Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Bridgeport, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 26Number of bridges
  • 256ft / 77.6mTotal length
  • $34,651,000Total costs
  • 136,721Total average daily traffic
  • 24,845Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Bridgeport
  • No street view available for this location

New bridges in Bridgeport, AL - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 11920-1929
  • 71930-1939
  • 11950-1959
  • 21960-1969
  • 141990-1999
Average Bridge Daily Traffic in Bridgeport, AL
Average Bridge Truck Traffic in Bridgeport, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 9.5%Very good
  • 57.1%Good
  • 19.0%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 42.9%Good
  • 28.6%Satisfactory
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 23.8%Very good
  • 38.1%Good
  • 23.8%Satisfactory
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 30.0%Very good
  • 25.0%Good
  • 40.0%Satisfactory
  • 5.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 66.7%Satisfactory
Find on map >>   Show street view

Structure Number: 261,  Location: 4 MI W CITY OF BRIDGEPORT (Lat: 34.916417,  Lng: -85.768639),  Route carried "on" structure: US 277,  Year Built: 1925,  Status: Open,  Structure Length: 4.36m (14.30ft),  Average Daily Traffic: 2,697 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,776 (year 2038),  Design Load: H 15,  Features Intersected: WIDOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.428,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.4m (30.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 5.34m (17.52ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $1,062,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,168,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 922,  Location: 1.5 MI W JCT US 72 (Lat: 34.937664,  Lng: -85.751061),  Route carried "on" structure: County highway 91,  Year Built: 1931,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 472 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 520 (year 2038),  Design Load: H 15,  Features Intersected: Tribut. to Widows Creek,  Facility Carried by Structure: CO RD 75
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1052,  Location: 1.4 MI W JCT SR 72 (Lat: 34.955497,  Lng: -85.749069),  Route carried "on" structure: County highway 206,  Year Built: 1933,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 250 (year 1989),  Truck Traffic: 7%,  Average Future Daily Traffic: 300 (year 2039),  Design Load: H 10,  Features Intersected: BRANCH of JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $290,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 1057,  Location: 0.7 MI NW JCT SR 73 (Lat: 34.924653,  Lng: -85.647617),  Route carried "on" structure: County highway 93,  Year Built: 1933,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 145 (year 1990),  Truck Traffic: 4%,  Average Future Daily Traffic: 207 (year 2039),  Design Load: H 10,  Features Intersected: LONG ISLAND BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.3m (14.1ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.51m (4.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $274,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 1129,  Location: .3MI.N.INT.JC.69*75 (Lat: 34.923356,  Lng: -85.781739),  Route carried "on" structure: County highway 75,  Year Built: 1934,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 515 (year 1989),  Truck Traffic: 10%,  Average Future Daily Traffic: 555 (year 2039),  Design Load: H 10,  Features Intersected: BRANCH of WIDOWS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.22m (4.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $276,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $304,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1492,  Location: 1.3 MI E JCT CR 96 N (Lat: 34.912853,  Lng: -85.735639),  Route carried "on" structure: County highway 255,  Year Built: 1936,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 100 (year 1990),  Truck Traffic: 4%,  Average Future Daily Traffic: 115 (year 2039),  Design Load: H 10,  Features Intersected: Horn Branch Widows Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $275,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 1623,  Location: 4.5 MI N JCT US431 * SR79 (Lat: 34.477847,  Lng: -86.217689),  Route carried "on" structure: State highway 79,  Year Built: 1937,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 4,412 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 6,177 (year 2039),  Design Load: H 15,  Features Intersected: BOSHART CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 122.289,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Underwater Inspection Date: May 2020,  Bridge Improvement Cost: $240,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $264,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1811,  Location: 1.1 MI S JCT CR 93 (Lat: 34.944006,  Lng: -85.677272),  Route carried "on" structure: County highway 91,  Year Built: 1938,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 210 (year 1990),  Truck Traffic: 8%,  Average Future Daily Traffic: 260 (year 2038),  Design Load: H 10,  Features Intersected: GLOVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $227,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $250,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3626,  Location: 3.6 MI W CITY BRIDGEPORT (Lat: 34.918806,  Lng: -85.763278),  Route carried "on" structure: US 277,  Year Built: 1950,  Status: Open,  Structure Length: 3.17m (10.40ft),  Average Daily Traffic: 2,697 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,776 (year 2038),  Features Intersected: CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.982,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.03m (13.