Jump to a detailed profile or search site with Google Custom Search

Massena International-Richards Field Airport (MSS) in Massena, New York
Information about Operating and Financial Summary, Runways, Icidents


  • Massena International-Richards Field Airport (MSS)
  • No street view available for this location
  • See Google Street View
Massena, NY forum
Discuss Massena, New York airports on our local forum with over 2,400,000 registered users

Latest news about airports in Massena, NY collected exclusively by city-data.com from local newspapers, TV, and radio stations


Historical Enplanements - Massena International-Richards Field Airport

Historical Itinerant Operations - Massena International-Richards Field Airport

Historical Local Operations - Massena International-Richards Field Airport

Historical Revenue ($000) - Massena International-Richards Field Airport

Historical Expenses ($000) - Massena International-Richards Field Airport

Massena International-Richards Field Airport (MSS)

  • General
  • Type: Airport, Status: Operational, Acivation Date: 04/01/1940, Runways: 2, Land Area Covered By Airport: 752 acres, Ownership: Publicly owned, Facility Use: Open to public, Site Number: 15647.*A, Location ID: MSS, Region: Eastern, District Office: NYC, Unicom Frequency: 123.000 MHz, Common Traffic Advisory Frequency (CTAF): 123.000 MHz, Aeronautical sectional chart: Montreal, Tie-In FSS: No, Tie-In FSS ID: BTV, Tie-In FSS Name: Burlington, Tie-In FSS Toll-Free Number: 1-800-WX-BRIEF, Elevation: 221 ft, Elevation determination method: Surveyed, Elevation Source: NGS (2001-08-31), Air traffic control tower: No, Boundary ARTCC (FAA) computer ID: ZCB, Boundary ARTCC ID: ZBW, Boundary ARTCC Name: Boston, Airspace Determination: Not Analyzed, Certification Type & Date: II A S 01/1976, Federal Agreements: NGY3, NOTAM Service: Yes, NOTAM Facility ID: MSS, Last Inspection Date: 05/20/2015, Inspection Group: FAA airports field personnel, Inspection Method: Federal
  • Location
  • State: New York, County: St Lawrence, City: Massena, GPS (Degrees): Lat: 44° 56' 10.471'', Lng: -74° 50' 42.429'', GPS (Seconds): Lat: 44.936242, Lng: -74.845119, GPS determination method: Estimated, Position Source: FAA-EST (2012-04-27), Distance from central business district: 2 mi (E) Find on map
  • Owner
  • Town Of Massena, Main St - Town Hall, Massena, Ny 13662, 315-769-3588
  • Manager
  • Frank Diagostino, 90 Aviation Road, Massena, Ny 13662, 315-769-7605
  • Operations
  • Period: 05/20/2014 - 05/20/2015, Commercial Operations: 1, Air Taxi Operations: 2,190, Itinerant Operations: 4,600, Local Operations: 1,500, Military Operations: 900
  • Aircraft
  • Single Engine Aircraft: 7, Multi Engine Aircraft: 2
  • Additional
  • Fuel Types: 100LLA, Magnetic Variation: 14W (Year 1980), Beacon Color: Clear-green (lighted land airport), Lighting Schedule: See Rmk, Beacon Schedule: Ss-Sr, Airframe repair service availability/type: Minor, Customs Airport Of Entry: Yes, Customs Landing Rights: No, Military/civil joint use agreement: No, Military Landing Rights: Yes, Non-Commercial Landing Fee: No, Transient storage: HGR,TIE, Wind direction indicator: Y-L, Segmented circle airport marker system: No, Other services: AFRT, CARGO, CHTR
  • Remarks
  • Airspace Determination: FILED FOR RECORD PURPOSES ONLY.

