Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Adams, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 29Number of bridges
  • 279ft / 85.3mTotal length
  • $32,121,000Total costs
  • 143,798Total average daily traffic
  • 13,147Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Adams
  • No street view available for this location

New bridges in Adams, NY - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 31940-1949
  • 51950-1959
  • 161960-1969
  • 11990-1999
  • 22000-2009
  • 12010-2019
Reconstructed bridges in Adams, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 61980-1989
  • 11990-1999
Average Bridge Daily Traffic in Adams, NY
Average Bridge Truck Traffic in Adams, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 17.6%Good
  • 23.5%Satisfactory
  • 41.2%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 5.9%Excellent
  • 5.9%Very good
  • 11.8%Good
  • 47.1%Satisfactory
  • 29.4%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.9%Excellent
  • 11.8%Very good
  • 17.6%Good
  • 5.9%Satisfactory
  • 58.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 36.4%Good
  • 18.2%Satisfactory
  • 18.2%Fair
Find on map >>   Show street view

Structure Number: 100864,  Location: 2.2 MI N JCT RT$ 11& 193 (Lat: 43.774644,  Lng: -76.036694),  Route carried "on" structure: US 11,  Year Built: 1991,  Status: Open,  Structure Length: 6.13m (20.11ft),  Average Daily Traffic: 1,866 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,946 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.277,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.12m (20.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,038,000,  Roadway Improvement Cost: $608,000,  Total Project Cost: $1,645,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100865,  Location: .2 MI S JCT RTS 11 & 178 (Lat: 43.808408,  Lng: -76.024342),  Route carried "on" structure: US 11,  Year Built: 1856,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 3,963 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 4,134 (year 2040),  Design Load: H 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.331,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 14.0 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.52m (4.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $405,000,  Roadway Improvement Cost: $237,000,  Total Project Cost: $642,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032031,  Location: 2.7 MI S JCT 178 + I-81 (Lat: 43.774467,  Lng: -76.045942),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 9.05m (29.69ft),  Average Daily Traffic: 9,336 (year 2009),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: SOUTH SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.228,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.05m (29.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,719,000,  Roadway Improvement Cost: $1,007,000,  Total Project Cost: $2,725,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032032,  Location: 2.7 MI S JCT 178 + I-81 (Lat: 43.774803,  Lng: -76.044339),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 9.05m (29.69ft),  Average Daily Traffic: 4,311 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,134 (year 2040),  Design Load: HS 20,  Features Intersected: SOUTH SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.180,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.05m (29.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,719,000,  Roadway Improvement Cost: $1,007,000,  Total Project Cost: $2,725,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103204,  Location: 2.5 MI S JCT 178 + I-81 (Lat: 43.777106,  Lng: -76.044344),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 296 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 414 (year 2035),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: COUNTY ROAD 85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.516,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $845,000,  Roadway Improvement Cost: $495,000,  Total Project Cost: $1,340,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 103205,  Location: 1.4 MI S JCT 178 + I-81 (Lat: 43.793236,  Lng: -76.041986),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 137 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 192 (year 2037),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: IKEY'S XING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.832,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.45m (14.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $933,000,  Roadway Improvement Cost: $546,000,  Total Project Cost: $1,480,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1032061,  Location: .3 MI S JCT SH 178 & I81 (Lat: 43.807922,  Lng: -76.036469),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 9,336 (year 2009),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: LIBERTY STREET CR-84 -W
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.961,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 63.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $923,000,  Roadway Improvement Cost: $541,000,  Total Project Cost: $1,464,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032062,  Location: .3 MI S JCT SH 178 & I81 (Lat: 43.807914,  Lng: -76.035972),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 4,311 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,134 (year 2040),  Design Load: HS 20,  Features Intersected: LIBERTY STREET CR-84_WB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.961,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 93.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $923,000,  Roadway Improvement Cost: $541,000,  Total Project Cost: $1,464,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1032071,  Location: 0.1 MI S JCT 178 + I-81 (Lat: 43.810203,  Lng: -76.035375),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 9,336 (year 2009),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.203,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Very good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,523,000,  Roadway Improvement Cost: $892,000,  Total Project Cost: $2,416,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032072,  Location: 0.1 MI S JCT 178 + I-81 (Lat: 43.810147,  Lng: -76.034900),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 8.14m (26.71ft),  Average Daily Traffic: 4,311 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 5,134 (year 2040),  Design Load: HS 20,  Features Intersected: SANDY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.203,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.13m (26.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,523,000,  Roadway Improvement Cost: $892,000,  Total Project Cost: $2,416,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032081,  Location: JCT OF RTS 178 + I-81 SB (Lat: 43.811144,  Lng: -76.034917),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 9,583 (year 2013),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: RTE 178
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.315,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $846,000,  Roadway Improvement Cost: $495,000,  Total Project Cost: $1,341,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1032082,  Location: JCT OF RTS 178 + I-81 NB (Lat: 43.811031,  Lng: -76.034483),  Route carried "on" structure: Interstate 81,  Year Built: 1959,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 4,311 (year 2019),  Truck Traffic: 20%,  Average Future Daily Traffic: 5,134 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 178
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.315,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $824,000,  Roadway Improvement Cost: $482,000,  Total Project Cost: $1,306,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 107362,  Location: 0.1 MI E OF SR178 & I-81 (Lat: 43.811558,  Lng: -76.031758),  Route carried "on" structure: Ramp State highway ,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 650 (year 2016),  Truck Traffic: 38%,  Average Future Daily Traffic: 774 (year 2040),  Features Intersected: BROWN BROOK,  Facility Carried by Structure: I-81 NB ramps to N
