Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Truth or Consequences, New Mexico (NM)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 41Number of bridges
  • 463ft / 141mTotal length
  • $5,424,000Total costs
  • 163,631Total average daily traffic
  • 39,082Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Truth or Consequences
  • No street view available for this location

New bridges in Truth or Consequences, NM - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 91960-1969
  • 161970-1979
  • 11980-1989
  • 51990-1999
  • 72000-2009
  • 12010-2019
Reconstructed bridges in Truth or Consequences, NM - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 01980-1989
  • 01990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Truth or Consequences, NM
Average Bridge Truck Traffic in Truth or Consequences, NM
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 68.2%Good
  • 27.3%Satisfactory
  • 4.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 59.1%Good
  • 31.8%Satisfactory
  • 9.1%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 36.4%Satisfactory
  • 13.6%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 65.2%Good
  • 8.7%Satisfactory
  • 21.7%Fair
  • 4.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 55.6%Good
  • 44.4%Satisfactory
Find on map >>   Show street view

Structure Number: 1756,  Location: 5.3 M N of T OR C/exit 83 (Lat: 33.204914,  Lng: -107.251142),  Route carried "on" structure: State highway 181,  Year Built: 1935,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 150 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 129 (year 2040),  Design Load: H 15,  Features Intersected: Yapple Canyon
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.164,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.2m (26.9ft)

Condition: Deck: Poor,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Poor,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.11m (10.20ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $123,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $185,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 2076,  Location: 1.25 MI S OF EXIT-89/I-25 (Lat: 33.269786,  Lng: -107.279186),  Route carried "on" structure: State highway 181,  Year Built: 1939,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 380 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 327 (year 2040),  Design Load: H 15,  Features Intersected: CEDAR CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.905,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 1.8m (5.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 34.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022
Find on map >>   Show street view

Structure Number: 6438,  Location: 2.4 mi NE Exit 75/I-25 (Lat: 33.127947,  Lng: -107.259958),  Route carried "on" structure: State highway 11,  Year Built: 1963,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 8,136 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,449 (year 2040),  Design Load: HS 20,  Features Intersected: UNNAMED WATERWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.786,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 21.1m (69.2ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 39.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 679,  Location: Junction I-25 and NM-181 (Lat: 33.223011,  Lng: -107.256025),  Route carried "on" structure: Interstate 25,  Year Built: 1967,  Status: Open,  Structure Length: 6.98m (22.90ft),  Average Daily Traffic: 7,108 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 12,168 (year 2040),  Design Load: HS 20,  Features Intersected: NM-181
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.879,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.9m (45.6ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 13.1m (43.0ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $300,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6791,  Location: Junction of I-25/NM-181 (Lat: 33.223692,  Lng: -107.256639),  Route carried "on" structure: Interstate 25,  Year Built: 1967,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 5,106 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 8,742 (year 2040),  Design Load: HS 20,  Features Intersected: NM-181
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 134.879,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 6 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.53m (24.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $570,000,  Roadway Improvement Cost: $57,000,  Total Project Cost: $855,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 6792,  Location: 5.2 Mi N Jct I-25/NM-181 (Lat: 33.293611,  Lng: -107.286519),  Route carried "on" structure: State highway 2027,  Year Built: 1967,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 39 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 73 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBLS/SBLS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.931,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.5m (31.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 9.5m (31.2ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $200,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $300,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 6895,  Location: 3.1 MI N OF NM-181 (Lat: 33.266947,  Lng: -107.269906),  Route carried "on" structure: Interstate 25,  Year Built: 1967,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 5,106 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 8,742 (year 2040),  Design Load: HS 20,  Features Intersected: CEDAR CANYON
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 139.868,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.3m (86.3ft),  Skew: 20 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 98.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020
Find on map >>   Show street view