Runway 1

  • Base End
  • Base End ID: 05, True Alignment: 31, Instrument Landing System (ILS) Type: Instrument landing system, Right Traffic Pattern: No, Runway Markings Type: Precision instrument, Markings Condition: Good, Physical GPS (Degrees): Lat: 44° 55' 48.102'', Lng: -74° 50' 57.827'', Physical GPS (Seconds): Lat: 44.930028, Lng: -74.849396, Physical Elevation: 203 ft, Threshold Crossing Height: 58.0 ft, Glide Path Angle: 0.03 °, Elevation At Touchdown Zone: 204.8 ft, Visual Glide Slope Indicators: P4L, Runway End Identifier Lights (REIL): Yes, Controlling Object Description: TREE, FAA FAR Part 77 Category: PIR, Object Clear Slope: 17, Object Height: 45 ft, Object Distance From Runway: 1000.0 ft, Object Offset From Runway: 540R ft, Runway End Gradient: 0.3 (Up), Take-Off Run Available: 5,600 ft, Take-Off Distance Available: 5,600 ft, Actual Stop Distance Available: 5,600 ft, Landing Distance Available: 5,600 ft, Position Source: NGS (08/28/2006), Elevation Source: NGS (08/31/2001), Touchdown Zone Elevation Source: FAA (09/28/2006)
  • Reciprocal End
  • Reciprocal End ID: 23, True Alignment: 211, Right Traffic Pattern: No, Runway Markings Type: Non-precision instrument, Markings Condition: Good, Physical GPS (Degrees): Lat: 44° 56' 35.393'', Lng: -74° 50' 17.470'', Physical GPS (Seconds): Lat: 44.943165, Lng: -74.838186, Physical Elevation: 222 ft, Threshold Crossing Height: 43.0 ft, Glide Path Angle: 0.03 °, Elevation At Touchdown Zone: 221.5 ft, Visual Glide Slope Indicators: P4L, FAA FAR Part 77 Category: Other than utility, Object Clear Slope: 50, Runway End Gradient: 0.3 (Down), Take-Off Run Available: 5,600 ft, Take-Off Distance Available: 5,600 ft, Actual Stop Distance Available: 5,600 ft, Landing Distance Available: 5,600 ft, Position Source: NGS (08/28/2006), Elevation Source: FAA (04/02/2007), Touchdown Zone Elevation Source: AVN (08/23/2012)

Runway 2

  • Base End
  • Base End ID: 09, True Alignment: 76, Right Traffic Pattern: No, Runway Markings Type: Non-precision instrument, Markings Condition: Good, Physical GPS (Degrees): Lat: 44° 56' 03.979'', Lng: -74° 51' 16.119'', Physical GPS (Seconds): Lat: 44.934439, Lng: -74.854478, Physical Elevation: 203 ft, Elevation At Touchdown Zone: 204.6 ft, Controlling Object Description: TREES, FAA FAR Part 77 Category: Other than utility, Object Clear Slope: 14, Object Height: 53 ft, Object Distance From Runway: 990.0 ft, Object Offset From Runway: 280L ft, Runway End Gradient: 0.0, Take-Off Run Available: 4,000 ft, Take-Off Distance Available: 4,000 ft, Actual Stop Distance Available: 3,880 ft, Landing Distance Available: 3,880 ft, Position Source: NGS (08/31/2001), Elevation Source: NGS (08/31/2001), Touchdown Zone Elevation Source: NGS (08/31/2001)
  • Reciprocal End
  • Reciprocal End ID: 27, True Alignment: 256, Right Traffic Pattern: No, Runway Markings Type: Non-precision instrument, Markings Condition: Good, Physical GPS (Degrees): Lat: 44° 56' 13.376'', Lng: -74° 50' 22.108'', Physical GPS (Seconds): Lat: 44.937049, Lng: -74.839475, Physical Elevation: 204 ft, Threshold Crossing Height: 35.0 ft, Glide Path Angle: 0.03 °, Elevation At Touchdown Zone: 204.6 ft, Visual Glide Slope Indicators: P4L, Runway End Identifier Lights (REIL): Yes, Controlling Object Description: TREES, FAA FAR Part 77 Category: Other than utility, Object Clear Slope: 23, Object Height: 135 ft, Object Distance From Runway: 3375.0 ft, Object Offset From Runway: 0B ft, Runway End Gradient: 0.0, Take-Off Run Available: 4,000 ft, Take-Off Distance Available: 4,000 ft, Actual Stop Distance Available: 4,000 ft, Landing Distance Available: 4,000 ft, Position Source: NGS (08/31/2001), Elevation Source: NGS (08/31/2001), Touchdown Zone Elevation Source: NGS (08/31/2001)

