Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Winter Garden, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 39Number of bridges
  • 541ft / 165mTotal length
  • 1,022,202Total average daily traffic
  • 130,789Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Winter Garden
  • No street view available for this location

New bridges in Winter Garden, FL - historical statistics
  • New bridges - historical statistics
  • 352000-2009
  • 42010-2019
Average Bridge Daily Traffic in Winter Garden, FL
Average Bridge Truck Traffic in Winter Garden, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 28.6%Very good
  • 71.4%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 71.4%Very good
  • 28.6%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Very good
  • 50.0%Good
  • 7.1%Satisfactory
Find on map >>   Show street view

Structure Number: 750406,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.559889),  Route carried "on" structure: State highway 429,  Year Built: 2000,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 36,750 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 63,761 (year 2042),  Design Load: HS 20,  Features Intersected: Story Road & Access Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.660,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 16.8m (55.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750407,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.559556),  Route carried "on" structure: State highway 429,  Year Built: 2000,  Status: Open,  Structure Length: 3.50m (11.48ft),  Average Daily Traffic: 36,750 (year 2020),  Truck Traffic: 11%,  Average Future Daily Traffic: 63,761 (year 2042),  Design Load: HS 20,  Features Intersected: Story Road & Access Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.657,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.4m (112.9ft),  Curb-To-Curb Width: 23.4m (76.8ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750408,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.560047),  Route carried "on" structure: Ramp State highway 429,  Year Built: 2000,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 4,300 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,460 (year 2042),  Design Load: HS 20,  Features Intersected: Story Road & Access Rd.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.180,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.5m (113.2ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750535,  Location: 4.3 Mi. South of Turnpike (Lat: 28.512028,  Lng: -81.605528),  Route carried "on" structure: State highway 429,  Year Built: 2005,  Status: Open,  Structure Length: 2.88m (9.45ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,772 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: Stoneybrook West Pkwy.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.496,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.2m (92.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750536,  Location: 4.3 Mi. South of Turnpike (Lat: 28.511944,  Lng: -81.605194),  Route carried "on" structure: State highway 429,  Year Built: 2005,  Status: Open,  Structure Length: 2.91m (9.55ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,772 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: Stoneybrook West Pkwy.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.518,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.5m (93.5ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Inventory Rating: 55.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750537,  Location: 3 Mi. South of Turnpike (Lat: 28.517778,  Lng: -81.586028),  Route carried "on" structure: State highway 429,  Year Built: 2005,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,772 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CR-535
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.532,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.6m (162.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750538,  Location: 3 Mi. South of Turnpike (Lat: 28.517556,  Lng: -81.585903),  Route carried "on" structure: State highway 429,  Year Built: 2005,  Status: Open,  Structure Length: 5.02m (16.47ft),  Average Daily Traffic: 23,500 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 40,772 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: CR-535
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.532,  Lanes on structure: 2,  Lanes under structure: 9,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 49.6m (162.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750549,  Location: SR-429-SR-50 (Lat: 28.551417,  Lng: -81.558853),  Route carried "on" structure: State highway 429,  Year Built: 2002,  Status: Open,  Structure Length: 5.45m (17.88ft),  Average Daily Traffic: 25,500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 44,242 (year 2042),  Design Load: HS 20,  Features Intersected: SR-50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.851,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.9m (176.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 75055,  Location: SR-429-SR-50 (Lat: 28.551417,  Lng: -81.558558),  Route carried "on" structure: State highway 429,  Year Built: 2002,  Status: Open,  Structure Length: 5.45m (17.88ft),  Average Daily Traffic: 25,500 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 44,242 (year 2042),  Design Load: HS 20,  Features Intersected: SR-50
