Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Barton, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 31Number of bridges
  • 292ft / 89.2mTotal length
  • $44,957,000Total costs
  • 84,492Total average daily traffic
  • 15,169Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Barton
  • No street view available for this location

New bridges in Barton, NY - historical statistics
  • New bridges - historical statistics
  • 11910-1919
  • 61930-1939
  • 21950-1959
  • 11960-1969
  • 81970-1979
  • 11980-1989
  • 21990-1999
  • 32000-2009
  • 72010-2019
Reconstructed bridges in Barton, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 22000-2009
  • 32010-2019
Average Bridge Daily Traffic in Barton, NY
Average Bridge Truck Traffic in Barton, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 32.0%Excellent
  • 24.0%Very good
  • 4.0%Good
  • 20.0%Satisfactory
  • 12.0%Fair
  • 8.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 32.0%Excellent
  • 16.0%Very good
  • 12.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 20.0%Excellent
  • 20.0%Very good
  • 12.0%Good
  • 24.0%Satisfactory
  • 24.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 4.5%Excellent
  • 4.5%Very good
  • 27.3%Good
  • 36.4%Satisfactory
  • 22.7%Fair
  • 4.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 66.7%Very good
  • 33.3%Good
Find on map >>   Show street view

Structure Number: 101288,  Location: RTE 17C 3.6 MI E WAVERLY (Lat: 42.008333,  Lng: -76.480978),  Route carried "on" structure: State highway 17C,  Year Built: 1931,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 3,605 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,379 (year 2040),  Design Load: H 20,  Features Intersected: ELLIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.910,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.4m (37.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $648,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $1,028,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 101289,  Location: RTE 17C N END OF BARTON (Lat: 42.045217,  Lng: -76.447622),  Route carried "on" structure: State highway 17C,  Year Built: 1938,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 5.27m (17.29ft),  Average Daily Traffic: 2,103 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 2,193 (year 2040),  Design Load: HL 93,  Features Intersected: BUTSON CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.265,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,571,000,  Roadway Improvement Cost: $920,000,  Total Project Cost: $2,491,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102317,  Location: 1.2 MI N OF WAVERLY (Lat: 42.026875,  Lng: -76.524064),  Route carried "on" structure: State highway 34,  Year Built: 2019,  Status: Open,  Structure Length: 9.33m (30.61ft),  Average Daily Traffic: 4,855 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,064 (year 2040),  Design Load: H 20,  Features Intersected: CAYUTA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.282,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 46.0m (150.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.32m (30.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,142,000,  Roadway Improvement Cost: $2,426,000,  Total Project Cost: $6,568,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102318,  Location: 1.3 MI.N.OF WAVERLY (Lat: 42.028658,  Lng: -76.523678),  Route carried "on" structure: State highway 34,  Year Built: 2019,  Status: Open,  Structure Length: 3.78m (12.40ft),  Average Daily Traffic: 4,855 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,064 (year 2040),  Design Load: HL 93,  Features Intersected: MP 274.41 NOR SOU
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.556,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.7m (113.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.77m (12.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,047,000,  Roadway Improvement Cost: $1,199,000,  Total Project Cost: $3,246,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102319,  Location: 6.8 MI NORTH OF WAVERLY (Lat: 42.104992,  Lng: -76.545883),  Route carried "on" structure: State highway 34,  Year Built: 1959,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 1,927 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 2,010 (year 2040),  Design Load: HL 93,  Features Intersected: DEAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.421,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $721,000,  Roadway Improvement Cost: $422,000,  Total Project Cost: $1,144,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1061511,  Location: 0.2 MI SE JCT SH17 & SH34 (Lat: 42.000181,  Lng: -76.521597),  Route carried "on" structure: State highway 17,  Year Built: 1973,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 7,235 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 8,384 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ITHACA CENTRAL RR
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.2m (118.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,980,000,  Roadway Improvement Cost: $1,160,000,  Total Project Cost: $3,140,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1061512,  Location: .2 MI SE JCT SH 17 & SH 3 (Lat: 41.999967,  Lng: -76.521550),  Route carried "on" structure: State highway 17,  Year Built: 1973,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 6.71m (22.01ft),  Average Daily Traffic: 7,235 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 8,384 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ITHACA CENTRAL RR
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 36.2m (118.8ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.70m (21.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $1,980,000,  Roadway Improvement Cost: $1,160,000,  Total Project Cost: $3,140,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1061521,  Location: 2 MI SE JCT SH 17 & SH 34 (Lat: 42.006461,  Lng: -76.485050),  Route carried "on" structure: State highway 17,  Year Built: 1973,  Status: Open,  Structure Length: 3.57m (11.71ft),  Average Daily Traffic: 7,235 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 11,290 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SHEPARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.098,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.56m (11.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,451,000,  Roadway Improvement Cost: $850,000,  Total Project Cost: $2,301,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1061522,  Location: 2 MI SE JCT SH 17 & SH 34 (Lat: 42.006156,  Lng: -76.485256),  Route carried "on" structure: State highway 17,  Year Built: 1973,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 7,235 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 11,290 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: SHEPARD ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.098,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $1,466,000,  Roadway Improvement Cost: $858,000,  Total Project Cost: $2,324,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 106202,  Location: 2.2 MI SE JCT SH17 & SH34 (Lat: 42.006531,  Lng: -76.480542),  Route carried "on" structure: State highway 17,  Year Built: 1973,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 14,470 (year 2020),  Truck Traffic: 28%,  Average Future Daily Traffic: 22,580 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ELLIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.500,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.5m (77.1ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.0m (19.