2014 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Passenger airline landing fees: $50,250, Terminal arrival fees, rents, and utilities: $36,411, Total: $86,661
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $39,083, Fuel sales net profit / loss or fuel flowage fees: $76,097, Total: $115,180
  • Operating Expenses
  • Personnel compensation and benefits: $300,462, Communications and utilities: $61,546, Supplies and materials: $31,061, Contractual services: $15,428, Insurance, claims, and settlements: $12,050, Other: $19,721, Total: $440,268
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $36, Interest expense: $-5,593, Grant receipts: $4,616,654, Passenger Facility Charges: $789, Capital Contributions: $115,216, Total: $4,727,102
  • Net Assets
  • Change in net assets: $4,488,675, Net assets (deficit) at beginning of year: $174,451, Net assets (deficit) at end of year: $133,754
  • Capital Expenditures and Construction in Progress
  • Airfield: $4,169,530, Other: $768,772, Total: $4,938,302
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $251,000, Total: $251,000
  • Externally Restricted Assets
  • Other: $133,754, Total: $133,754
  • Debt Service
  • Debt service, excluding coverage: $30,593

2013 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Passenger airline landing fees: $38,400, Terminal arrival fees, rents, and utilities: $36,410, Total: $74,810
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $34,245, Fuel sales net profit / loss or fuel flowage fees: $51,518, Security reimbursement from Federal Government: $5,946, Total: $91,709
  • Operating Expenses
  • Personnel compensation and benefits: $261,619, Communications and utilities: $53,583, Supplies and materials: $36,276, Contractual services: $23,138, Insurance, claims, and settlements: $12,820, Other: $13,467, Total: $400,903
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $41, Interest expense: $-9,313, Grant receipts: $492,949, Passenger Facility Charges: $820, Capital Contributions: $3,873, Total: $488,370
  • Net Assets
  • Change in net assets: $253,986, Net assets (deficit) at beginning of year: $147,036, Net assets (deficit) at end of year: $174,451
  • Capital Expenditures and Construction in Progress
  • Airfield: $72,465, Roadways, rail and transit: $31,575, Other: $380,970, Total: $485,010
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $276,000, Total: $276,000
  • Externally Restricted Assets
  • Other: $174,451, Total: $174,451
  • Debt Service
  • Debt service, excluding coverage: $68,212

2012 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Terminal arrival fees, rents, and utilities: $29,227, Total: $29,227
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $35,695, Fuel sales net profit / loss or fuel flowage fees: $91,600, Security reimbursement from Federal Government: $17,380, Total: $144,675
  • Operating Expenses
  • Personnel compensation and benefits: $238,538, Communications and utilities: $46,236, Supplies and materials: $31,103, Contractual services: $71,896, Insurance, claims, and settlements: $10,995, Other: $6,601, Total: $405,369
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $77, Interest expense: $-16,986, Grant receipts: $923,774, Passenger Facility Charges: $826, Capital Contributions: $154,975, Total: $1,062,666
  • Net Assets
  • Change in net assets: $831,199, Net assets (deficit) at beginning of year: $45,007, Net assets (deficit) at end of year: $147,036
  • Capital Expenditures and Construction in Progress
  • Airfield: $49,103, Roadways, rail and transit: $470,446, Other: $469,835, Total: $989,384
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $323,899, Total: $323,899
  • Externally Restricted Assets
  • Other: $147,036, Total: $147,036
  • Debt Service
  • Debt service, excluding coverage: $70,587

