Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Big Bass Lake, Pennsylvania (PA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 135ft / 41.4mTotal length
  • $3,869,000Total costs
  • 79,605Total average daily traffic
  • 15,133Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Big Bass Lake
  • No street view available for this location

New bridges in Big Bass Lake, PA - historical statistics
  • New bridges - historical statistics
  • 31950-1959
  • 111960-1969
  • 11970-1979
  • 11980-1989
Reconstructed bridges in Big Bass Lake, PA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 31990-1999
  • 22000-2009
Average Bridge Daily Traffic in Big Bass Lake, PA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 8.3%Very good
  • 8.3%Good
  • 50.0%Satisfactory
  • 33.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 25.0%Satisfactory
  • 41.7%Fair
  • 16.7%Poor
  • 8.3%Imminent failure
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 41.7%Satisfactory
  • 25.0%Fair
  • 33.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 25.0%Satisfactory
  • 12.5%Fair
  • 37.5%Poor
Find on map >>   Show street view

Structure Number: 20595,  Location: CLIFTON TWP OVER SR 2013 (Lat: 41.246667,  Lng: -75.516667),  Route carried "on" structure: Interstate 380,  Year Built: 1967,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 3.63m (11.91ft),  Average Daily Traffic: 11,078 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 17,021 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: SR 2013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.621,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.60m (11.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $488,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20596,  Location: CLIFTON TWP OVER SR 2013 (Lat: 41.246667,  Lng: -75.516667),  Route carried "on" structure: Interstate 380,  Year Built: 1967,  Year Reconstructed: 2009,  Status: Open,  Structure Length: 3.54m (11.61ft),  Average Daily Traffic: 11,089 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 16,519 (year 2032),  Design Load: HS 20,  Features Intersected: SR 2013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.592,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 13 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $26,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $353,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 2073,  Location: CLIFTON TWP 1.2M S SR2017 (Lat: 41.217922,  Lng: -75.550742),  Route carried "on" structure: State highway ,  Year Built: 1973,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,430 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,482 (year 2032),  Design Load: HS 20,  Features Intersected: ASH CREEK,  Facility Carried by Structure: SR 2013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.866,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.8m (32.2ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Poor,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20732,  Location: CLIFTON TWP 500' W TR 435 (Lat: 41.252489,  Lng: -75.505872),  Route carried "on" structure: State highway ,  Year Built: 1961,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 1,404 (year 2021),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,473 (year 2032),  Design Load: HS 20,  Features Intersected: MEADOW BROOK,  Facility Carried by Structure: SR 2013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.700,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,000,  Roadway Improvement Cost: $7,000,  Total Project Cost: $30,000,  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20852,  Location: CLIFTON, .5 MI E SR 2013 (Lat: 41.225028,  Lng: -75.540628),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Posted for load,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 40 (year 2019),  Average Future Daily Traffic: 60 (year 2036),  Features Intersected: LEHIGH RIVER,  Facility Carried by Structure: T303 PLANK RD WEST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 4.5m (14.8ft),  Out-to-Out Width: 5.0m (16.4ft)

