Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Angier, North Carolina (NC)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 102ft / 30.6mTotal length
  • 72,100Total average daily traffic
  • 12,603Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Angier
  • No street view available for this location

New bridges in Angier, NC - historical statistics
  • New bridges - historical statistics
  • 11970-1979
  • 51980-1989
  • 31990-1999
  • 32010-2019
  • 12020-2022
Average Bridge Daily Traffic in Angier, NC
Average Bridge Truck Traffic in Angier, NC
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 37.5%Very good
  • 37.5%Good
  • 12.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Excellent
  • 50.0%Very good
  • 25.0%Good
  • 12.5%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Excellent
  • 25.0%Very good
  • 37.5%Good
  • 25.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 80.0%Good
  • 20.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Satisfactory
  • 66.7%Fair
Find on map >>   Show street view

Structure Number: 850002,  Location: 0.2 MI.W.JCT.SR1446 (Lat: 35.514533,  Lng: -78.786108),  Route carried "on" structure: State highway 1441,  Year Built: 1989,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 2,300 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,600 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: KENNETH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 850003,  Location: 0.4 MI.E.JCT.SR1448 (Lat: 35.514225,  Lng: -78.765058),  Route carried "on" structure: State highway 1441,  Year Built: 2014,  Status: Open,  Structure Length: 3.13m (10.27ft),  Average Daily Traffic: 2,300 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,600 (year 2040),  Design Load: HL 93,  Features Intersected: NEILS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 49.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 850014,  Location: 0.6MI.S. OF JCT.SR1500 (Lat: 35.487211,  Lng: -78.700706),  Route carried "on" structure: State highway 1006,  Year Built: 1994,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 1,900 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BLACK RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 850204,  Location: 0.5 MI.N.SR1542 (Lat: 35.455636,  Lng: -78.755228),  Route carried "on" structure: State highway 1510,  Year Built: 1994,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 750 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,500 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: W.BUIES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 73.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 850233,  Location: 0.9 MI. N. JCT. SR1532 (Lat: 35.487978,  Lng: -78.709233),  Route carried "on" structure: State highway 1544,  Year Built: 2019,  Status: Open,  Structure Length: 2.49m (8.17ft),  Average Daily Traffic: 590 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,180 (year 2040),  Design Load: HL 93,  Features Intersected: BLACK RIVER TRIB.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 49.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101002,  Location: 0.1MI S.JCT SR2314 (Lat: 35.463478,  Lng: -78.184789),  Route carried "on" structure: State highway 2531,  Year Built: 1994,  Status: Open,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 860 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,720 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: MOCASSIN CREEK,  Facility Carried by Structure: SR2530
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.3m (33.8ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: Febuary 2022,  Underwater Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1010024,  Location: 0.8 MI.E. OF JCT.SR1313 (Lat: 35.518272,  Lng: -78.650525),  Route carried "on" structure: State highway 210,  Year Built: 1983,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 7,800 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,600 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 45.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 1010129,  Location: 0.9 MI N JCT NC210 (Lat: 35.526611,  Lng: -78.693833),  Route carried "on" structure: State highway 1006,  Year Built: 2014,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 1,800 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,600 (year 2040),  Design Load: HL 93,  Features Intersected: LITTLE BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 16.4m (53.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 46.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010496,  Location: 1.0 MI.S.NC50 (Lat: 35.552619,  Lng: -78.579369),  Route carried "on" structure: State highway 1517,  Year Built: 1987,  Status: Open,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 2,700 (year 2013),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,400 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: I40
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 5.4m (17.7ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1010554,  Location: 0.2MI S. JCT.SR1540 (Lat: 35.529619,  Lng: -78.667511),  Route carried "on" structure: State highway 1531,  Year Built: 1970,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 1,900 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,800 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: LITTLE BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.0m (19.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 41.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021
Find on map >>   Show street view

Structure Number: 1830376,  Location: 0.6M. S. JCT. SR2760 (Lat: 35.527169,  Lng: -78.703306),  Route carried "on" structure: State highway 2761,  Year Built: 2020,  Status: Open,  Structure Length: 2.19m (7.19ft),  Average Daily Traffic: 1,200 (year 2015),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,400 (year 2040),  Design Load: HL 93,  Features Intersected: LITTLE BLACK CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1010496,  Location: 1.0 MI.S.NC50 (Lat: 35.552619,  Lng: -78.579369),  Route carried "under" structure: Interstate 40,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2013),  Truck Traffic: 23%,  Features Intersected: SR1517
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 96.257,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Find on map >>   Show street view

Structure Number: 1010496,  Location: 1.0 MI.S.NC50 (Lat: 35.552619,  Lng: -78.579369),  Route carried "under" structure: Interstate 40,  Year Built: 1987,  Structure Length: 0. m,  Average Daily Traffic: 24,000 (year 2013),  Truck Traffic: 23%,  Features Intersected: SR1517
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 96.257,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.8m (65.0ft)

Discuss Angier, North Carolina (NC) on our hugely popular North Carolina forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.