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 47.846,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 53.9m (176.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750551,  Location: 0.2 MI W OF SR 50 (Lat: 28.547928,  Lng: -81.558342),  Route carried "on" structure: Ramp State highway 91,  Year Built: 2002,  Status: Open,  Structure Length: 61.45m (201.61ft),  Average Daily Traffic: 9,400 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 16,309 (year 2042),  Design Load: HS 20,  Features Intersected: SR 429/SR 91 TPK,  Facility Carried by Structure: RAMP I 268.3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.068,  Lanes on structure: 1,  Lanes under structure: 18,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 12,  Length of Maximum Span: 62.1m (203.7ft),  Curb-To-Curb Width: 9.4m (30.8ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750605,  Location: 1.5 MILES S OF SR 438 (Lat: 28.549589,  Lng: -81.558933),  Route carried "on" structure: Ramp State highway 429,  Year Built: 2001,  Status: Open,  Structure Length: 5.21m (17.09ft),  Average Daily Traffic: 10,500 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 18,218 (year 2042),  Design Load: HS 20,  Features Intersected: RAMP M
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 14.2m (46.6ft),  Skew: 7 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 52.1m (170.9ft),  Curb-To-Curb Width: 14.2m (46.6ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "on" structure: Ramp State highway 91,  Year Built: 2001,  Status: Open,  Structure Length: 52.73m (173.00ft),  Average Daily Traffic: 4,400 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 7,634 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SR 91 TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.475,  Lanes on structure: 1,  Lanes under structure: 17,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 10,  Length of Maximum Span: 59.7m (195.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750634,  Location: 9.2 MI N OF I-4 (Lat: 28.545267,  Lng: -81.569956),  Route carried "on" structure: State highway 91,  Year Built: 2010,  Status: Open,  Structure Length: 2.40m (7.87ft),  Average Daily Traffic: 94,000 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 163,090 (year 2042),  Design Load: HL 93,  Features Intersected: BEULAH ROAD
Minimum Vertical Clearance: 30.45m (99.90ft),  Kilometerpoint: 31.405,  Lanes on structure: 8,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 42.7m (140.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.0m (78.7ft),  Curb-To-Curb Width: 42.7m (140.1ft),  Out-to-Out Width: 44.2m (145.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750635,  Location: 0.4 MI S OF SR 50 (Lat: 28.545178,  Lng: -81.587706),  Route carried "on" structure: County highway 535,  Year Built: 2010,  Status: Open,  Structure Length: 6.46m (21.19ft),  Average Daily Traffic: 36,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 62,460 (year 2042),  Design Load: HL 93,  Features Intersected: SR 91 TPK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.592,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Toll Authority,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 32.3m (106.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 46.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 750406,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.559889),  Route carried "under" structure: ServiceCity street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 101 (year 2020),  Truck Traffic: 10%,  Features Intersected: Story Road & Access Rd.,  Facility Carried by Structure: SR-429 SB
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 750406,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.559889),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 7%,  Features Intersected: Story Road & Access Rd.,  Facility Carried by Structure: SR-429 SB
Minimum Vertical Clearance: 6.68m (21.92ft),  Kilometerpoint: 4.305,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 750407,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.559556),  Route carried "under" structure: ServiceCity street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 4,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: Story Road & Access Rd.,  Facility Carried by Structure: SR-429 NB
Minimum Vertical Clearance: 6.49m (21.29ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 750407,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.559556),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 4,500 (year 2020),  Truck Traffic: 7%,  Features Intersected: Story Road & Access Rd.,  Facility Carried by Structure: SR-429 NB
Minimum Vertical Clearance: 6.49m (21.29ft),  Kilometerpoint: 4.332,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 750408,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.560047),  Route carried "under" structure: ServiceCity street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 101 (year 2020),  Truck Traffic: 10%,  Features Intersected: Story Road & Access Rd.,  Facility Carried by Structure: SR-429 Ramp L
Minimum Vertical Clearance: 7.19m (23.59ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.5m (113.2ft)

Find on map >>   Show street view

Structure Number: 750408,  Location: 0.5 Mi. North of SR-50 (Lat: 28.558667,  Lng: -81.560047),  Route carried "under" structure: City street ,  Year Built: 2000,  Structure Length: 0. m,  Average Daily Traffic: 4,700 (year 2019),  Truck Traffic: 6%,  Features Intersected: Story Road & Access Rd.,  Facility Carried by Structure: SR-429 Ramp L
Minimum Vertical Clearance: 7.86m (25.79ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.5m (113.2ft)