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $512,000,  Total Project Cost: $1,387,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109094,  Location: 4.4 MI N OF WAVERLY (Lat: 42.069906,  Lng: -76.543344),  Route carried "on" structure: State highway 34,  Year Built: 1937,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,855 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,064 (year 2040),  Design Load: H 20,  Features Intersected: KING HOLLOW CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.479,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $488,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 109095,  Location: 3.1 MI N OF WAVERLY (Lat: 42.051411,  Lng: -76.536294),  Route carried "on" structure: State highway 34,  Year Built: 1937,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,855 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,064 (year 2040),  Design Load: H 20,  Features Intersected: RANCH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.339,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.7m (31.8ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $479,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 109096,  Location: 2.2 MI N OF WAVERLY (Lat: 42.039289,  Lng: -76.528569),  Route carried "on" structure: State highway 34,  Year Built: 1937,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 4,855 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,064 (year 2040),  Design Load: H 20,  Features Intersected: SPRING BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.843,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.9m (35.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $301,000,  Roadway Improvement Cost: $176,000,  Total Project Cost: $477,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 221824,  Location: 2 MILES SW OF BARTON (Lat: 42.022125,  Lng: -76.468389),  Route carried "on" structure: Other road ,  Year Built: 2016,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 172 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 241 (year 2039),  Design Load: HL 93,  Features Intersected: NORFOLK SOUTHERN RR,  Facility Carried by Structure: BARTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.3m (14.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $451,000,  Roadway Improvement Cost: $264,000,  Total Project Cost: $716,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 221826,  Location: IN BARTON (Lat: 42.041614,  Lng: -76.445033),  Route carried "on" structure: Other road ,  Year Built: 2015,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 110 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 154 (year 2037),  Features Intersected: BUTSON CREEK,  Facility Carried by Structure: BARTON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.588,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 7.1m (23.3ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Channel: Poor,  Culverts: Very good,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $153,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $242,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 221828,  Location: 3.8 MI N OF WAVERLY (Lat: 42.050994,  Lng: -76.539558),  Route carried "on" structure: Other road ,  Year Built: 1938,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 100 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 140 (year 2037),  Features Intersected: GLORY GULCH CREEK,  Facility Carried by Structure: CAMPTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.338,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $230,000,  Roadway Improvement Cost: $135,000,  Total Project Cost: $365,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 221831,  Location: 1.0 MI S OF LOCKWOOD (Lat: 42.076808,  Lng: -76.547417),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 3.60m (11.81ft),  Average Daily Traffic: 43 (year 2019),  Average Future Daily Traffic: 60 (year 2039),  Features Intersected: CAYUTA CREEK,  Facility Carried by Structure: MILLER HOLLOW RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.4m (103.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 5.1m (16.7ft)

Condition: Deck: Excellent,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.59m (11.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $402,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $638,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 221832,  Location: 1.9 MI N OF LOCKWOOD (Lat: 42.116244,  Lng: -76.547214),  Route carried "on" structure: Other road ,  Year Built: 1958,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 5.46m (17.91ft),  Average Daily Traffic: 66 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 92 (year 2037),  Design Load: HS 20,  Features Intersected: CAYUTA CREEK,  Facility Carried by Structure: RENIFF ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.6m (57.7ft),  Curb-To-Curb Width: 3.9m (12.8ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 71.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.45m (17.88ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $640,000,  Roadway Improvement Cost: $375,000,  Total Project Cost: $1,015,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 333479,  Location: 3.1 MI S OF LOCKWOOD (Lat: 42.050667,  Lng: -76.537672),  Route carried "on" structure: Other road ,  Year Built: 2008,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 100 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 140 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: CAYUTA CREEK,  Facility Carried by Structure: CAMPTOWN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Excellent,  Inventory Rating: 85.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.35m (10.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $679,000,  Roadway Improvement Cost: $398,000,  Total Project Cost: $1,077,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33348,  Location: IN LOCKWOOD (Lat: 42.091942,  Lng: -76.547122),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 4.72m (15.49ft),  Average Daily Traffic: 512 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 717 (year 2037),  Design Load: HL 93,  Features Intersected: CAYUTA CREEK,  Facility Carried by Structure: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.72m (15.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,025,000,  Roadway Improvement Cost: $600,000,  Total Project Cost: $1,624,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333482,  Location: 1 MILE NE OF LOCKWOOD (Lat: 42.106572,  Lng: -76.541039),  Route carried "on" structure: County highway ,  Year Built: 1990,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 552 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 773 (year 2037),  Design Load: HS 20,  Features Intersected: DEAN CREEK,  Facility Carried by Structure: DEAN CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.467,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.1m (26.6ft)