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $829,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $912,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7096,  Location: 3.9 MI W JCT SR 72 (Lat: 34.925142,  Lng: -85.780108),  Route carried "on" structure: County highway 75,  Year Built: 1960,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 540 (year 1989),  Truck Traffic: 20%,  Average Future Daily Traffic: 605 (year 2039),  Design Load: H 15,  Features Intersected: WIDOWS CREEK(MC)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 47.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $476,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 8833,  Location: 1.0 MI N JCT CR 74 (Lat: 34.969814,  Lng: -85.745103),  Route carried "on" structure: County highway 74,  Year Built: 1965,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 250 (year 1989),  Truck Traffic: 7%,  Average Future Daily Traffic: 305 (year 2039),  Design Load: H 15,  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.2m (17.1ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.23m (7.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $398,000,  Roadway Improvement Cost: $40,000,  Total Project Cost: $438,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16228,  Location: 2.1 MI WEST TENN ST LINE (Lat: 34.965108,  Lng: -85.743272),  Route carried "on" structure: US 72,  Year Built: 1997,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 10,477 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,668 (year 2039),  Design Load: HS 20,  Features Intersected: RELIEF NO 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 265.862,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,048,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16229,  Location: 1.9 MI WEST TENN ST LINE (Lat: 34.967003,  Lng: -85.742356),  Route carried "on" structure: US 72,  Year Built: 1997,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 10,477 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,668 (year 2039),  Design Load: HS 20,  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 266.023,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1623,  Location: 1.7 MI WEST TENN ST LINE (Lat: 34.969661,  Lng: -85.741192),  Route carried "on" structure: US 72,  Year Built: 1997,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 10,477 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,668 (year 2039),  Design Load: HS 20,  Features Intersected: RELIEF NO 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 266.345,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,226,000,  Roadway Improvement Cost: $123,000,  Total Project Cost: $1,349,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16232,  Location: IN BRIDGEPORT CITY LIMITS (Lat: 34.976083,  Lng: -85.736083),  Route carried "on" structure: State highway 277,  Year Built: 1997,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 3,065 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 4,291 (year 2039),  Design Load: HS 20,  Features Intersected: U.S. 72
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.122,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: Toll bridge is a segment,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 30.5m (100.1ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 17.9m (58.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.69m (35.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,252,000,  Roadway Improvement Cost: $425,000,  Total Project Cost: $4,677,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16266,  Location: 2.1 MI WEST TENN ST LINE (Lat: 34.965022,  Lng: -85.742908),  Route carried "on" structure: US 72,  Year Built: 1997,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 10,477 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,668 (year 2039),  Design Load: HS 20,  Features Intersected: RELIEF NO 1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 265.862,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,048,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16267,  Location: 1.9 MI WEST TENN ST LINE (Lat: 34.966894,  Lng: -85.742017),  Route carried "on" structure: US 72,  Year Built: 1997,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 10,477 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,668 (year 2039),  Design Load: HS 20,  Features Intersected: JONES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 266.023,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 44.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.68m (15.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,347,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $1,482,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16268,  Location: 1.7 MI WEST TENN ST LINE (Lat: 34.969528,  Lng: -85.740786),  Route carried "on" structure: US 72,  Year Built: 1997,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 10,477 (year 2019),  Truck Traffic: 18%,  Average Future Daily Traffic: 14,668 (year 2039),  Design Load: HS 20,  Features Intersected: RELIEF NO 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 266.345,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.0m (39.