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.113,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.7m (58.1ft),  Skew: 24 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.7m (8.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $248,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $393,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 109488,  Location: 2.5 MI S JCT SH 178 & I81 (Lat: 43.777247,  Lng: -76.042878),  Route carried "on" structure: County highway ,  Year Built: 1961,  Status: Open,  Structure Length: 4.15m (13.62ft),  Average Daily Traffic: 296 (year 2015),  Truck Traffic: 8%,  Average Future Daily Traffic: 414 (year 2035),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: COUNTY ROAD 85
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.645,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.14m (13.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $842,000,  Roadway Improvement Cost: $493,000,  Total Project Cost: $1,334,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 109489,  Location: 1.4 MI S JCT RTS 178+J-81 (Lat: 43.793708,  Lng: -76.040692),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 137 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 192 (year 2037),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: IKEY'S XING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.961,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $884,000,  Roadway Improvement Cost: $518,000,  Total Project Cost: $1,402,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 221996,  Location: 1 MI E OF ADAMS VILLAGE (Lat: 43.809014,  Lng: -75.996219),  Route carried "on" structure: Other road ,  Year Built: 2004,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 165 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 231 (year 2037),  Design Load: HS 25 or greater,  Features Intersected: MIKEN BROOK,  Facility Carried by Structure: LAWRENCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.078,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.0m (19.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 76.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.64m (2.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $125,000,  Roadway Improvement Cost: $73,000,  Total Project Cost: $198,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 333866,  Location: 2 MILES WEST OF ADAMS (Lat: 43.813142,  Lng: -76.074683),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 406 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 568 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: LIBERTY STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $408,000,  Total Project Cost: $1,104,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 333867,  Location: 0.2 MI.N.OF ADAMS (Lat: 43.807278,  Lng: -76.019467),  Route carried "on" structure: Other road ,  Year Built: 1942,  Year Reconstructed: 1998,  Status: Open,  Structure Length: 5.79m (19.00ft),  Average Daily Traffic: 475 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 665 (year 2037),  Features Intersected: SANDY CREEK,  Facility Carried by Structure: SOUTH PARK STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.0m,  Curb-To-Curb Width: 6.5m (21.3ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 5.79m (19.00ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Critical Feature Inspection Date: October 2020,  Bridge Improvement Cost: $3,119,000,  Roadway Improvement Cost: $1,827,000,  Total Project Cost: $4,946,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 333868,  Location: 1 MILE NORTH OF ADAMS (Lat: 43.815875,  Lng: -75.994975),  Route carried "on" structure: County highway ,  Year Built: 2010,  Status: Open,  Structure Length: 5.18m (16.99ft),  Average Daily Traffic: 858 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,201 (year 2039),  Design Load: HL 93,  Features Intersected: SANDY CREEK,  Facility Carried by Structure: Co Rd 69
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 50.0m (164.0ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 57.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.18m (16.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,123,000,  Roadway Improvement Cost: $657,000,  Total Project Cost: $1,780,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103204,  Location: 2.5 MI S JCT 178 + I-81 (Lat: 43.777106,  Lng: -76.044344),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: COUNTY ROAD 85
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 12.550,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 103205,  Location: 1.4 MI S JCT 178 + I-81 (Lat: 43.793236,  Lng: -76.041986),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: IKEY'S XING ROAD
Minimum Vertical Clearance: 4.97m (16.31ft),  Kilometerpoint: 14.320,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 1032061,  Location: .3 MI S JCT SH 178 & I81 (Lat: 43.807922,  Lng: -76.036469),  Route carried "under" structure: County highway ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 252 (year 2007),  Features Intersected: LIBERTY STREET CR-84 -W,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1032062,  Location: .3 MI S JCT SH 178 & I81 (Lat: 43.807914,  Lng: -76.035972),  Route carried "under" structure: County highway ,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 252 (year 2007),  Features Intersected: LIBERTY STREET CR-84_WB,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1032081,  Location: JCT OF RTS 178 + I-81 SB (Lat: 43.811144,  Lng: -76.034917),  Route carried "under" structure: State highway 178,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 1990),  Features Intersected: RTE 178,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 17.635,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 1032082,  Location: JCT OF RTS 178 + I-81 NB (Lat: 43.811031,  Lng: -76.034483),  Route carried "under" structure: State highway 178,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 3,500 (year 1990),  Features Intersected: RTE 178,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.80m (15.75ft),  Kilometerpoint: 17.651,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: 109488,  Location: 2.5 MI S JCT SH 178 & I81 (Lat: 43.777247,  Lng: -76.042878),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: COUNTY ROAD 85
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 12.389,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 109489,  Location: 1.4 MI S JCT RTS 178+J-81 (Lat: 43.793708,  Lng: -76.040692),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,265 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: IKEY'S XING ROAD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 17.522,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.5m (50.9ft)

Find on map >>   Show street view

Structure Number: 70394,  Location: .6 MILE E JCT SH178 & I81 (Lat: 43.810006,  Lng: -76.028597),  Route carried "under" structure: State highway 178,  Year Built: 1940,  Structure Length: 0. m,  Average Daily Traffic: 3,150 (year 1979),  Features Intersected: RTE 178,  Facility Carried by Structure: CSX TRANSPRTATION
Minimum Vertical Clearance: 4.26m (13.98ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 10.3m (33.8ft)

Find on map >>   Show street view

Structure Number: 771576,  Location: .25 MI W JCT RT11 & CR84 (Lat: 43.808700,  Lng: -76.029469),  Route carried "under" structure: County highway ,  Year Built: 1940,  Structure Length: 0. m,  Features Intersected: Liberty Street,  Facility Carried by Structure: CSX Transportation
Minimum Vertical Clearance: 3.43m (11.25ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 6.4m (21.0ft)

Discuss Adams, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.