Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Boyd, Texas (TX)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 17Number of bridges
  • 177ft / 53.7mTotal length
  • $643,000Total costs
  • 63,230Total average daily traffic
  • 12,294Total average daily truck traffic
  • 79,790Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Boyd
  • No street view available for this location

New bridges in Boyd, TX - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 11940-1949
  • 41950-1959
  • 21980-1989
  • 31990-1999
  • 52000-2009
  • 12010-2019
Reconstructed bridges in Boyd, TX - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21950-1959
  • 01960-1969
  • 21970-1979
Average Bridge Daily Traffic in Boyd, TX
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 83.3%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 41.7%Very good
  • 50.0%Good
  • 8.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 25.0%Satisfactory
  • 8.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Very good
  • 29.4%Good
  • 47.1%Satisfactory
  • 11.8%Fair
  • 5.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 2249003120403,  Location: 0.74 MI N OF SH-114 (Lat: 33.089217,  Lng: -97.558719),  Route carried "on" structure: State highway 730,  Year Built: 1954,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 4,329 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,520 (year 2033),  Design Load: HS 20,  Features Intersected: TRINITY RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.114,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.98m (3.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $124,000,  Roadway Improvement Cost: $61,000,  Total Project Cost: $275,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 22490031204031,  Location: 0.68 MI N OF SH-114 (Lat: 33.088186,  Lng: -97.558700),  Route carried "on" structure: State highway 730,  Year Built: 1954,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 4,329 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,520 (year 2033),  Design Load: HS 20,  Features Intersected: TRINITY RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.222,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $145,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $368,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 22490031204034,  Location: 1.7 MI N OF FM 2048 (Lat: 33.067433,  Lng: -97.562817),  Route carried "on" structure: State highway 730,  Year Built: 1958,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 6,258 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 5,380 (year 2033),  Design Load: HS 20,  Features Intersected: TRIB W FRK TRINITY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.715,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 22490031204035,  Location: 1.1 MI N OF FM 2048 (Lat: 33.058739,  Lng: -97.561564),  Route carried "on" structure: State highway 730,  Year Built: 1958,  Year Reconstructed: 1979,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,258 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 5,380 (year 2033),  Design Load: HS 20,  Features Intersected: TRIB W FRK TRINITY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 38.690,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021
Find on map >>   Show street view

Structure Number: 22490031204049,  Location: 0.51 MI N OF SH 114 (Lat: 33.085461,  Lng: -97.558636),  Route carried "on" structure: State highway 730,  Year Built: 1999,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 4,329 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,520 (year 2033),  Design Load: HS 20,  Features Intersected: WEST FORK TRINITY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.468,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22490031204052,  Location: 2.59 MI N OF SH-114 (Lat: 33.110944,  Lng: -97.573683),  Route carried "on" structure: State highway 730,  Year Built: 2002,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 4,329 (year 2019),  Truck Traffic: 19%,  Average Future Daily Traffic: 6,520 (year 2033),  Design Load: HS 20,  Features Intersected: WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.142,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 29.9m (98.1ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22490035202012,  Location: 4.1 MI E OF FM 51 (Lat: 33.075536,  Lng: -97.583139),  Route carried "on" structure: State highway 114,  Year Built: 1930,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 5,318 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,290 (year 2033),  Features Intersected: WALKER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.250,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 13.7m (44.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 22490035202018,  Location: 1.95 MI E OF FM 51 (Lat: 33.076939,  Lng: -97.619386),  Route carried "on" structure: State highway 114,  Year Built: 1942,  Year Reconstructed: 1963,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 5,318 (year 2020),  Truck Traffic: 24%,  Average Future Daily Traffic: 7,290 (year 2033),  Design Load: H 15,  Features Intersected: LOLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.801,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 22490035202032,  Location: 1.0 MI E OF FM 730 (Lat: 33.074467,  Lng: -97.538733),  Route carried "on" structure: State highway 114,  Year Built: 1985,  Status: Open,  Structure Length: 18.17m (59.61ft),  Average Daily Traffic: 10,154 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,900 (year 2033),  Design Load: HS 20,  Features Intersected: TRINITY RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.366,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 6,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 22490035202033,  Location: 0.8 MI E OF FM 730 (Lat: 33.075414,  Lng: -97.541144),  Route carried "on" structure: State highway 114,  Year Built: 1985,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 10,154 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,900 (year 2033),  Design Load: HS 20,  Features Intersected: TRINITY RIVER RELIEF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.077,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 11,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Other
Find on map >>   Show street view

Structure Number: 22490AA0291001,  Location: 0.65 MI. W. FROM FM 730 (Lat: 33.130506,  Lng: -97.595736),  Route carried "on" structure: County highway 4380,  Year Built: 2005,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 280 (year 2014),  Average Future Daily Traffic: 330 (year 2034),  Design Load: HS 20,  Features Intersected: TRIB WEST FK TRINITY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.046,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22490AA0292001,  Location: 0.84 MI. E. OF FM 730 (Lat: 33.126425,  Lng: -97.569317),  Route carried "on" structure: County highway 4371,  Year Built: 1998,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 523 (year 2014),  Average Future Daily Traffic: 550 (year 2034),  Design Load: HS 20,  Features Intersected: WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.352,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.5m (77.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 22490AA0295001,  Location: 0.7 MI. N. OF FM 730 (Lat: 33.117606,  Lng: -97.572844),  Route carried "on" structure: County highway 4470,  Year Built: 2004,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 100 (year 2019),  Average Future Daily Traffic: 100 (year 2034),  Features Intersected: WALNUT CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22490AA0300001,  Location: 0.7 MI N OF SH 114 (Lat: 33.084469,  Lng: -97.605839),  Route carried "on" structure: County highway 4590,  Year Built: 2010,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 207 (year 2019),  Average Future Daily Traffic: 230 (year 2031),  Features Intersected: LOLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 22490AA0362002,  Location: 2.4 MI. W. OF FM 730 (Lat: 33.067253,  Lng: -97.592875),  Route carried "on" structure: County highway 4680,  Year Built: 2002,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 220 (year 2014),  Average Future Daily Traffic: 270 (year 2034),  Design Load: HS 20,  Features Intersected: BRANCH OF WALKER CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.026,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Concrete,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 22490AA0372001,  Location: 0.7 MI. S. OF SH 114 (Lat: 33.074408,  Lng: -97.634164),  Route carried "on" structure: County highway 4698,  Year Built: 1996,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 584 (year 2019),  Average Future Daily Traffic: 500 (year 2031),  Features Intersected: LOLA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 22490AA4360001,  Location: .5 MI E OF FM 730 (Lat: 33.106928,  Lng: -97.559578),  Route carried "on" structure: County highway 4360,  Year Built: 2004,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 540 (year 2014),  Average Future Daily Traffic: 590 (year 2034),  Features Intersected: TRIB WEST FORK TRINITY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2020,  Deck Structure Type: Concrete Cast-file-Place
Discuss Boyd, Texas (TX) on our hugely popular Texas forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.