Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Cairo, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 197ft / 60.1mTotal length
  • $25,503,000Total costs
  • 29,714Total average daily traffic
  • 1,975Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Cairo
  • No street view available for this location

New bridges in Cairo, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 81960-1969
  • 11970-1979
  • 51990-1999
  • 42000-2009
  • 32010-2019
  • 12020-2022
Reconstructed bridges in Cairo, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 31980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Cairo, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.6%Excellent
  • 5.9%Very good
  • 47.1%Good
  • 17.6%Satisfactory
  • 5.9%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Excellent
  • 21.1%Very good
  • 36.8%Good
  • 5.3%Satisfactory
  • 10.5%Fair
  • 5.3%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Excellent
  • 36.8%Very good
  • 15.8%Good
  • 26.3%Satisfactory
  • 5.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 33.3%Good
  • 42.9%Satisfactory
  • 23.8%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 1017751,  Location: .2 M SE JCT SH23/32&SH145 (Lat: 42.307033,  Lng: -74.002031),  Route carried "on" structure: State highway 23,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 4,568 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,549 (year 2040),  Design Load: HS 20,  Features Intersected: CR41, SHINGLE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.408,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,188,000,  Roadway Improvement Cost: $695,000,  Total Project Cost: $1,883,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1017752,  Location: .2 M SE JCT SH23/32&SH145 (Lat: 42.306942,  Lng: -74.002158),  Route carried "on" structure: State highway 23,  Year Built: 1960,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 4,568 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,549 (year 2040),  Design Load: HS 20,  Features Intersected: CR41, SHINGLE KILL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.408,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,248,000,  Roadway Improvement Cost: $731,000,  Total Project Cost: $1,979,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102239,  Location: INT.RTE 32 & CATSKILL CK (Lat: 42.320933,  Lng: -74.012689),  Route carried "on" structure: State highway 32,  Year Built: 1976,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 2,996 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,125 (year 2040),  Design Load: HS 20,  Features Intersected: CATSKILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.230,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.8m (97.8ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 6.91m (22.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,010,000,  Roadway Improvement Cost: $1,763,000,  Total Project Cost: $4,772,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107321,  Location: 1 MI.NW OF ACRA (Lat: 42.322517,  Lng: -74.092514),  Route carried "on" structure: State highway 23,  Year Built: 1962,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 2,282 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 2,433 (year 2040),  Design Load: HS 20,  Features Intersected: BOWERY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.331,  Lanes on structure: 3,  Base Highway Network: Yes,  Toll: Toll bridge,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $361,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220058,  Location: 4.0 MI SW HMLT CAIRO (Lat: 42.245261,  Lng: -74.027678),  Route carried "on" structure: Other road ,  Year Built: 1965,  Year Reconstructed: 1988,  Status: Posted for load,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 40 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 56 (year 2036),  Features Intersected: KISKATOM BROOK,  Facility Carried by Structure: POLLY'S ROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Poor,  Superstructure: Serious,  Substructure: Fair,  Channel: Fair,  Operating Rating: 31.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $202,000,  Roadway Improvement Cost: $118,000,  Total Project Cost: $320,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 32006,  Location: 2 MI SW HAMLET OF ACRA (Lat: 42.283478,  Lng: -74.056378),  Route carried "on" structure: Other road ,  Year Built: 1993,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 211 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 295 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: BALD HILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.430,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.8m (120.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $825,000,  Roadway Improvement Cost: $483,000,  Total Project Cost: $1,308,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 320061,  Location: 2.5 MI N HMLT CAIRO (Lat: 42.325669,  Lng: -73.997003),  Route carried "on" structure: Other road ,  Year Built: 2011,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 109 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 153 (year 2036),  Design Load: HS 20,  Features Intersected: JAN DE BAKKERS KL,  Facility Carried by Structure: CANNIFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.802,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Excellent,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 68.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 53.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $481,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $763,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330322,  Location: HAMLET OF SOUTH CAIRO (Lat: 42.277944,  Lng: -73.957503),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 2,254 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,156 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: IRA VAIL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.37m (24.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,783,000,  Roadway Improvement Cost: $1,044,000,  Total Project Cost: $2,827,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330323,  Location: 1 MI SW HAMLET CAIRO (Lat: 42.284331,  Lng: -74.007325),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 1,880 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,961 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHINGLE KILL,  Facility Carried by Structure: PURLING ROAD CR24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.411,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.7m (28.5ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.85m (6.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $457,000,  Total Project Cost: $1,237,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Other Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330324,  Location: .2 MI N OF ROUND TOP (Lat: 42.271122,  Lng: -74.027653),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 970 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,011 (year 2040),  Design Load: HS 20,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: ROUND TOP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 61.9 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $786,000,  Roadway Improvement Cost: $460,000,  Total Project Cost: $1,246,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330325,  Location: 4 MI S JCT RTS 23 <32 (Lat: 42.248581,  Lng: -74.009694),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 597 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 622 (year 2040),  Features Intersected: KISKATOM BROOK,  Facility Carried by Structure: HEARTS CONTENT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 52.