2011 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Terminal arrival fees, rents, and utilities: $29,263, Total: $29,263
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $32,950, Fuel sales net profit / loss or fuel flowage fees: $36,034, Security reimbursement from Federal Government: $28,534, Other: $8,500, Total: $106,018
  • Operating Expenses
  • Personnel compensation and benefits: $221,223, Communications and utilities: $41,386, Supplies and materials: $21,618, Contractual services: $33,058, Insurance, claims, and settlements: $10,995, Other: $68,292, Total: $396,572
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $86, Interest expense: $-19,958, Grant receipts: $1,652,313, Passenger Facility Charges: $1,247, Capital Contributions: $368,692, Total: $2,002,380
  • Net Assets
  • Change in net assets: $1,741,089, Net assets (deficit) at beginning of year: $534,438, Net assets (deficit) at end of year: $45,007
  • Capital Expenditures and Construction in Progress
  • Airfield: $89,407, Other: $1,601,229, Total: $1,690,636
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $377,499, Total: $377,499
  • Externally Restricted Assets
  • Other: $45,007, Total: $45,007
  • Debt Service
  • Debt service, excluding coverage: $70,412

2010 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Terminal arrival fees, rents, and utilities: $27,042, Total: $27,042
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $28,810, Fuel sales net profit / loss or fuel flowage fees: $92,198, Security reimbursement from Federal Government: $75,745, Other: $8,500, Total: $205,253
  • Operating Expenses
  • Personnel compensation and benefits: $211,575, Communications and utilities: $55,919, Supplies and materials: $27,105, Contractual services: $156,788, Insurance, claims, and settlements: $10,995, Other: $10,408, Total: $472,790
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $163, Interest expense: $-22,748, Grant receipts: $489,110, Passenger Facility Charges: $842, Capital Contributions: $307,566, Total: $774,933
  • Net Assets
  • Change in net assets: $534,438, Net assets (deficit) at end of year: $534,438
  • Capital Expenditures and Construction in Progress
  • Airfield: $96,538, Other: $390,453, Total: $486,991
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $427,952, Total: $427,952
  • Externally Restricted Assets
  • Other: $42,095, Total: $42,095
  • Debt Service
  • Debt service, excluding coverage: $70,195, Debt service, net of PFCs and Offsets: $70,195

2009 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Terminal arrival fees, rents, and utilities: $27,042, Total: $27,042
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $27,840, Fuel sales net profit / loss or fuel flowage fees: $51,787, Security reimbursement from Federal Government: $75,745, Other: $8,500, Total: $163,872
  • Operating Expenses
  • Personnel compensation and benefits: $248,148, Communications and utilities: $52,530, Supplies and materials: $15,938, Contractual services: $82,426, Insurance, claims, and settlements: $11,400, Other: $6,347, Total: $416,789
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $272, Interest expense: $-20,104, Grant receipts: $874,417, Passenger Facility Charges: $811, Capital Contributions: $330,495, Total: $1,185,891
  • Net Assets
  • Change in net assets: $960,016
  • Capital Expenditures and Construction in Progress
  • Airfield: $697,979, Terminal: $150,208, Other: $60,954, Total: $909,141
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $3,616,400, Total: $3,616,400
  • Externally Restricted Assets
  • Other: $58,472, Total: $58,472
  • Debt Service
  • Debt service, excluding coverage: $70,979

