Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Blennerhassett, West Virginia (WV)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 466ft / 142mTotal length
  • $7,700,000Total costs
  • 74,708Total average daily traffic
  • 4,377Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Blennerhassett
  • No street view available for this location

New bridges in Blennerhassett, WV - historical statistics
  • New bridges - historical statistics
  • 11960-1969
  • 92000-2009
Average Bridge Daily Traffic in Blennerhassett, WV
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 60.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Good
  • 40.0%Satisfactory
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Good
  • 60.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Excellent
  • 50.0%Good
Find on map >>   Show street view

Structure Number: 54A022,  Location: 0.23 MI SOUTH OF WV 95 (Lat: 39.246089,  Lng: -81.597739),  Route carried "on" structure: County highway 93,  Year Built: 1964,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 650 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 969 (year 2039),  Design Load: HS 20,  Features Intersected: NEAL RUN,  Facility Carried by Structure: CR 9/3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.635,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $300,000 ( Estimate for 2014),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 54A2,  Location: 3.00 MILE WEST OF WV 68 (Lat: 39.273861,  Lng: -81.646581),  Route carried "on" structure: US 50,  Year Built: 2008,  Status: Open,  Structure Length: 122.19m (400.89ft),  Average Daily Traffic: 11,602 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,602 (year 2040),  Design Load: HL 93,  Features Intersected: OHIO RIVER AND ROUTE 892
Minimum Vertical Clearance: 6.83m (22.41ft),  Kilometerpoint: 0.016,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 41.1m (134.8ft),  Skew: 30 degrees,  Navigation Control: Yes ( Vertical Clearance: 23.2m (76.1ft), Horizontal Clearance: 240.8m (790.0ft)),  Material/Design: Steel,  Design/Construction: Arch - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 11,  Length of Maximum Span: 267.8m (878.6ft),  Curb-To-Curb Width: 29.3m (96.1ft),  Out-to-Out Width: 30.6m (100.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Excellent,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Assigned ratings based on Load and Resistance Factor Design (LRFD) reported in metric tons,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 122.16m (400.79ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2021,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $500,000,  Total Project Cost: $500,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A201,  Location: 0.07 MILE NORTH OF WV 95 (Lat: 39.252089,  Lng: -81.612031),  Route carried "on" structure: State highway 68,  Year Built: 2004,  Status: Open,  Structure Length: 7.60m (24.93ft),  Average Daily Traffic: 1,300 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,560 (year 2038),  Design Load: HL 93,  Features Intersected: US 50 EBL WBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.496,  Lanes on structure: 5,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 39.6m (129.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 23.9m (78.4ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.62m (25.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $1,000,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $1,200,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A202,  Location: 0.03 MILE WEST OF WV 95 (Lat: 39.251419,  Lng: -81.603119),  Route carried "on" structure: US 50,  Year Built: 2004,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 18,700 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 18,700 (year 2038),  Design Load: HL 93,  Features Intersected: Meadow Dr. - CR 9/27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.810,  Lanes on structure: 6,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 32 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 33.5m (109.9ft),  Out-to-Out Width: 34.9m (114.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $5,000,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $5,500,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A24,  Location: 0.01 MILE NORTH OF CR30/2 (Lat: 39.259250,  Lng: -81.644919),  Route carried "on" structure: County highway 344,  Year Built: 2009,  Status: Open,  Structure Length: 7.41m (24.31ft),  Average Daily Traffic: 406 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 447 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: US 50,  Facility Carried by Structure: COUNTY ROUTE 34/4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Lanes under structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 36.6m (120.1ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.44m (24.41ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,500,000,  Roadway Improvement Cost: $500,000,  Total Project Cost: $200,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 54A2,  Location: 3.00 MILE WEST OF WV 68 (Lat: 39.275731,  Lng: -81.646731),  Route carried "under" structure: State highway 61800,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 5,000 (year 0007),  Truck Traffic: 5%,  Features Intersected: OHIO RIVER AND ROUTE 892,  Facility Carried by Structure: US 50
Minimum Vertical Clearance: 13.79m (45.24ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 2,  Length of Maximum Span: 267.8m (878.6ft)

Find on map >>   Show street view

Structure Number: 54A2,  Location: 3.00 MILE WEST OF WV 68 (Lat: 39.275731,  Lng: -81.646731),  Route carried "under" structure: State highway 89200,  Year Built: 2008,  Structure Length: 0. m,  Average Daily Traffic: 5,800 (year 0007),  Truck Traffic: 5%,  Features Intersected: OHIO RIVER AND ROUTE 892,  Facility Carried by Structure: US 50
Minimum Vertical Clearance: 7.14m (23.43ft),  Kilometerpoint: 9.656,  Lanes on structure: 6,  Lanes under structure: 2,  Length of Maximum Span: 267.8m (878.6ft)

Find on map >>   Show street view

Structure Number: 54A201,  Location: 0.07 MILE NORTH OF WV 95 (Lat: 39.252081,  Lng: -81.611989),  Route carried "under" structure: US 5000,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 0010),  Truck Traffic: 6%,  Features Intersected: US 50 EBL WBL,  Facility Carried by Structure: WEST VIRGINIA 68
Minimum Vertical Clearance: 5.39m (17.68ft),  Kilometerpoint: 4.828,  Lanes on structure: 5,  Lanes under structure: 4,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 54A201,  Location: 0.07 MILE NORTH OF WV 95 (Lat: 39.252081,  Lng: -81.611989),  Route carried "under" structure: US 5000,  Year Built: 2004,  Structure Length: 0. m,  Average Daily Traffic: 11,800 (year 0010),  Truck Traffic: 6%,  Features Intersected: US 50 EBL WBL,  Facility Carried by Structure: WEST VIRGINIA 68
Minimum Vertical Clearance: 6.40m (21.00ft),  Kilometerpoint: 4.828,  Lanes on structure: 5,  Lanes under structure: 4,  Length of Maximum Span: 39.6m (129.9ft)

Find on map >>   Show street view

Structure Number: 54A24,  Location: 0.01 MILE NORTH OF CR30/2 (Lat: 39.259250,  Lng: -81.644919),  Route carried "under" structure: US 5000,  Year Built: 2009,  Structure Length: 0. m,  Average Daily Traffic: 7,650 (year 0010),  Truck Traffic: 6%,  Features Intersected: US 50,  Facility Carried by Structure: COUNTY ROUTE 34/4
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 2.253,  Lanes on structure: 2,  Lanes under structure: 3,  Length of Maximum Span: 36.6m (120.1ft)

Discuss Blennerhassett, West Virginia (WV) on our hugely popular West Virginia forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.