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $446,000,  Roadway Improvement Cost: $261,000,  Total Project Cost: $707,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330326,  Location: CR31 NORTH OF SH 32 (Lat: 42.259633,  Lng: -74.021733),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 597 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 622 (year 2040),  Features Intersected: KISKATOM BROOK,  Facility Carried by Structure: HEARTS CONTENT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $315,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $500,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 330327,  Location: 3.5 MI SW HMLT CAIRO (Lat: 42.281447,  Lng: -74.046608),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 507 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 710 (year 2036),  Design Load: HL 93,  Features Intersected: TROUT BROOK,  Facility Carried by Structure: HEARTS CONTENT ROA
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 5.358,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 330328,  Location: HAMLET OF CAIRO (Lat: 42.301811,  Lng: -74.003178),  Route carried "on" structure: County highway ,  Year Built: 1927,  Year Reconstructed: 2021,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,524 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,122 (year 2040),  Design Load: HS 20,  Features Intersected: SHINGLE KILL,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.003,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Excellent,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $569,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $902,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330329,  Location: HAMLET OF CAIRO (Lat: 42.307025,  Lng: -74.002306),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 622 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 871 (year 2036),  Design Load: HS 20,  Features Intersected: SHINGLE KILL,  Facility Carried by Structure: JEROME AVE CR 41A
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $418,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $663,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 33033,  Location: 1 MI N HAMLET CAIRO (Lat: 42.313831,  Lng: -73.995781),  Route carried "on" structure: County highway ,  Year Built: 1964,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 12.86m (42.19ft),  Average Daily Traffic: 955 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,337 (year 2036),  Design Load: HS 20,  Features Intersected: CATSKILL CREEK,  Facility Carried by Structure: LAKE MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 4 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.5m (119.8ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.86m (42.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $2,413,000,  Roadway Improvement Cost: $1,413,000,  Total Project Cost: $3,826,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: 330331,  Location: 1.5 MI NE OF CAIRO (Lat: 42.318553,  Lng: -73.992581),  Route carried "on" structure: County highway ,  Year Built: 1964,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 955 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 1,337 (year 2036),  Features Intersected: JAN DE BAKKERS KL,  Facility Carried by Structure: COUNTY ROAD 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.285,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.2m (13.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Inventory Rating: 79.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $361,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $573,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330332,  Location: 3 MI NW HAMLET OF CAIRO (Lat: 42.349536,  Lng: -73.993297),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 383 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 536 (year 2036),  Features Intersected: JANDEBAKKERS KILL,  Facility Carried by Structure: LAKE MILLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.857,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Fair,  Operating Rating: 76.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $171,000,  Total Project Cost: $464,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336778,  Location: 0.4 Mi East of CR39 Inter (Lat: 42.268711,  Lng: -74.020475),  Route carried "on" structure: Other road ,  Year Built: 2018,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 173 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 242 (year 2036),  Design Load: HL 93,  Features Intersected: GLEN BROOK,  Facility Carried by Structure: SOUTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.595,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Satisfactory,  Operating Rating: 86.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $234,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $371,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336974,  Location: 0.4 MI S ROUNDTOP HAMLET (Lat: 42.263058,  Lng: -74.024564),  Route carried "on" structure: County highway ,  Year Built: 2000,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 597 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 622 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SHINGLE KILL,  Facility Carried by Structure: HRTS CONT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.542,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 336977,  Location: 2 MI SW JCT SH 23 & SH 32 (Lat: 42.279694,  Lng: -74.024650),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 970 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,011 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TRB SHINGLE KILL,  Facility Carried by Structure: COUNTY ROAD 39
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.319,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $324,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1017751,  Location: .2 M SE JCT SH23/32&SH145 (Lat: 42.307033,  Lng: -74.002031),  Route carried "under" structure: County highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 478 (year 2016),  Truck Traffic: 4%,  Features Intersected: CR41, SHINGLE KILL,  Facility Carried by Structure: RTE 23
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: 1017752,  Location: .2 M SE JCT SH23/32&SH145 (Lat: 42.306942,  Lng: -74.002158),  Route carried "under" structure: County highway ,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 478 (year 2016),  Truck Traffic: 4%,  Features Intersected: CR41, SHINGLE KILL,  Facility Carried by Structure: RTE 23
Minimum Vertical Clearance: 4.27m (14.01ft),  Kilometerpoint: 0.660,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Cairo, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.