Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Aliceville, Alabama (AL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 384ft / 117mTotal length
  • $36,946,000Total costs
  • 31,458Total average daily traffic
  • 3,542Total average daily truck traffic
  • 45,532Total future (year 2028) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Aliceville
  • No street view available for this location

New bridges in Aliceville, AL - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 51940-1949
  • 61950-1959
  • 11960-1969
  • 31970-1979
  • 71980-1989
  • 22000-2009
  • 22010-2019
Reconstructed bridges in Aliceville, AL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11970-1979
  • 21980-1989
Average Bridge Daily Traffic in Aliceville, AL
Average Bridge Truck Traffic in Aliceville, AL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 11.8%Good
  • 76.5%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.8%Very good
  • 35.3%Good
  • 35.3%Satisfactory
  • 11.8%Fair
  • 5.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Very good
  • 35.3%Good
  • 29.4%Satisfactory
  • 23.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 3.8%Excellent
  • 15.4%Very good
  • 34.6%Good
  • 26.9%Satisfactory
  • 19.2%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 10.0%Excellent
  • 10.0%Very good
  • 30.0%Good
  • 50.0%Satisfactory
Find on map >>   Show street view

Structure Number: 169,  Location: 2.5 MI N JCT SR 14 (Lat: 33.164983,  Lng: -88.110367),  Route carried "on" structure: State highway 17,  Year Built: 1926,  Year Reconstructed: 1982,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 3,429 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,224 (year 2040),  Design Load: H 15,  Features Intersected: Trib. of Lubbub Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 310.861,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 65.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.77m (5.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $490,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $539,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2672,  Location: 1.5 MI E ALICEVILLE (Lat: 33.102764,  Lng: -88.141033),  Route carried "on" structure: State highway 14,  Year Built: 1942,  Status: Open,  Structure Length: 14.39m (47.21ft),  Average Daily Traffic: 1,083 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,482 (year 2033),  Design Load: H 15,  Features Intersected: Lubub Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.236,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 10,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.5 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 22.2 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 15.17m (49.77ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Underwater Inspection Date: July 2020,  Bridge Improvement Cost: $3,226,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $3,549,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2673,  Location: 2.5 MI E ALICEVILLE (Lat: 33.096033,  Lng: -88.136200),  Route carried "on" structure: State highway 14,  Year Built: 1942,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,083 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,482 (year 2041),  Design Load: H 15,  Features Intersected: Lubub Creek Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.486,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 2.1m (6.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.83m (6.00ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $476,000,  Roadway Improvement Cost: $48,000,  Total Project Cost: $524,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2674,  Location: 2.8 MI E ALICEVILLE (Lat: 33.092667,  Lng: -88.134200),  Route carried "on" structure: State highway 14,  Year Built: 1942,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 1,083 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,482 (year 2041),  Design Load: H 15,  Features Intersected: Lubbub Creek Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.592,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 88.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.45m (4.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $368,000,  Roadway Improvement Cost: $37,000,  Total Project Cost: $405,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 2675,  Location: 1.0 MI W GREENE CO LINE (Lat: 33.052917,  Lng: -88.122433),  Route carried "on" structure: State highway 14,  Year Built: 1942,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,220 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 1,643 (year 2041),  Design Load: H 15,  Features Intersected: Lubbub Creek Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.383,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.5m (11.5ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.38m (4.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $350,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $385,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3187,  Location: 3.2 MI EAST OF ST RT 14 (Lat: 33.116811,  Lng: -88.085431),  Route carried "on" structure: County highway 2,  Year Built: 1948,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 600 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 650 (year 2032),  Design Load: H 15,  Features Intersected: STERING LAKE BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft),  Curb-To-Curb Width: 7.4m (24.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.41m (4.63ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $293,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $322,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3676,  Location: 4.5 MI NW OF SR17 (Lat: 33.176000,  Lng: -88.205900),  Route carried "on" structure: State highway 14,  Year Built: 1950,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 1,676 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,155 (year 2040),  Design Load: H 15,  Features Intersected: Beaver Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.533,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 68.8 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 47.1 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,107,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $1,218,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3677,  Location: 2.0 MI W ALICEVILLE (Lat: 33.147347,  Lng: -88.170536),  Route carried "on" structure: State highway 14,  Year Built: 1950,  Status: Closed,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 2,871 (year 2020),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,879 (year 2041),  Design Load: H 15,  Features Intersected: Blubber Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.133,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.9m (29.