Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Alva, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 10Number of bridges
  • 128ft / 39.1mTotal length
  • 56,941Total average daily traffic
  • 7,138Total average daily truck traffic
  • 90,588Total future (year 2041) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Alva
  • No street view available for this location

New bridges in Alva, FL - historical statistics
  • New bridges - historical statistics
  • 41950-1959
  • 11960-1969
  • 11980-1989
  • 21990-1999
  • 22000-2009
Average Bridge Daily Traffic in Alva, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 66.7%Good
  • 16.7%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 83.3%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 83.3%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Very good
  • 70.0%Good
  • 10.0%Satisfactory
Find on map >>   Show street view

Structure Number: 120042,  Location: 0.2 MILE N/O SR-80 (Lat: 26.713481,  Lng: -81.609994),  Route carried "on" structure: County highway ,  Year Built: 1969,  Status: Posted for load-capacity,  Structure Length: 16.67m (54.69ft),  Average Daily Traffic: 3,200 (year 2022),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,000 (year 2042),  Design Load: H 20,  Features Intersected: CALOOSAHATCHEE RIVER,  Facility Carried by Structure: BROADWAY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Navigation Control: Yes ( Vertical Clearance: 5.9m (19.4ft), Horizontal Clearance: 27.4m (89.9ft)),  Material/Design: Steel,  Design/Construction: Movable - Bascule,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 9,  Length of Maximum Span: 31.7m (104.0ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.1m (3.6ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Critical Feature Inspection Date: January 2022,  Underwater Inspection Date: December 2021,  Other Special Inspection Date: January 2022,  Deck Structure Type: Open Grating
Find on map >>   Show street view

Structure Number: 120159,  Location: 5.7MI EAST OF SR-31 (Lat: 26.715283,  Lng: -81.672556),  Route carried "on" structure: State highway 80,  Year Built: 1989,  Status: Open,  Structure Length: 4.92m (16.14ft),  Average Daily Traffic: 24,000 (year 2021),  Truck Traffic: 14%,  Average Future Daily Traffic: 41,640 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: HICKEY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.111,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.7m (71.2ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.0m (32.8ft),  Curb-To-Curb Width: 27.7m (90.9ft),  Out-to-Out Width: 28.2m (92.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120165,  Location: 0.1 MI E of CR-884 (Lat: 26.709056,  Lng: -81.599472),  Route carried "on" structure: State highway 80,  Year Built: 2004,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 10,000 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,350 (year 2041),  Design Load: HL 93,  Features Intersected: BEDMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.445,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 57.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 120186,  Location: 0.1MI EAST OF CR-884 (Lat: 26.709075,  Lng: -81.599653),  Route carried "on" structure: State highway 80,  Year Built: 2004,  Status: Open,  Structure Length: 3.66m (12.01ft),  Average Daily Traffic: 10,000 (year 2021),  Truck Traffic: 15%,  Average Future Daily Traffic: 17,350 (year 2042),  Design Load: HL 93,  Features Intersected: BEDMAN CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.424,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.1m (52.8ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 16.1m (52.8ft),  Out-to-Out Width: 17.0m (55.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 57.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 124035,  Location: 6.2 MI. E OF SR-31 (Lat: 26.724694,  Lng: -81.668500),  Route carried "on" structure: County highway 78,  Year Built: 1956,  Status: Open,  Structure Length: 0.75m (2.46ft),  Average Daily Traffic: 1,602 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,682 (year 2041),  Features Intersected: FICHTERS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 10.115,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 124037,  Location: 8.7 Mi. E of SR-31 (Lat: 26.725944,  Lng: -81.627056),  Route carried "on" structure: County highway 78,  Year Built: 1956,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,602 (year 2021),  Truck Traffic: 3%,  Average Future Daily Traffic: 1,682 (year 2041),  Design Load: H 15,  Features Intersected: CYPRESS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.252,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: June 2021
Find on map >>   Show street view

Structure Number: 124039,  Location: 2Mi W of Hendry Co Line (Lat: 26.725694,  Lng: -81.599472),  Route carried "on" structure: County highway 78,  Year Built: 1956,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 1,833 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,925 (year 2041),  Features Intersected: SPANISH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.044,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.0m (13.1ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 12404,  Location: 0.7MI W OF HENDRY CO LINE (Lat: 26.725528,  Lng: -81.578000),  Route carried "on" structure: County highway 78,  Year Built: 1956,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 1,833 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,925 (year 2041),  Features Intersected: MILLERS GULLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.142,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.6m (8.5ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 124079,  Location: 0.2 MI. SOUTH OF SR-78 (Lat: 26.720944,  Lng: -81.631889),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 101 (year 2021),  Truck Traffic: 1%,  Average Future Daily Traffic: 125 (year 2041),  Design Load: HS 20,  Features Intersected: CYPRESS CREEK,  Facility Carried by Structure: CYPRESS CREEK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 68.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 124093,  Location: 4.1 MI. E OF SR-31 (Lat: 26.730611,  Lng: -81.701583),  Route carried "on" structure: County highway 78,  Year Built: 1995,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 2,770 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,909 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: TELEGRAPH CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.545,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 79.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Underwater Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Discuss Alva, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.