Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Ashland, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 69ft / 21.5mTotal length
  • $8,321,000Total costs
  • 16,074Total average daily traffic
  • 1,055Total average daily truck traffic
  • 22,686Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ashland
  • No street view available for this location

New bridges in Ashland, AL - historical statistics
  • New bridges - historical statistics
  • 21950-1959
  • 31960-1969
  • 21970-1979
  • 31990-1999
  • 12000-2009
Average Bridge Daily Traffic in Ashland, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Very good
  • 66.7%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Excellent
  • 33.3%Very good
  • 33.3%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 36.4%Very good
  • 9.1%Good
  • 27.3%Satisfactory
  • 27.3%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 12.5%Very good
  • 37.5%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 3659,  Location: ASHLAND TO HIGHPINE (Lat: 33.256081,  Lng: -85.866067),  Route carried "on" structure: County highway 10,  Year Built: 1950,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 281 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 418 (year 2036),  Design Load: H 20,  Features Intersected: ENITACHOPCO CREEK,  Facility Carried by Structure: CO 34
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $446,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 4019,  Location: CITY OF ASHLAND (Lat: 33.279722,  Lng: -85.818083),  Route carried "on" structure: State highway 9,  Year Built: 1951,  Status: Open,  Structure Length: 0.95m (3.12ft),  Average Daily Traffic: 5,581 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 7,813 (year 2038),  Design Load: H 15,  Features Intersected: HORSE TROUGH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 294.983,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Fair,  Operating Rating: 55.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.63m (5.35ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $383,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 7626,  Location: 0.5 MI N. INTERSECT. 22 (Lat: 33.204064,  Lng: -85.845561),  Route carried "on" structure: County highway 4,  Year Built: 1962,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 879 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,306 (year 2036),  Design Load: H 20,  Features Intersected: LYNCH CREEK,  Facility Carried by Structure: CO 05
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.26m (4.13ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $364,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $400,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 8437,  Location: .4 M S COUNTRY CLUB (Lat: 33.269667,  Lng: -85.787167),  Route carried "on" structure: County highway 129,  Year Built: 1964,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 19 (year 2016),  Average Future Daily Traffic: 28 (year 2036),  Design Load: H 20,  Features Intersected: HORSETROUGH CREEK,  Facility Carried by Structure: COUNTRY CLUB ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 66.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.71m (5.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $356,000,  Roadway Improvement Cost: $36,000,  Total Project Cost: $392,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9356,  Location: 1.5 M SE HARKINS XROADS (Lat: 33.218464,  Lng: -85.847397),  Route carried "on" structure: County highway 31,  Year Built: 1967,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 260 (year 2016),  Truck Traffic: 4%,  Average Future Daily Traffic: 390 (year 2036),  Design Load: H 20,  Features Intersected: ENITACHOPCO CREEK,  Facility Carried by Structure: OWENS RD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.86m (6.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $538,000,  Roadway Improvement Cost: $54,000,  Total Project Cost: $592,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10984,  Location: 3 MI W ASHLAND (Lat: 33.273300,  Lng: -85.867400),  Route carried "on" structure: State highway 77,  Year Built: 1973,  Status: Open,  Structure Length: 0.57m (1.87ft),  Average Daily Traffic: 2,752 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,853 (year 2040),  Design Load: HS 20,  Features Intersected: BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.681,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.8m (9.2ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.17m (3.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $568,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $625,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 10985,  Location: 4.5 MI N ASHLAND/CO RD130 (Lat: 33.281200,  Lng: -85.890400),  Route carried "on" structure: State highway 77,  Year Built: 1973,  Status: Open,  Structure Length: 1.27m (4.17ft),  Average Daily Traffic: 2,752 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,853 (year 2040),  Design Load: H 20,  Features Intersected: TRIB. TO ENITACHOPO CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 70.151,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.95m (6.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,045,000,  Roadway Improvement Cost: $105,000,  Total Project Cost: $1,150,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 16819,  Location: 5.5MI N MILLERVILLE (Lat: 33.239975,  Lng: -85.859700),  Route carried "on" structure: State highway 9,  Year Built: 1997,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 2,905 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,067 (year 2040),  Design Load: HS 20,  Features Intersected: ENITACHOPCO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 290.245,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.56m (18.24ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,602,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $1,762,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 17695,  Location: 6 MILES S OF ASHLAND (Lat: 33.192561,  Lng: -85.808078),  Route carried "on" structure: County highway ,  Year Built: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 33 (year 2016),  Average Future Daily Traffic: 49 (year 2036),  Features Intersected: CARR CREEK,  Facility Carried by Structure: WINDMILL ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.6m (15.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 83.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.59m (5.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $174,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $191,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18145,  Location: 2.5 MILES S OF HARKINS (Lat: 33.198403,  Lng: -85.842994),  Route carried "on" structure: County highway ,  Year Built: 1998,  Status: Open,  Structure Length: 7.10m (23.29ft),  Average Daily Traffic: 420 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 624 (year 2036),  Design Load: HS 20,  Features Intersected: ENITACHAPCO CREEK,  Facility Carried by Structure: NEW PROSPECT ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.6m (21.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.8m (78.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,561,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $1,717,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18693,  Location: 4 MI N OF ASHLAND (Lat: 33.289181,  Lng: -85.795850),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 192 (year 2016),  Average Future Daily Traffic: 285 (year 2036),  Design Load: HS 20,  Features Intersected: OLD TOWN CREEK,  Facility Carried by Structure: AIRPORT ROAD
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 61.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.27m (7.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $603,000,  Roadway Improvement Cost: $60,000,  Total Project Cost: $663,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Discuss Ashland, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.