Condition: Deck: Very good,  Superstructure: Poor,  Substructure: Poor,  Channel: Poor,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2019,  Other Special Inspection Date: December 2020,  Bridge Improvement Cost: $29,000,  Roadway Improvement Cost: $200,000,  Total Project Cost: $388,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20853,  Location: CLIFTON TWP 1 MI SW I-380 (Lat: 41.225672,  Lng: -75.510689),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 1988,  Status: Closed,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 40 (year 2018),  Average Future Daily Traffic: 60 (year 2035),  Features Intersected: LEHIGH RIVER,  Facility Carried by Structure: T-304 (PLANK ROAD)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Imminent failure,  Substructure: Poor,  Channel: Poor,  Operating Rating: 3.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 2.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $4,000,  Roadway Improvement Cost: $10,000,  Total Project Cost: $48,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20854,  Location: 3/4 MI SW OF COOLBAUGH RD (Lat: 41.219617,  Lng: -75.517906),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 3.84m (12.60ft),  Average Daily Traffic: 40 (year 2019),  Average Future Daily Traffic: 60 (year 2036),  Features Intersected: LEHIGH RIVER,  Facility Carried by Structure: T-304 PLANK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.5m (18.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $268,000,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 20856,  Location: CLIFTON 1/4 MI NW OF 507 (Lat: 41.245503,  Lng: -75.484356),  Route carried "on" structure: City street ,  Year Built: 1984,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 500 (year 2017),  Average Future Daily Traffic: 550 (year 2035),  Features Intersected: LEHIGH RIVER,  Facility Carried by Structure: T-308 PHILLIPS RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.4m (57.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2019,  Bridge Improvement Cost: $20,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $269,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 26847,  Location: OVER I-380-EXIT 13(6) (Lat: 41.230169,  Lng: -75.498481),  Route carried "on" structure: State highway 435,  Year Built: 1969,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.24m (13.91ft),  Average Daily Traffic: 3,421 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,957 (year 2032),  Design Load: HS 20,  Features Intersected: I-380 (LR 1002) SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Poor,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $36,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $481,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 26848,  Location: OVER I-380-EXIT 13(6) (Lat: 41.230867,  Lng: -75.497572),  Route carried "on" structure: State highway 435,  Year Built: 1969,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 3,421 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 4,957 (year 2032),  Design Load: HS 20,  Features Intersected: SR 380 (LR 1002) NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.20m (17.06ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $33,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $442,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35535,  Location: LEHIGH TWP @ LACK CTY LN (Lat: 41.234067,  Lng: -75.505106),  Route carried "on" structure: Interstate 380,  Year Built: 1967,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 11,078 (year 2021),  Truck Traffic: 21%,  Average Future Daily Traffic: 18,794 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LEHIGH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $551,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 35536,  Location: LEHIGH TWP LACK CTY LINE (Lat: 41.234411,  Lng: -75.504806),  Route carried "on" structure: Interstate 380,  Year Built: 1967,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 11,089 (year 2021),  Truck Traffic: 20%,  Average Future Daily Traffic: 18,240 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: LEHIGH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 12 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.5m (37.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.20m (20.34ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $41,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $551,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 20595,  Location: CLIFTON TWP OVER SR 2013 (Lat: 41.246667,  Lng: -75.516667),  Route carried "under" structure: State highway ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 1,404 (year 2021),  Truck Traffic: 10%,  Features Intersected: SR 2013,  Facility Carried by Structure: SR 0380 I-380 SB
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 12.844,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 20596,  Location: CLIFTON TWP OVER SR 2013 (Lat: 41.246667,  Lng: -75.516667),  Route carried "under" structure: State highway ,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 1,404 (year 2021),  Truck Traffic: 10%,  Features Intersected: SR 2013,  Facility Carried by Structure: SR 0380 I-380 NB
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 13.700,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 13.1m (43.0ft)

Find on map >>   Show street view

Structure Number: 26847,  Location: OVER I-380-EXIT 13(6) (Lat: 41.230169,  Lng: -75.498481),  Route carried "under" structure: Interstate 380,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 11,078 (year 2021),  Truck Traffic: 21%,  Features Intersected: I-380 (LR 1002) SB,  Facility Carried by Structure: PA 435 (LR 254)
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 21.549,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Find on map >>   Show street view

Structure Number: 26848,  Location: OVER I-380-EXIT 13(6) (Lat: 41.230867,  Lng: -75.497572),  Route carried "under" structure: Interstate 380,  Year Built: 1969,  Structure Length: 0. m,  Average Daily Traffic: 11,089 (year 2021),  Truck Traffic: 20%,  Features Intersected: SR 380 (LR 1002) NB,  Facility Carried by Structure: PA 435 (LR 254)
Minimum Vertical Clearance: 5.09m (16.70ft),  Kilometerpoint: 21.087,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.3m (60.0ft)

Discuss Big Bass Lake, Pennsylvania (PA) on our hugely popular Pennsylvania forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.