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 88.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.31m (10.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $953,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,048,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16269,  Location: 0.2 MI S TENN ST LINE (Lat: 34.985203,  Lng: -85.722106),  Route carried "on" structure: US 72,  Year Built: 1995,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 6,764 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 9,469 (year 2039),  Design Load: HS 20,  Features Intersected: SEQUATCHIE VALLEY RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 268.220,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 57.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.31m (17.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,566,000,  Roadway Improvement Cost: $157,000,  Total Project Cost: $1,723,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16271,  Location: 0.8 MI WEST TENN ST LINE (Lat: 34.979389,  Lng: -85.732472),  Route carried "on" structure: US 72,  Year Built: 1995,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 11,708 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 16,392 (year 2040),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 267.029,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.44m (4.72ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $4,018,000,  Roadway Improvement Cost: $402,000,  Total Project Cost: $4,420,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 16276,  Location: 5.7MI E. JCT SR117,US72 (Lat: 34.922139,  Lng: -85.778028),  Route carried "on" structure: US 72,  Year Built: 1994,  Status: Open,  Structure Length: 11.43m (37.50ft),  Average Daily Traffic: 9,148 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 12,796 (year 2038),  Design Load: HS 20,  Features Intersected: WIDOWS CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 259.829,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.30m (40.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,628,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $3,991,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 16277,  Location: 5.7MI E. JCT SR117,US72 (Lat: 34.922028,  Lng: -85.777917),  Route carried "on" structure: US 72,  Year Built: 1994,  Status: Open,  Structure Length: 11.43m (37.50ft),  Average Daily Traffic: 9,140 (year 2018),  Truck Traffic: 22%,  Average Future Daily Traffic: 12,796 (year 2038),  Design Load: HS 20,  Features Intersected: WIDOWS CREEK,  Facility Carried by Structure: SR 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 259.829,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Skew: 10 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 12.30m (40.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,628,000,  Roadway Improvement Cost: $363,000,  Total Project Cost: $3,991,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1743,  Location: 2 MI EAST OF MT CARMEL (Lat: 34.942950,  Lng: -85.742439),  Route carried "on" structure: County highway 94,  Year Built: 1999,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 90 (year 1990),  Average Future Daily Traffic: 360 (year 2038),  Design Load: HS 20,  Features Intersected: SOUTHERN AND LN RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 84.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of replacement,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.32m (24.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,807,000,  Roadway Improvement Cost: $181,000,  Total Project Cost: $1,988,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17495,  Location: 6.8 MILES EAST AL117*US72 (Lat: 34.932500,  Lng: -85.762778),  Route carried "on" structure: US 72,  Year Built: 1994,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 10,933 (year 2019),  Truck Traffic: 22%,  Average Future Daily Traffic: 15,307 (year 2039),  Design Load: HS 20,  Features Intersected: STREAM
Minimum Vertical Clearance: 7.56m (24.80ft),  Kilometerpoint: 261.681,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 10 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,366,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $1,503,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1189,  Location: 1.3 MI W US 72 (Lat: 34.943333,  Lng: -85.765000),  Route carried "under" structure: County highway 91,  Year Built: 1912,  Structure Length: 0. m,  Average Daily Traffic: 403 (year 1985),  Truck Traffic: 1%,  Features Intersected: FAS 19,  Facility Carried by Structure: L&N RAILROAD
Minimum Vertical Clearance: 3.99m (13.09ft),  Kilometerpoint: 0.010,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: 16232,  Location: IN BRIDGEPORT CITY LIMITS (Lat: 34.976083,  Lng: -85.736083),  Route carried "under" structure: US 72,  Year Built: 1997,  Structure Length: 0. m,  Average Daily Traffic: 10,320 (year 2019),  Truck Traffic: 18%,  Features Intersected: U.S. 72,  Facility Carried by Structure: AL 277
Minimum Vertical Clearance: 5.76m (18.90ft),  Kilometerpoint: 267.151,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: Toll bridge,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.5m (100.1ft)

Discuss Bridgeport, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.