  Lng: -75.086458),  Route carried "on" structure: State highway 68,  Year Built: 1959,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 1,696 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,706 (year 2040),  Design Load: H 20,  Features Intersected: BOYDEN BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.193,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $338,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $535,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 222161,  Location: 4.0 MI NW OF CRARY MILLS (Lat: 44.629439,  Lng: -75.082928),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Posted for load,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 283 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 396 (year 2036),  Features Intersected: TROUT BROOK,  Facility Carried by Structure: AMES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.409,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Critical,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of replacement,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.76m (2.49ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $193,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $305,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322094,  Location: 1.2 MI EAST OF CANTON (Lat: 44.586664,  Lng: -75.131556),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 2,424 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,394 (year 2038),  Design Load: HL 93,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: PIKE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.154,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $578,000,  Roadway Improvement Cost: $338,000,  Total Project Cost: $916,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334062,  Location: .3 MI NW OF PYRITES (Lat: 44.523394,  Lng: -75.192728),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 1,101 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,541 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: GRASSE RIVER,  Facility Carried by Structure: CO RD 21
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.661,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 43.2m (141.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,028,000,  Roadway Improvement Cost: $602,000,  Total Project Cost: $1,629,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334063,  Location: 3 MI SE OF CANTON (Lat: 44.556322,  Lng: -75.113406),  Route carried "on" structure: County highway ,  Year Built: 1986,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,811 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,889 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: CR 27, FINE CTN L
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.145,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $689,000,  Roadway Improvement Cost: $404,000,  Total Project Cost: $1,093,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334064,  Location: 0.2 MI SE OF CANTON (Lat: 44.584292,  Lng: -75.158117),  Route carried "on" structure: County highway ,  Year Built: 1994,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 3,702 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,861 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: CR27FNE-CNTN-LSBN
Minimum Vertical Clearance: 5.48m (17.98ft),  Kilometerpoint: 44.988,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Wood or Timber,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.23m (13.88ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Critical Feature Inspection Date: August 2020,  Bridge Improvement Cost: $2,095,000,  Roadway Improvement Cost: $1,227,000,  Total Project Cost: $3,321,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334065,  Location: 2 MI NE OF CANTON (Lat: 44.610394,  Lng: -75.117628),  Route carried "on" structure: Other road ,  Year Built: 1959,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 609 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 853 (year 2038),  Features Intersected: TRACY BROOK,  Facility Carried by Structure: COWAN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.848,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 36.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $190,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $302,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334067,  Location: 3.5 MILES NE OF PYRITES (Lat: 44.540133,  Lng: -75.128006),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 2.03m (6.66ft),  Average Daily Traffic: 168 (year 2018),  Truck Traffic: 1%,  Average Future Daily Traffic: 235 (year 2038),  Features Intersected: LITTLE RIVER,  Facility Carried by Structure: LITTLE RIVER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Operating Rating: 89.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 69.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.03m (6.66ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $504,000,  Roadway Improvement Cost: $295,000,  Total Project Cost: $799,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 334071,  Location: 1 MI SOUTH RT11 IN CANTON (Lat: 44.582747,  Lng: -75.167014),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 913 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 922 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: GRASSE RIVER,  Facility Carried by Structure: MINER STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.546,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.47m (27.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,438,000,  Roadway Improvement Cost: $842,000,  Total Project Cost: $2,280,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33416,  Location: 4.0 MI S OF WEST POTSDAM (Lat: 44.639361,  Lng: -75.090222),  Route carried "on" structure: County highway ,  Year Built: 2019,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 566 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 792 (year 2037),  Design Load: HS 20,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: CR35CRRYMLLS-NRWD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.7m (81.0ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $409,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $648,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 700876,  Location: .08 MI.SW JCT RTS 11 & 68 (Lat: 44.587528,  Lng: -75.178669),  Route carried "under" structure: US 11,  Year Built: 1985,  Structure Length: 0. m,  Average Daily Traffic: 5,304 (year 2000),  Features Intersected: RTE 11,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 48.318,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 29.2m (95.8ft)

Find on map >>   Show street view

Structure Number: 700879,  Location: .7 MI NE JCT RTS 11 + 68 (Lat: 44.603425,  Lng: -75.135639),  Route carried "under" structure: US 11,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 8,092 (year 2000),  Features Intersected: RTE 11,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 52.534,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 17.9m (58.7ft)

Discuss Canton, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.