Find on map >>   Show street view

Structure Number: 750535,  Location: 4.3 Mi. South of Turnpike (Lat: 28.512028,  Lng: -81.605528),  Route carried "under" structure: County highway ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 6%,  Features Intersected: Stoneybrook West Pkwy.,  Facility Carried by Structure: SR-429 SB
Minimum Vertical Clearance: 5.91m (19.39ft),  Kilometerpoint: 1.579,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.2m (92.5ft)

Find on map >>   Show street view

Structure Number: 750536,  Location: 4.3 Mi. South of Turnpike (Lat: 28.511944,  Lng: -81.605194),  Route carried "under" structure: County highway ,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 5,500 (year 2020),  Truck Traffic: 6%,  Features Intersected: Stoneybrook West Pkwy.,  Facility Carried by Structure: SR-429 NB
Minimum Vertical Clearance: 5.46m (17.91ft),  Kilometerpoint: 1.614,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.5m (93.5ft)

Find on map >>   Show street view

Structure Number: 750537,  Location: 3 Mi. South of Turnpike (Lat: 28.517778,  Lng: -81.586028),  Route carried "under" structure: County highway 535,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 36,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: CR-535,  Facility Carried by Structure: SR-429 SB
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 21.173,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.6m (162.7ft)

Find on map >>   Show street view

Structure Number: 750538,  Location: 3 Mi. South of Turnpike (Lat: 28.517556,  Lng: -81.585903),  Route carried "under" structure: State highway 535,  Year Built: 2005,  Structure Length: 0. m,  Average Daily Traffic: 36,000 (year 2020),  Truck Traffic: 6%,  Features Intersected: CR-535,  Facility Carried by Structure: SR-429 NB
Minimum Vertical Clearance: 5.52m (18.11ft),  Kilometerpoint: 21.142,  Lanes on structure: 2,  Lanes under structure: 9,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 49.6m (162.7ft)

Find on map >>   Show street view

Structure Number: 750549,  Location: SR-429-SR-50 (Lat: 28.551417,  Lng: -81.558853),  Route carried "under" structure: State highway 50,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 51,500 (year 2020),  Truck Traffic: 5%,  Features Intersected: SR-50,  Facility Carried by Structure: SR-429 SB
Minimum Vertical Clearance: 5.61m (18.41ft),  Kilometerpoint: 9.740,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 75055,  Location: SR-429-SR-50 (Lat: 28.551417,  Lng: -81.558558),  Route carried "under" structure: State highway 50,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 51,000 (year 2020),  Truck Traffic: 5%,  Features Intersected: SR-50,  Facility Carried by Structure: SR-429 NB
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 9.769,  Lanes on structure: 2,  Lanes under structure: 6,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 53.9m (176.8ft)

Find on map >>   Show street view

Structure Number: 750551,  Location: 0.2 MI W OF SR 50 (Lat: 28.547928,  Lng: -81.558342),  Route carried "under" structure: State highway 91,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 76,100 (year 2020),  Truck Traffic: 21%,  Features Intersected: SR 429/SR 91 TPK,  Facility Carried by Structure: RAMP I 268.3
Minimum Vertical Clearance: 19.39m (63.62ft),  Kilometerpoint: 30.293,  Lanes on structure: 1,  Lanes under structure: 9,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 62.1m (203.7ft)

Find on map >>   Show street view

Structure Number: 750551,  Location: 0.2 MI W OF SR 50 (Lat: 28.547928,  Lng: -81.558342),  Route carried "under" structure: Ramp State highway 429,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 1,800 (year 2016),  Truck Traffic: 17%,  Features Intersected: SR 429/SR 91 TPK,  Facility Carried by Structure: RAMP I 268.3
Minimum Vertical Clearance: 20.57m (67.49ft),  Kilometerpoint: 0.325,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 62.1m (203.7ft)