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: Febuary 2021,  Other Special Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,847,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,032,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 3678,  Location: 1.0 MI W ALICEVILLE (Lat: 33.140878,  Lng: -88.163342),  Route carried "on" structure: State highway 14,  Year Built: 1950,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 2,880 (year 2013),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,879 (year 2041),  Design Load: H 15,  Features Intersected: Blubber Creek Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.185,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.68m (5.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $348,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $383,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 3699,  Location: 1.1 MI NORTH ST RT #14 (Lat: 33.165403,  Lng: -88.170061),  Route carried "on" structure: County highway 19,  Year Built: 1950,  Status: Posted for load,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2034),  Design Load: H 15,  Features Intersected: BLUBBER CRK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.8m (19.0ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 40.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 1.84m (6.04ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $30,000,  Total Project Cost: $332,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5196,  Location: 2.5MI E OF SR 14 (Lat: 33.070644,  Lng: -88.099253),  Route carried "on" structure: County highway 23,  Year Built: 1955,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 550 (year 1998),  Truck Traffic: 15%,  Average Future Daily Traffic: 600 (year 2028),  Design Load: HS 20,  Features Intersected: HUGHES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 34.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $394,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $433,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 968,  Location: 0.5 MILES E OF JCT SR 17 (Lat: 33.155625,  Lng: -88.104531),  Route carried "on" structure: County highway 24,  Year Built: 1968,  Status: Posted for load,  Structure Length: 16.58m (54.40ft),  Average Daily Traffic: 300 (year 1998),  Truck Traffic: 3%,  Average Future Daily Traffic: 325 (year 2034),  Design Load: H 20,  Features Intersected: LUBBUB CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 39.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 10.0 - 19.9% below),  Length Of Structure Improvement: 17.32m (56.82ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: October 2021,  Other Special Inspection Date: October 2021,  Bridge Improvement Cost: $3,325,000,  Roadway Improvement Cost: $333,000,  Total Project Cost: $3,658,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1168,  Location: 0.4MI E OF US HWY # 17 (Lat: 33.093339,  Lng: -88.200922),  Route carried "on" structure: County highway 67,  Year Built: 1976,  Status: Posted for load,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 150 (year 1998),  Truck Traffic: 30%,  Average Future Daily Traffic: 200 (year 2034),  Design Load: H 15,  Features Intersected: HORTON BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 17.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $243,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $267,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 11681,  Location: .7 MILES EAST OF US#17 (Lat: 33.089550,  Lng: -88.197014),  Route carried "on" structure: County highway 67,  Year Built: 1976,  Status: Posted for load,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 150 (year 1998),  Truck Traffic: 30%,  Average Future Daily Traffic: 200 (year 2034),  Design Load: H 15,  Features Intersected: BEAVER POND BRANCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 17.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $308,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $339,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 1187,  Location: 1.5 MILES E CO RT #29 (Lat: 33.174519,  Lng: -88.118936),  Route carried "on" structure: County highway 201,  Year Built: 1977,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 50 (year 1998),  Average Future Daily Traffic: 75 (year 2034),  Features Intersected: JENKINS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 6.7m (22.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 22.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 11.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $238,000,  Roadway Improvement Cost: $24,000,  Total Project Cost: $262,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12364,  Location: 1.0 MI N TOMBIGBEE (Lat: 33.086583,  Lng: -88.228233),  Route carried "on" structure: State highway 17,  Year Built: 1980,  Status: Open,  Structure Length: 6.22m (20.41ft),  Average Daily Traffic: 1,524 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,102 (year 2036),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 295.302,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.26m (23.82ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,289,000,  Roadway Improvement Cost: $229,000,  Total Project Cost: $2,518,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12365,  Location: 1.5 MI N TOMBIGBEE RIVER (Lat: 33.085667,  Lng: -88.215928),  Route carried "on" structure: State highway 17,  Year Built: 1980,  Status: Open,  Structure Length: 18.68m (61.29ft),  Average Daily Traffic: 1,524 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,102 (year 2033),  Design Load: HS 20,  Features Intersected: Blubber Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 296.298,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 18,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 19.32m (63.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $6,095,000,  Roadway Improvement Cost: $610,000,  Total Project Cost: $6,705,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12366,  Location: 2.2 MI N TOMBIGBEE RIVER (Lat: 33.091261,  Lng: -88.208133),  Route carried "on" structure: State highway 17,  Year Built: 1980,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 1,524 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,102 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 297.301,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 11.28m (37.