Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cairo, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 14Number of bridges
  • 105ft / 32.0mTotal length
  • $4,811,000Total costs
  • 5,646Total average daily traffic
  • 412Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cairo
  • No street view available for this location

New bridges in Cairo, WV - historical statistics
  • New bridges - historical statistics
  • 21910-1919
  • 11920-1929
  • 11930-1939
  • 21940-1949
  • 31960-1969
  • 11970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 12010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Good
  • 11.1%Satisfactory
  • 22.2%Fair
  • 33.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 30.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
  • 30.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
  • 10.0%Poor
  • 10.0%Serious
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 45.5%Good
  • 27.3%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Find on map >>   Show street view

Structure Number: 43A027,  Location: 0.02 MILE WEST WV 31 (Lat: 39.211631,  Lng: -81.158339),  Route carried "on" structure: County highway 8,  Year Built: 1990,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 30 (year 2018),  Average Future Daily Traffic: 36 (year 2038),  Design Load: HS 20,  Features Intersected: BIG RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.6m (18.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.25m (4.10ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2021,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $225,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $275,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A041,  Location: 0.08 MI WEST OF CR 15/2 (Lat: 39.172361,  Lng: -81.189231),  Route carried "on" structure: County highway 15,  Year Built: 1925,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 150 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 164 (year 2038),  Features Intersected: SHEEP RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.679,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $450,000 ( Estimate for 2015),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A042,  Location: 0.05 M WEST OF WV 31 (Lat: 39.189261,  Lng: -81.162800),  Route carried "on" structure: County highway 15,  Year Built: 1949,  Status: Posted for load,  Structure Length: 6.18m (20.28ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 164 (year 2039),  Design Load: HS 15,  Features Intersected: NORTH FORK HUGHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.282,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 22.4m (73.5ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.28m (20.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $800,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $801,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A092,  Location: 0.01 MI. S. OF CR. 14 (Lat: 39.198889,  Lng: -81.153061),  Route carried "on" structure: County highway 315,  Year Built: 1914,  Status: Posted for load,  Structure Length: 0.84m (2.76ft),  Average Daily Traffic: 10 (year 2019),  Average Future Daily Traffic: 13 (year 2039),  Features Intersected: RUSH RUN,  Facility Carried by Structure: COUNTY ROUTE 31/5
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.947,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.5m (24.6ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Serious,  Channel: Fair,  Operating Rating: 6.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: High priority of replacement,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $375,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Gravel
Find on map >>   Show street view

Structure Number: 43A093,  Location: 0.01 MI. S. OF WV 31 (Lat: 39.185081,  Lng: -81.146069),  Route carried "on" structure: County highway 316,  Year Built: 1912,  Status: Posted for load,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 60 (year 2018),  Average Future Daily Traffic: 72 (year 2038),  Features Intersected: ADDIS RUN,  Facility Carried by Structure: CR 31/6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.603,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.7m (15.4ft)

Condition: Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 11.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $250,000,  Total Project Cost: $650,000
Find on map >>   Show street view

Structure Number: 43A15,  Location: 0.04 M SOUTH OF CR 31/11 (Lat: 39.218031,  Lng: -81.161569),  Route carried "on" structure: State highway 31,  Year Built: 1940,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 850 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 927 (year 2038),  Design Load: H 15,  Features Intersected: BIG RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.898,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 0.9m (3.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $333,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $340,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A152,  Location: 0.01 MILE WEST OF WV 31 (Lat: 39.208611,  Lng: -81.157450),  Route carried "on" structure: County highway 314,  Year Built: 1937,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 246 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 293 (year 2038),  Features Intersected: NORTH FORK HUGHES RIVER,  Facility Carried by Structure: COUNTY ROUTE 31/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.663,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.9m (124.3ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $600,000,  Total Project Cost: $1,300,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 43A162,  Location: 0.52 MILE EAST OF CR 8/8 (Lat: 39.213569,  Lng: -81.120531),  Route carried "on" structure: County highway 14,  Year Built: 1980,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 298 (year 2039),  Features Intersected: GAP RUN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.541,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $400,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $450,000 ( Estimate for 2016)
Find on map >>   Show street view

Structure Number: 43A182,  Location: 0.01 MILE EAST OF CR 8 (Lat: 39.223350,  Lng: -81.121939),  Route carried "on" structure: County highway 5,  Year Built: 2003,  Status: Open,  Structure Length: 5.91m (19.39ft),  Average Daily Traffic: 200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 238 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: NORTH FORK HUGHES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.352,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 42.2m (138.5ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.91m (19.39ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Critical Feature Inspection Date: March 2021,  Bridge Improvement Cost: $55,000,  Roadway Improvement Cost: $5,000,  Total Project Cost: $60,000 ( Estimate for 2015),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 43A2,  Location: .10 Mi.South To C.R. 31/4 (Lat: 39.209900,  Lng: -81.158989),  Route carried "on" structure: State highway 31,  Year Built: 2019,  Status: Open,  Structure Length: 7.89m (25.89ft),  Average Daily Traffic: 700 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 798 (year 2039),  Design Load: HL 93,  Features Intersected: North Fork Hughes River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.804,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 36.3m (119.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.89m (25.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 54A092,  Location: 0.02 M SOUTH OF CR 40/2 (Lat: 39.256000,  Lng: -81.175600),  Route carried "on" structure: County highway 42,  Year Built: 1976,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 750 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,118 (year 2039),  Design Load: HS 20,  Features Intersected: LITTLE TYGART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.536,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.5m (47.6ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 5.0m (16.4ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $80,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $110,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 54A114,  Location: 1.32 MI S OF CR 21 (Lat: 39.220000,  Lng: -81.203500),  Route carried "under" structure: County highway 2131,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 400 (year 0013),  Features Intersected: CR 21/31,  Facility Carried by Structure: I-77 SBL
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 2.124,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 18.8m (61.7ft)

Find on map >>   Show street view

Structure Number: 54A115,  Location: 8.37 MILES S OF WV 14 (Lat: 39.242000,  Lng: -81.195500),  Route carried "under" structure: County highway 2100,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 1,100 (year 0010),  Truck Traffic: 8%,  Features Intersected: CR 21,  Facility Carried by Structure: I-77 NBL
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 3.251,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 22.6m (74.1ft)

Find on map >>   Show street view

Structure Number: 54A116,  Location: 8.37 MILES S OF WV 14 (Lat: 39.242000,  Lng: -81.195500),  Route carried "under" structure: County highway 2100,  Year Built: 1968,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 0007),  Truck Traffic: 8%,  Features Intersected: CR 21,  Facility Carried by Structure: I-77 SBL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 3.251,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 22.6m (74.1ft)

Discuss Cairo, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.