Bridge Statistics for Brookhaven, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 85ft / 25.8mTotal length
  • $2,130,000Total costs
  • 103,650Total average daily traffic
  • 13,893Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Brookhaven
  • No street view available for this location

New bridges in Brookhaven, WV - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51970-1979
  • 31980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Brookhaven, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Satisfactory
  • 33.3%Fair
  • 33.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 83.3%Good
  • 16.7%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 60.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
Find on map >>   Show street view

Structure Number: 31A02,  Location: 0.01 MI EAST CO RT 70 (Lat: 39.608881,  Lng: -79.889019),  Route carried "on" structure: State highway 700,  Year Built: 1925,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 8,700 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,825 (year 2038),  Features Intersected: DECKERS CREEK,  Facility Carried by Structure: WV ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 62.201,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.35m (7.71ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $281,000,  Roadway Improvement Cost: $243,000,  Total Project Cost: $654,000 ( Estimate for 2020)
Find on map >>   Show street view

Structure Number: 31A022,  Location: 0.13 MI EAST CO RT 7/22 (Lat: 39.608000,  Lng: -79.918989),  Route carried "on" structure: State highway 700,  Year Built: 1983,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 2.08m (6.82ft),  Average Daily Traffic: 21,200 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 28,825 (year 2038),  Design Load: HS 20,  Features Intersected: DECKERS CREEK,  Facility Carried by Structure: WV ROUTE 7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.031,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A123,  Location: 1.44 MI WEST MON CO 857 (Lat: 39.627289,  Lng: -79.903781),  Route carried "on" structure: Interstate 6800,  Year Built: 1975,  Status: Open,  Structure Length: 4.04m (13.25ft),  Average Daily Traffic: 19,350 (year 2018),  Truck Traffic: 18%,  Average Future Daily Traffic: 26,325 (year 2038),  Design Load: HS 20,  Features Intersected: Mgl Co Rt 68/7,  Facility Carried by Structure: INTERSTATE 68 WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.270,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 13 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.99m (13.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $78,000,  Total Project Cost: $397,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A146,  Location: 0.02 MI SOUTH CO RT 64/1 (Lat: 39.587689,  Lng: -79.919750),  Route carried "on" structure: County highway 7000,  Year Built: 1990,  Status: Open,  Structure Length: 1.20m (3.94ft),  Average Daily Traffic: 350 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 475 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: AARON CREEK,  Facility Carried by Structure: MONONGALIA CR 70
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 48 months,  Inspection Date: Febuary 2020,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A152,  Location: 0.07 MI NORTH WV RT 7 (Lat: 39.609389,  Lng: -79.885781),  Route carried "on" structure: County highway 7500,  Year Built: 1987,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 2,400 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,275 (year 2038),  Design Load: HS 20,  Features Intersected: TIBBS RUN,  Facility Carried by Structure: MONONGALIA CR 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: July 2019,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 31A181,  Location: 0.04 MI NORTH CO RT 119/6 (Lat: 39.592550,  Lng: -79.931739),  Route carried "on" structure: County highway 8100,  Year Built: 1971,  Status: Open,  Structure Length: 15.06m (49.41ft),  Average Daily Traffic: 3,200 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,350 (year 2038),  Design Load: HS 20,  Features Intersected: I-68,  Facility Carried by Structure: MONON CO RT 81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.123,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 56.1m (184.1ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.4m (50.5ft)

Condition: Deck: Poor,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 15.06m (49.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $753,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,079,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 31A277,  Location: 0.14 MI WEST MON CO 68/5 (Lat: 39.623381,  Lng: -79.912539),  Route carried "on" structure: County highway 6807,  Year Built: 2000,  Status: Open,  Structure Length: 0.92m (3.02ft),  Average Daily Traffic: 225 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 300 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: KNOCKING RUN,  Facility Carried by Structure: MON CO RT 68/7
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.982,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 5 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.2m (30.2ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 48 months,  Inspection Date: May 2018,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 31A023,  Location: 0.10 MI EAST CR 74 (Lat: 39.573069,  Lng: -79.848231),  Route carried "under" structure: State highway 700,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 6,200 (year 2019),  Truck Traffic: 7%,  Features Intersected: GREER LIMESTONE CONVEYOR,  Facility Carried by Structure: LIMESTONE CONVEYOR
Minimum Vertical Clearance: 10.06m (33.01ft),  Kilometerpoint: 67.898,  Lanes under structure: 2,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 31A123,  Location: 1.44 MI WEST MON CO 857 (Lat: 39.627289,  Lng: -79.903869),  Route carried "under" structure: County highway 6807,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 225 (year 0016),  Truck Traffic: 6%,  Features Intersected: Mgl Co Rt 68/7,  Facility Carried by Structure: INTERSTATE 68 WB
Minimum Vertical Clearance: 4.83m (15.85ft),  Kilometerpoint: 1.996,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 31A142,  Location: 1.44 MI WEST MON CO 857 (Lat: 39.627231,  Lng: -79.903561),  Route carried "under" structure: County highway 6807,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 200 (year 0018),  Truck Traffic: 6%,  Features Intersected: Mgl Co Rt 68/7,  Facility Carried by Structure: INTERSTATE 68 EB
Minimum Vertical Clearance: 5.66m (18.57ft),  Kilometerpoint: 1.996,  Lanes on structure: 2,  Lanes under structure: 2,  Length of Maximum Span: 16.5m (54.1ft)

Find on map >>   Show street view

Structure Number: 31A181,  Location: 0.04 MI NORTH CO RT 119/6 (Lat: 39.592550,  Lng: -79.931739),  Route carried "under" structure: Interstate 6800,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 41,600 (year 0018),  Truck Traffic: 18%,  Features Intersected: I-68,  Facility Carried by Structure: MONON CO RT 81
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.297,  Lanes on structure: 2,  Lanes under structure: 4,  Length of Maximum Span: 56.1m (184.1ft)