2009 Operating and Financial Summary

  • Passenger Airline Aeronautical Revenue
  • Terminal arrival fees, rents, and utilities: $27,042, Total: $27,042
  • Non-Passenger Aeronautical Revenue
  • Cargo and hangar rentals: $27,840, Fuel sales net profit / loss or fuel flowage fees: $51,787, Security reimbursement from Federal Government: $75,745, Other: $8,500, Total: $163,872
  • Operating Expenses
  • Personnel compensation and benefits: $248,148, Communications and utilities: $52,530, Supplies and materials: $15,938, Contractual services: $82,426, Insurance, claims, and settlements: $11,400, Other: $6,347, Total: $416,789
  • Non-Operating Expenses
  • Interest expense - restricted and non-restricted: $272, Interest expense: $-20,104, Grant receipts: $874,417, Passenger Facility Charges: $811, Capital Contributions: $330,495, Total: $1,185,891
  • Net Assets
  • Change in net assets: $960,016
  • Capital Expenditures and Construction in Progress
  • Airfield: $697,979, Terminal: $150,208, Other: $60,954, Total: $909,141
  • Indebtedness at End of Year
  • Long Term Bonds (GA, GARB, PFC, etc.): $3,616,400, Total: $3,616,400
  • Externally Restricted Assets
  • Other: $58,472, Total: $58,472
  • Debt Service
  • Debt service, excluding coverage: $70,979

2008 Operating and Financial Summary

  • Aeronautical Operating Revenue
  • Terminal/International arrival area rental or other charge: $12,117, Cargo and hangar rentals: $24,242, Fuel sales net proffit/loss or fuel flowage fees: $109,214, Security Reimbursement: $23,657, Total: $169,230
  • Non-Aeronautical Operating Revenue
  • Terminal - other: $8,500, Total: $8,500
  • Non-Operating Revenue
  • Interest income - restricted and non-restricted: $1,762, Grant receipts: $1,855,454, Passenger Facility Charges: $296, Total: $1,857,512
  • Operating Expenses
  • Personnel compensation and benefits: $263,197, Communications and utilities: $52,291, Supplies and materials: $41,039, Repairs and maintenance: $30,502, Contractual services: $2,804, Insurance, claims, and settlements: $11,400, Misc.: $11,475, Other: $2,220, Total: $414,928
  • Non-Operating Expenses
  • Interest expense: $15,999, Total: $15,999, Net: $1,604,315
  • Reporting Year Proceeds
  • Other: $343,432, Total: $343,432
  • Reporting Year Expenditures for Projects
  • Airfield: $1,783,444, Terminal: $94,229, Other: $52,074, Total: $1,929,747, Reporting Year Debt Payments: $18,000
  • Indebtedness at End of Year
  • Bonds: $368,000, Total: $368,000
  • Restricted Financial Assets
  • Other restricted financial assets: $64,404, Total: $64,404

2007 Operating and Financial Summary

  • Aeronautical Operating Revenue
  • Terminal/International arrival area rental or other charge: $30,099, Cargo and hangar rentals: $27,475, Fuel sales net proffit/loss or fuel flowage fees: $59,677, Security Reimbursement: $67,420, Total: $184,671
  • Non-Operating Revenue
  • Interest income - restricted and non-restricted: $4,436, Grant receipts: $1,269,616, Passenger Facility Charges: $5,992, Total: $1,280,044
  • Operating Expenses
  • Personnel compensation and benefits: $205,995, Communications and utilities: $49,562, Supplies and materials: $7,888, Repairs and maintenance: $31,610, Contractual services: $3,541, Insurance, claims, and settlements: $12,000, Misc.: $530, Other: $22,397, Total: $333,523
  • Non-Operating Expenses
  • Interest expense: $16,700, Total: $16,700, Net: $1,114,492
  • Reporting Year Proceeds
  • Other: $179,584, Total: $179,584
  • Reporting Year Expenditures for Projects
  • Airfield: $906,538, Terminal: $253,321, Other: $117,217, Total: $1,277,076, Reporting Year Debt Payments: $17,000
  • Indebtedness at End of Year
  • Bonds: $386,000, Total: $386,000
  • Restricted Financial Assets
  • Other restricted financial assets: $247,556, Total: $247,556