Find on map >>   Show street view

Structure Number: 750551,  Location: 0.2 MI W OF SR 50 (Lat: 28.547928,  Lng: -81.558342),  Route carried "under" structure: State highway 429,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 73,600 (year 2016),  Truck Traffic: 17%,  Features Intersected: SR 429/SR 91 TPK,  Facility Carried by Structure: RAMP I 268.3
Minimum Vertical Clearance: 11.33m (37.17ft),  Kilometerpoint: 30.325,  Lanes on structure: 1,  Lanes under structure: 6,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 62.1m (203.7ft)

Find on map >>   Show street view

Structure Number: 750551,  Location: 0.2 MI W OF SR 50 (Lat: 28.547928,  Lng: -81.558342),  Route carried "under" structure: Ramp State highway 91,  Year Built: 2002,  Structure Length: 0. m,  Average Daily Traffic: 10,500 (year 2020),  Truck Traffic: 21%,  Features Intersected: SR 429/SR 91 TPK,  Facility Carried by Structure: RAMP I 268.3
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 0.563,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 62.1m (203.7ft)

Find on map >>   Show street view

Structure Number: 750605,  Location: 1.5 MILES S OF SR 438 (Lat: 28.549589,  Lng: -81.558933),  Route carried "under" structure: Ramp State highway 429,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 10,500 (year 2020),  Truck Traffic: 21%,  Features Intersected: RAMP M
Minimum Vertical Clearance: 4.90m (16.08ft),  Kilometerpoint: 0.209,  Lanes on structure: 2,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 52.1m (170.9ft)

Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "under" structure: State highway 429,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 73,600 (year 2016),  Truck Traffic: 6%,  Features Intersected: SR 91 TPK,  Facility Carried by Structure: RAMP SR 91 268.3
Minimum Vertical Clearance: 8.05m (26.41ft),  Kilometerpoint: 30.325,  Lanes on structure: 1,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "under" structure: Ramp State highway 91,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 10,500 (year 2020),  Truck Traffic: 21%,  Features Intersected: SR 91 TPK
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 0.515,  Lanes on structure: 1,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "under" structure: Ramp State highway 91,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 1,800 (year 2016),  Truck Traffic: 17%,  Features Intersected: SR 91 TPK
Minimum Vertical Clearance: 20.57m (67.49ft),  Kilometerpoint: 0.370,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "under" structure: Ramp State highway 429,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,300 (year 2020),  Truck Traffic: 6%,  Features Intersected: SR 91 TPK,  Facility Carried by Structure: RAMP SR 91 268.3
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.209,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "under" structure: Ramp State highway 429,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 3,100 (year 2020),  Truck Traffic: 6%,  Features Intersected: SR 91 TPK,  Facility Carried by Structure: RAMP SR 91 268.3
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 0.241,  Lanes on structure: 1,  Lanes under structure: 1,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 750607,  Location: SR 91 & SR 429 INTERCHNG (Lat: 28.547342,  Lng: -81.559078),  Route carried "under" structure: State highway 91,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 76,100 (year 2020),  Truck Traffic: 21%,  Features Intersected: SR 91 TPK
Minimum Vertical Clearance: 16.54m (54.27ft),  Kilometerpoint: 30.383,  Lanes on structure: 1,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 59.7m (195.9ft)

Find on map >>   Show street view

Structure Number: 750634,  Location: 9.2 MI N OF I-4 (Lat: 28.545267,  Lng: -81.569956),  Route carried "under" structure: County highway ,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2020),  Truck Traffic: 6%,  Features Intersected: BEULAH ROAD,  Facility Carried by Structure: SR 91 TPK NS 269.1
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.031,  Lanes on structure: 8,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.0m (78.7ft)

Find on map >>   Show street view

Structure Number: 750635,  Location: 0.4 MI S OF SR 50 (Lat: 28.545178,  Lng: -81.587706),  Route carried "under" structure: State highway 91,  Year Built: 2010,  Structure Length: 0. m,  Average Daily Traffic: 94,000 (year 2020),  Truck Traffic: 21%,  Features Intersected: SR 91 TPK,  Facility Carried by Structure: CR 535 270.0
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 33.144,  Lanes on structure: 2,  Lanes under structure: 8,  Toll: On toll road,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Discuss Winter Garden, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.