Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Avon, Colorado (CO)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 295ft / 89.9mTotal length
  • $20,243,000Total costs
  • 159,373Total average daily traffic
  • 13,205Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Avon
  • No street view available for this location

New bridges in Avon, CO - historical statistics
  • New bridges - historical statistics
  • 81970-1979
  • 11980-1989
  • 31990-1999
  • 32000-2009
Average Bridge Daily Traffic in Avon, CO
Average Bridge Truck Traffic in Avon, CO
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 50.0%Satisfactory
  • 25.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 8.3%Very good
  • 58.3%Good
  • 33.3%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 66.7%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 87.5%Very good
  • 12.5%Good
Find on map >>   Show street view

Structure Number: AVON-BEAVER CR,  Location: 0.1 MI N OF SH6 (Lat: 39.636306,  Lng: -106.536672),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 3,391 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,205 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE RIVER,  Facility Carried by Structure: W BEAVER CK BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.200,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 25.8m (84.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 40.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.74m (8.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $441,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $485,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: AVON-BOB,  Location: .3 MI S OF JCT I 70 ML (Lat: 39.631806,  Lng: -106.522289),  Route carried "on" structure: City street ,  Year Built: 1991,  Status: Open,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 13,283 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 16,471 (year 2040),  Design Load: HS 20,  Features Intersected: EAGLE RIVER,  Facility Carried by Structure: AVON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.096,  Lanes on structure: 5,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.7m (127.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 26.1m (85.6ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 66.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: AVON-BUCK CK-1,  Location: 0.4 MI N OF NOTTINGHAM RD (Lat: 39.646433,  Lng: -106.516536),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 440 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 546 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK CREEK,  Facility Carried by Structure: MOUNTAIN STAR DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.988,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 30.0m (98.4ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 46.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: AVON-BUCK CK-2,  Location: 0.5 MI N OF NOTTINGHAM RD (Lat: 39.647492,  Lng: -106.518558),  Route carried "on" structure: City street ,  Year Built: 1993,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 440 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 546 (year 2040),  Design Load: HS 20,  Features Intersected: BUCK CREEK TRIBUTARY,  Facility Carried by Structure: BUCK CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.824,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.1m (121.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 44.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: AVON-EAGLE BEND,  Location: 0.01 MI N OF SH 6 (Lat: 39.627778,  Lng: -106.512617),  Route carried "on" structure: City street ,  Year Built: 1982,  Status: Posted for load-capacity,  Structure Length: 4.20m (13.78ft),  Average Daily Traffic: 1,629 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,020 (year 2040),  Features Intersected: EAGLE RIVER,  Facility Carried by Structure: STONEBRIDGE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.029,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.2m (128.6ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 0.0m,  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 36.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Membrane: Other
Find on map >>   Show street view

Structure Number: AVON-POST BLVD,  Location: JUST N OF HWY 6 (Lat: 39.624661,  Lng: -106.504539),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 6,590 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,172 (year 2041),  Design Load: HS 25 or greater,  Features Intersected: EAGLE RIVER,  Facility Carried by Structure: POST BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.011,  Lanes on structure: 4,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 39.0m (128.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 25.8m (84.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F-10-D,  Location: 2 MI E. OF AVON INT. (Lat: 39.627683,  Lng: -106.495478),  Route carried "on" structure: Interstate 70A,  Year Built: 2003,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,510 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CITY STREET,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 271.969,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F-10-S,  Location: AVON INTERCHANGE (Lat: 39.637508,  Lng: -106.521383),  Route carried "on" structure: Interstate 70A,  Year Built: 1971,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,440 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: AVON ROAD,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.475,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F-10-T,  Location: AVON INTERCHANGE (Lat: 39.637222,  Lng: -106.521664),  Route carried "on" structure: Interstate 70A,  Year Built: 1971,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 17,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,440 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: AVON ROAD,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 269.473,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 10 degrees,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 50.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.39m (14.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $231,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $346,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: F-10-W,  Location: 2 MI E OF AVON INT. (Lat: 39.627542,  Lng: -106.495892),  Route carried "on" structure: Interstate 70A,  Year Built: 2003,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,510 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CITY STREET,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 271.963,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 11 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 13.9m (45.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F-11-AB,  Location: 2.2 MI E OF JCT US 24 (Lat: 39.623594,  Lng: -106.485900),  Route carried "on" structure: Interstate 70A,  Year Built: 1972,  Status: Open,  Structure Length: 19.94m (65.42ft),  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,510 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: US 6, RR, EAGLE RIVER,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.954,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 15 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 47.9m (157.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 52.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 19.94m (65.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $4,196,000,  Roadway Improvement Cost: $420,000,  Total Project Cost: $6,294,000,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F-11-AC,  Location: 12.3 MI E OF JCT SH 131 (Lat: 39.623608,  Lng: -106.486742),  Route carried "on" structure: Interstate 70A,  Year Built: 1972,  Status: Open,  Structure Length: 19.94m (65.42ft),  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 24,510 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: US 6, RR, EAGLE RIVER,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 272.893,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 15 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 47.9m (157.2ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 19.90m (65.29ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $8,745,000,  Roadway Improvement Cost: $875,000,  Total Project Cost: $13,118,000 ( Estimate for 2016),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F-10-S,  Location: AVON INTERCHANGE (Lat: 39.637508,  Lng: -106.521383),  Route carried "under" structure: City street ,  Year Built: 1971,  Structure Length: 0. m,  Average Daily Traffic: 17,000 (year 2008),  Truck Traffic: 19%,  Features Intersected: AVON ROAD,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: F-11-AB,  Location: 2.2 MI E OF JCT US 24 (Lat: 39.623594,  Lng: -106.485900),  Route carried "under" structure: US 6E,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2011),  Truck Traffic: 4%,  Features Intersected: US 6, RR, EAGLE RIVER,  Facility Carried by Structure: I 70 ML WBND
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 277.076,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.9m (157.2ft)

Find on map >>   Show street view

Structure Number: F-11-AC,  Location: 12.3 MI E OF JCT SH 131 (Lat: 39.623608,  Lng: -106.486742),  Route carried "under" structure: US 6E,  Year Built: 1972,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2011),  Truck Traffic: 4%,  Features Intersected: US 6, RR, EAGLE RIVER,  Facility Carried by Structure: I 70 ML EBND
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 277.076,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.9m (157.2ft)

Discuss Avon, Colorado (CO) on our hugely popular Colorado forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.