2006 Operating and Financial Summary

  • Aeronautical Operating Revenue
  • Terminal/International arrival area rental or other charge: $28,128, Cargo and hangar rentals: $9,000, Fuel sales net proffit/loss or fuel flowage fees: $114,489, Security Reimbursement: $59,282, Total: $210,899
  • Non-Operating Revenue
  • Grant receipts: $2,034,885, Passenger Facility Charges: $7,477, Total: $2,042,362
  • Operating Expenses
  • Personnel compensation and benefits: $213,358, Communications and utilities: $55,382, Supplies and materials: $14,930, Repairs and maintenance: $13,832, Contractual services: $65,578, Insurance, claims, and settlements: $12,000, Total: $375,080
  • Non-Operating Expenses
  • Interest expense: $17,360, Total: $17,360, Net: $1,860,821
  • Reporting Year Proceeds
  • Other contributed capital: $73,311, Total: $73,311
  • Reporting Year Expenditures for Projects
  • Airfield: $1,496,096, Terminal: $83,115, Other: $583,125, Total: $2,162,336, Reporting Year Debt Payments: $16,000
  • Indebtedness at End of Year
  • Bonds: $403,000, Total: $403,000
  • Restricted Financial Assets
  • Other restricted financial assets: $137,050, Total: $137,050, Unrestricted Financial Assets including cash: $137,050

2005 Operating and Financial Summary

  • Aeronautical Operating Revenue
  • Terminal/International arrival area rental or other charge: $29,221, Cargo and hangar rentals: $9,000, Fuel sales net proffit/loss or fuel flowage fees: $85,250, Security Reimbursement: $64,594, Total: $188,065
  • Non-Operating Revenue
  • Grant receipts: $1,786,642, Passenger Facility Charges: $9,929, Total: $1,796,571
  • Operating Expenses
  • Personnel compensation and benefits: $207,856, Communications and utilities: $60,137, Supplies and materials: $11,261, Repairs and maintenance: $24,246, Contractual services: $101,554, Insurance, claims, and settlements: $12,000, Misc.: $6,027, Other: $4,031, Total: $427,112
  • Non-Operating Expenses
  • Interest expense: $18,020, Total: $18,020, Net: $1,539,504
  • Reporting Year Proceeds
  • Other contributed capital: $433,836, Total: $433,836
  • Reporting Year Expenditures for Projects
  • Airfield: $1,838,329, Terminal: $21,863, Other: $97,148, Total: $1,957,340, Reporting Year Debt Payments: $16,000
  • Indebtedness at End of Year
  • Bonds: $419,000, Total: $419,000
  • Restricted Financial Assets
  • Other restricted financial assets: $159,489, Total: $159,489

2004 Operating and Financial Summary

    2003 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $17,894, Cargo and hangar rentals: $10,416, Fuel sales net proffit/loss or fuel flowage fees: $185,230, Other: $57,005, Total: $270,545
    • Non-Aeronautical Operating Revenue
    • Misc.: $1,009, Other: $230,521, Total: $231,530
    • Non-Operating Revenue
    • Grant receipts: $1,646,968, Passenger Facility Charges: $7,225, Total: $1,654,193
    • Operating Expenses
    • Personnel compensation and benefits: $141,866, Communications and utilities: $21,704, Supplies and materials: $114,100, Contractual services: $57,005, Insurance, claims, and settlements: $8,662, Total: $343,337
    • Non-Operating Expenses
    • Other: $1,812,931, Total: $1,812,931

    2002 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $18,457, Cargo and hangar rentals: $24,162, Fuel sales net proffit/loss or fuel flowage fees: $127,757, Misc.: $38,285, Total: $208,661
    • Non-Aeronautical Operating Revenue
    • Misc.: $1,225, Other: $112,423, Total: $113,648
    • Non-Operating Revenue
    • Interest income - restricted and non-restricted: $1,225, Grant receipts: $269,044, Passenger Facility Charges: $6,590, Other: $111,198, Total: $388,057
    • Operating Expenses
    • Personnel compensation and benefits: $153,207, Communications and utilities: $20,670, Supplies and materials: $128,253, Repairs and maintenance: $38,285, Contractual services: $8,662, Total: $349,077
    • Non-Operating Expenses
    • Net: $361,289
    • Reporting Year Expenditures for Projects
    • Other: $247,635, Total: $247,635