Condition: Deck: Excellent,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $745,000,  Roadway Improvement Cost: $436,000,  Total Project Cost: $1,181,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333487,  Location: IN WAVERLY (Lat: 42.003133,  Lng: -76.522142),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 12.71m (41.70ft),  Average Daily Traffic: 5,235 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,477 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SOUTHERN R.R., C,  Facility Carried by Structure: BROAD STREET EXTEN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.2m (108.9ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 12.71m (41.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,964,000,  Roadway Improvement Cost: $2,322,000,  Total Project Cost: $6,286,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333488,  Location: 1.9 MI WEST OF BARTON (Lat: 42.039944,  Lng: -76.482783),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 389 (year 2017),  Truck Traffic: 13%,  Average Future Daily Traffic: 545 (year 2037),  Design Load: HS 20,  Features Intersected: ELLIS CREEK,  Facility Carried by Structure: ELLIS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.652,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.4m (66.9ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.22m (7.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $600,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $952,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333489,  Location: 2.3 MI NW OF BARTON (Lat: 42.060136,  Lng: -76.485583),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 421 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 589 (year 2036),  Features Intersected: ELLIS CREEK,  Facility Carried by Structure: ELLIS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.002,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Aluminum, Iron,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft)

Condition: Channel: Satisfactory,  Culverts: Very good,  Operating Rating: 80.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $119,000,  Roadway Improvement Cost: $69,000,  Total Project Cost: $188,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33349,  Location: 2.6 MI NW OF BARTON (Lat: 42.068800,  Lng: -76.484014),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 421 (year 2016),  Truck Traffic: 16%,  Average Future Daily Traffic: 589 (year 2036),  Design Load: HS 20,  Features Intersected: ELLIS CREEK,  Facility Carried by Structure: COUNTY ROAD 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.112,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $606,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 333494,  Location: 0.5 MILE NORTH OF BARTON (Lat: 42.049167,  Lng: -76.451553),  Route carried "on" structure: Alternate County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 345 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 483 (year 2037),  Design Load: HS 20,  Features Intersected: BUTSON CREEK,  Facility Carried by Structure: COUNTY RD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Skew: 1 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.46m (4.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $492,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $780,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 333495,  Location: 3.7 MI SW STRAITS CORNERS (Lat: 42.136778,  Lng: -76.445172),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 154 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 216 (year 2037),  Design Load: HL 93,  Features Intersected: S BR CATATONK CREEK,  Facility Carried by Structure: HAMILTON VALLEY RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.462,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.9m (39.0ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $266,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $421,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 335933,  Location: 1.4 MI NE OF LOCKWOOD (Lat: 42.114611,  Lng: -76.531944),  Route carried "on" structure: County highway ,  Year Built: 1985,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 552 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 773 (year 2037),  Design Load: HS 20,  Features Intersected: DEAN CREEK,  Facility Carried by Structure: DEAN CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 33.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.09m (3.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $412,000,  Roadway Improvement Cost: $241,000,  Total Project Cost: $653,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1061521,  Location: 2 MI SE JCT SH 17 & SH 34 (Lat: 42.006461,  Lng: -76.485050),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Features Intersected: SHEPARD ROAD,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.72m (15.49ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 1061522,  Location: 2 MI SE JCT SH 17 & SH 34 (Lat: 42.006156,  Lng: -76.485256),  Route carried "under" structure: Other road ,  Year Built: 1973,  Structure Length: 0. m,  Features Intersected: SHEPARD ROAD,  Facility Carried by Structure: RTE 17
Minimum Vertical Clearance: 4.67m (15.32ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.1m (111.9ft)

Find on map >>   Show street view

Structure Number: 721833,  Location: 3.1 MI SW OF BARTON (Lat: 42.007658,  Lng: -76.484167),  Route carried "under" structure: Other road ,  Year Built: 1915,  Structure Length: 0. m,  Features Intersected: SHEPHERD ROAD,  Facility Carried by Structure: NORFOLK SOUTHERN
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 11.2m (36.7ft)

Discuss Barton, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.