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,558,000,  Roadway Improvement Cost: $356,000,  Total Project Cost: $3,914,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12367,  Location: 2.7 MI N TOMBIGBEE RIVER (Lat: 33.096350,  Lng: -88.204767),  Route carried "on" structure: State highway 17,  Year Built: 1980,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 1,524 (year 2020),  Truck Traffic: 17%,  Average Future Daily Traffic: 2,102 (year 2040),  Design Load: HS 20,  Features Intersected: Tombigbee River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 298.125,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 61.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.29m (30.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,930,000,  Roadway Improvement Cost: $293,000,  Total Project Cost: $3,223,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 12842,  Location: 0.8MI. NORTH COUNTYRT.#23 (Lat: 33.079658,  Lng: -88.098322),  Route carried "on" structure: County highway 23A,  Year Built: 1982,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 25 (year 1998),  Average Future Daily Traffic: 25 (year 2034),  Design Load: H 15,  Features Intersected: HUGHES CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 4.8m (15.7ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 17.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 12.3 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $173,000,  Roadway Improvement Cost: $17,000,  Total Project Cost: $190,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13474,  Location: Aliceville City Limits (Lat: 33.118300,  Lng: -88.148100),  Route carried "on" structure: State highway 14,  Year Built: 1950,  Year Reconstructed: 1985,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 2,377 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 8,310 (year 2041),  Design Load: H 15,  Features Intersected: Stream
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 31.176,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 69.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $773,000,  Roadway Improvement Cost: $77,000,  Total Project Cost: $850,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 13698,  Location: 2.0 MI. E STATE RT #14 (Lat: 33.201214,  Lng: -88.205961),  Route carried "on" structure: County highway 196,  Year Built: 1985,  Status: Posted for load,  Structure Length: 1.86m (6.10ft),  Average Daily Traffic: 250 (year 1998),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2034),  Design Load: H 15,  Features Intersected: BEAVER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.6m (15.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 15.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 10.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 2.58m (8.46ft),  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $425,000,  Roadway Improvement Cost: $43,000,  Total Project Cost: $468,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 13928,  Location: AGR Railroad Aliceville (Lat: 33.128250,  Lng: -88.156353),  Route carried "on" structure: State highway 17,  Year Built: 1986,  Status: Open,  Structure Length: 5.85m (19.19ft),  Average Daily Traffic: 4,360 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,623 (year 2040),  Design Load: HS 20,  Features Intersected: AGR Railroad
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 304.034,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.2m (30.2ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 59.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.89m (22.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $1,748,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $1,923,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 18856,  Location: 1 MILE EAST OF AL 14?? (Lat: 33.109881,  Lng: -88.111761),  Route carried "on" structure: County highway 2,  Year Built: 2003,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 550 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 820 (year 2032),  Design Load: HS 20,  Features Intersected: COW CREEK
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 4.3m (14.1ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.47m (8.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $500,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $550,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 19586,  Location: 1.7 MI. NORTH JCT AL17 (Lat: 33.128842,  Lng: -88.197086),  Route carried "on" structure: County highway 194,  Year Built: 2007,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 30 (year 2007),  Average Future Daily Traffic: 45 (year 2029),  Design Load: HS 20,  Features Intersected: BLUBBER CREEK,  Facility Carried by Structure: NEW CANAAN CH.RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 71.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.96m (12.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $760,000,  Roadway Improvement Cost: $76,000,  Total Project Cost: $836,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 21113,  Location: 0.6 MI E of CORT #19 (Lat: 33.219244,  Lng: -88.163222),  Route carried "on" structure: County highway 40,  Year Built: 2018,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 195 (year 2015),  Truck Traffic: 2%,  Average Future Daily Traffic: 225 (year 2034),  Design Load: HS 20,  Features Intersected: Blubber Creek,  Facility Carried by Structure: Bonner Mill Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 6.1m (20.0ft)

Condition: Channel: Excellent,  Culverts: Excellent,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.14m (7.02ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $532,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $585,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: 21114,  Location: _ (Lat: 33.145128,  Lng: -88.221006),  Route carried "on" structure: County highway 192,  Year Built: 2018,  Status: Open,  Structure Length: 2.07m (6.79ft),  Average Daily Traffic: 150 (year 2019),  Truck Traffic: 1%,  Average Future Daily Traffic: 150 (year 2034),  Features Intersected: Beaver Creek,  Facility Carried by Structure: Bradford Rd (CR47)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.010,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.84m (9.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $487,000,  Roadway Improvement Cost: $49,000,  Total Project Cost: $536,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels
Discuss Aliceville, Alabama (AL) on our hugely popular Alabama forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.