    2001 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $14,570, Cargo and hangar rentals: $19,915, Fuel sales net proffit/loss or fuel flowage fees: $175,951, Total: $210,436
    • Non-Aeronautical Operating Revenue
    • Other: $264,188, Total: $264,188
    • Non-Operating Revenue
    • Grant receipts: $1,667,997, Passenger Facility Charges: $8,852, Total: $1,676,849
    • Operating Expenses
    • Personnel compensation and benefits: $135,790, Communications and utilities: $18,756, Supplies and materials: $53,546, Insurance, claims, and settlements: $7,817, Other: $114,783, Total: $330,692
    • Non-Operating Expenses
    • Net: $1,820,781
    • Reporting Year Proceeds
    • Other: $1,820,841, Total: $1,820,841
    • Restricted Financial Assets
    • Unrestricted Financial Assets including cash: $102,139

    2000 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $18,173, Cargo and hangar rentals: $9,069, Other: $157,540, Total: $184,782
    • Non-Aeronautical Operating Revenue
    • Other: $243,455, Total: $243,455
    • Non-Operating Revenue
    • Interest income - restricted and non-restricted: $5,050, Grant receipts: $1,677,011, Passenger Facility Charges: $9,801, Total: $1,691,862
    • Operating Expenses
    • Personnel compensation and benefits: $96,853, Communications and utilities: $16,952, Supplies and materials: $61,763, Insurance, claims, and settlements: $7,817, Other: $89,133, Total: $272,518
    • Non-Operating Expenses
    • Net: $1,847,581
    • Reporting Year Proceeds
    • Other: $1,847,581, Total: $1,847,581

    1999 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $18,173, Cargo and hangar rentals: $9,000, Other: $153,005, Total: $180,178
    • Non-Aeronautical Operating Revenue
    • Other: $128,612, Total: $128,612
    • Non-Operating Revenue
    • Interest income - restricted and non-restricted: $7,650, Grant receipts: $137,297, Passenger Facility Charges: $11,789, Total: $156,736
    • Operating Expenses
    • Personnel compensation and benefits: $162,685, Communications and utilities: $16,800, Supplies and materials: $56,205, Insurance, claims, and settlements: $8,000, Other: $79,597, Total: $323,287
    • Non-Operating Expenses
    • Net: $142,239
    • Reporting Year Proceeds
    • Other: $140,800, Total: $140,800
    • Reporting Year Expenditures for Projects
    • Reporting Year Debt Payments: $1,439

    1998 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $18,173, Cargo and hangar rentals: $8,099, Other: $188,362, Total: $214,634
    • Non-Aeronautical Operating Revenue
    • Misc.: $318, Other: $38,890, Total: $39,208
    • Non-Operating Revenue
    • Interest income - restricted and non-restricted: $5,999, Grant receipts: $786,683, Passenger Facility Charges: $12,553, Total: $805,235
    • Operating Expenses
    • Personnel compensation and benefits: $105,550, Communications and utilities: $16,031, Supplies and materials: $33,750, Insurance, claims, and settlements: $9,400, Other: $81,797, Total: $246,528
    • Non-Operating Expenses
    • Net: $812,549
    • Reporting Year Proceeds
    • Bond Proceeds: $300,000, Other: $680,803, Total: $980,803
    • Reporting Year Expenditures for Projects
    • Reporting Year Debt Payments: $159,903

    1997 Operating and Financial Summary

    • Aeronautical Operating Revenue
    • Terminal/International arrival area rental or other charge: $20,207, Apron charges/tiedowns: $100, Cargo and hangar rentals: $14,058, Misc.: $7,063, Other: $153,212, Total: $194,640
    • Non-Aeronautical Operating Revenue
    • Terminal - food and beverage: $100, Other: $181,829, Total: $181,929
    • Non-Operating Revenue
    • Grant receipts: $381,653, Passenger Facility Charges: $7,126, Total: $388,779
    • Operating Expenses
    • Personnel compensation and benefits: $123,058, Communications and utilities: $15,564, Supplies and materials: $56,487, Insurance, claims, and settlements: $11,250, Other: $101,156, Total: $307,515
    • Non-Operating Expenses
    • Other: $11,966, Total: $11,966, Net: $445,867
    • Reporting Year Proceeds
    • Other: $396,047, Total: $396,047
    • Reporting Year Expenditures for Projects
    • Reporting Year Debt Payments: $50,000

    National Wildlife Strike Incidents

    2014-09-03
    Time: Day (07:10), Sky: No Cloud, Precipation: None, Operator: Cape Air, Aircraft: C-402 (Airplane), Mass: 2251 - 5700 kg, Engines: 2, Power Type: Reciprocating engine (piston), Registration: N26156, Flight: 1820, Remains Collected: Yes, Remains Sent: No, Runway: 5/23, Speed: 85 knots, Phase of Flight: Take-off run, Birds Seen: 2-10, Birds Struck: 1, Species: Canada goose, Size: Large, Pilot warned of birds/wildlife: No, Strikes/Damages: Struck windshield, Effect On Flight: Aborted Take-off, Report Type: FAA Form 5200-7-E
    Remarks: USGS BAND # 113825271
    2000-09-12
    Time: Day (13:20), Sky: Some Cloud, Precipation: None, Operator: Privately Owned, Aircraft: PA-32 (Airplane), Mass: <= 2,250 kg, Engines: 1, Power Type: Reciprocating engine (piston), Registration: C-GBWW, Remains Collected: No, Runway: 23, Above Ground: 100 ft, Phase of Flight: Approach, Birds Seen: 2-10, Birds Struck: 1, Species: Canada goose, Size: Large, Damage: Minor, Strikes/Damages: Struck & Damaged Wing or Rotor, Effect On Flight: Other, Report Type: Airport Report
    Remarks: FLOCK OF GEESE TOOK OF WHILE A/C WAS ON SHORT FINAL. HIT 1 WHILE TRYING TO CLIMB OVER THE BIRDS. DAMAGED L WING LE AND TOP OF WING.
    2000-09-11
    Time: Day (12:45), Sky: Overcast, Precipation: Rain, Operator: Business, Aircraft: LEARJET-31 (Airplane), Mass: 2251 - 5700 kg, Engines: 2, Power Type: Turbofan, Registration: N122FX, Remains Collected: No, Runway: 5, Phase of Flight: Landing Roll, Birds Seen: 2-10, Birds Struck: 2-10, Species: Canada goose, Size: Large, Damage: Uncertain Level, Strikes/Damages: Struck & Damaged Wing or Rotor, Struck & Damaged Landing Gear, Report Type: Airport Report
    Comments: OPER = BOMBARDIER AEROSPACE CORP
    Remarks: FOG DRIZZLE, RAIN. VIZ ABOUT 1 MI. WHEN THEY BROKE OUT OF CLOUDS, SAW NUMEROUS GULLS WHICH FLEW AWAY. DID NOT SEE GEESE UNTIL IT WAS TOO LATE FOR A GO AROUND. STRUCTURAL DMG TO L FLAP AND RT GEAR DOOR.
    1991-09-15
    Time: Day, Sky: Overcast, Precipation: Fog, Operator: Chautauqua Airlines, Aircraft: SA227 AC METRO III (Airplane), Mass: 2251 - 5700 kg, Engines: 2, Power Type: Turboprop, Remains Collected: No, Speed: 80 knots, Phase of Flight: Landing Roll, Birds Seen: 2-10, Birds Struck: 2-10, Species: Gulls, Size: Medium, Pilot warned of birds/wildlife: No, Damage: Substantial, Strikes/Damages: Struck & Damaged Propeller, Report Type: FAA Form 5200-7
    Remarks: BENT PROP BLADE HAD TO BE REPLACED.

    Review, comment, or add new information about this topic:

    Discuss Massena, New York (NY) on our hugely popular New York forum.


    City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
    Some parts © 2024 Advameg, Inc.

    Table of Contents