Structure Number: 7103,  Location: 0.7 M N Williamsburg (Lat: 33.122967,  Lng: -107.293725),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 7,269 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 12,443 (year 2040),  Design Load: HS 20,  Features Intersected: Local Rd 51Z004/Mud Sprg
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.988,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7104,  Location: 0.7 M N Jct Loop 001/I-25 (Lat: 33.123172,  Lng: -107.293908),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 5.94m (19.49ft),  Average Daily Traffic: 7,269 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 12,443 (year 2040),  Design Load: HS 20,  Features Intersected: Local Rd/Mud Spring Aryo
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 121.988,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.2m (63.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 7117,  Location: North T or C Interchange (Lat: 33.157119,  Lng: -107.253311),  Route carried "on" structure: City street 11,  Year Built: 1970,  Status: Open,  Structure Length: 7.71m (25.30ft),  Average Daily Traffic: 2,643 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 7,929 (year 2040),  Design Load: HS 20,  Features Intersected: I-25 NBL/SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.803,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.0m (29.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.2m (86.0ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.71m (25.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $422,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $634,000 ( Estimate for 2020),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7118,  Location: 0.9 M N TorC Interchange (Lat: 33.170506,  Lng: -107.253100),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 15.73m (51.61ft),  Average Daily Traffic: 6,124 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,483 (year 2040),  Design Load: HS 20,  Features Intersected: Cuchillo Negro Creek/Rd
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 129.005,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.8m (38.7ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7119,  Location: 0.9 M N I-25/T or C (Lat: 33.170756,  Lng: -107.253369),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 15.73m (51.61ft),  Average Daily Traffic: 6,124 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,483 (year 2040),  Design Load: HS 20,  Features Intersected: Cuchillo Negro Creek/lRd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 129.005,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.5m (37.7ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 21.9m (71.9ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $150,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $500,000 ( Estimate for 2030),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 712,  Location: 2.7 Mi N T or C N Interch (Lat: 33.210692,  Lng: -107.255339),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 6,124 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,483 (year 2040),  Design Load: HS 20,  Features Intersected: Yapple Canyon
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 133.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.7m (38.4ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7121,  Location: 2.7 Mi N T or C N Interch (Lat: 33.211058,  Lng: -107.255831),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 6,124 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 10,483 (year 2040),  Design Load: HS 20,  Features Intersected: Yapple Canyon
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 133.495,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 3 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 12.2m (40.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 56.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 7152,  Location: 3.3 M N Jct Loop 001/I-25 (Lat: 33.147072,  Lng: -107.258769),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 4.60m (15.09ft),  Average Daily Traffic: 7,269 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 12,443 (year 2040),  Design Load: HS 20,  Features Intersected: Country Club Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.205,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 7153,  Location: 3.3 M N Jct Loop 001/I-25 (Lat: 33.147308,  Lng: -107.258906),  Route carried "on" structure: Interstate 25,  Year Built: 1970,  Status: Open,  Structure Length: 4.63m (15.19ft),  Average Daily Traffic: 7,269 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 12,443 (year 2040),  Design Load: HS 20,  Features Intersected: Country Club Rd
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 126.205,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.1m (56.1ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8974,  Location: 5.58 MI E OF NM-181 (Lat: 33.236283,  Lng: -107.349072),  Route carried "on" structure: State highway 52,  Year Built: 1995,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 207 (year 2020),  Truck Traffic: 20%,  Average Future Daily Traffic: 178 (year 2040),  Design Load: HS 20,  Features Intersected: Unnamed Waterway
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.787,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 4.3m (14.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 32.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021
Find on map >>   Show street view

Structure Number: 9104,  Location: 0.9 Mi N Jct I-10 & I (Lat: 32.279725,  Lng: -106.736131),  Route carried "on" structure: Interstate 25,  Year Built: 2001,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 7,877 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 14,515 (year 2040),  Design Load: HS 20,  Features Intersected: Wells-Geothermal Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.1m (49.5ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.7m (104.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 32.0m (105.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 73.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9105,  Location: 0.9 M N Jct I-10 & I-25 (Lat: 32.279842,  Lng: -106.735947),  Route carried "on" structure: State highway 2003,  Year Built: 2001,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 6,806 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,091 (year 2040),  Design Load: HS 20,  Features Intersected: Well-Geothermal Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.448,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9227,  Location: 0.1 Mi N Paradise Blvd (Lat: 35.193406,  Lng: -106.727569),  Route carried "on" structure: City street 5260,  Year Built: 1999,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 10,649 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,928 (year 2040),  Design Load: HS 20,  Features Intersected: Piedras Marcadas Arroyo
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 21 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.0m (9.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022
Find on map >>   Show street view

Structure Number: 9228,  Location: 0.5 Mi N Paseo del Norte (Lat: 35.193025,  Lng: -106.736183),  Route carried "on" structure: City street 1001,  Year Built: 1999,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 3,791 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,247 (year 2040),  Design Load: HS 20,  Features Intersected: Piedras Marcadas Arroyo,  Facility Carried by Structure: Rainbow Blvd NBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 4.0m (13.1ft),  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 9229,  Location: 0.5 M N Paseo del Norte (Lat: 35.193011,  Lng: -106.736447),  Route carried "on" structure: City street 1363,  Year Built: 1999,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 3,791 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,247 (year 2040),  Design Load: HS 20,  Features Intersected: Piedras Marcadas Arroyo,  Facility Carried by Structure: RAINBOW BLVD SBL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb or Sidewalk Widths: Left: 3.7m (12.1ft),  Right: 0.0m,  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9231,  Location: 0.3 M W Rainbow Blvd (Lat: 35.191783,  Lng: -106.741575),  Route carried "on" structure: City street 1000,  Year Built: 1999,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,637 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,668 (year 2040),  Design Load: HS 20,  Features Intersected: Piedras Marcadas Arroyo,  Facility Carried by Structure: Ventana Ranch RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 3.2m (10.5ft),  Right: 3.2m (10.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9232,  Location: 0.2 M S Paseo del Norte (Lat: 35.176767,  Lng: -106.687636),  Route carried "on" structure: City street 4079,  Year Built: 1988,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 21,326 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 21,787 (year 2040),  Design Load: HS 20,  Features Intersected: Piedras Marcadas Arroyo,  Facility Carried by Structure: Golf Course Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.5m (50.9ft),  Skew: 21 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 15.5m (50.9ft),  Out-to-Out Width: 30.5m (100.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 94,  Location: 2.2 MI E OF LOOP-11/TRUTH (Lat: 33.148886,  Lng: -107.221517),  Route carried "on" structure: State highway 51,  Year Built: 2007,  Status: Open,  Structure Length: 7.27m (23.85ft),  Average Daily Traffic: 1,384 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,256 (year 2040),  Design Load: HS 20,  Features Intersected: CUCHILLO CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.541,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 27.6m (90.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9401,  Location: 3.1 MI E OF LOOP-11\TRUTH (Lat: 33.144919,  Lng: -107.208883),  Route carried "on" structure: State highway 51,  Year Built: 2007,  Status: Open,  Structure Length: 10.86m (35.63ft),  Average Daily Traffic: 590 (year 2020),  Truck Traffic: 21%,  Average Future Daily Traffic: 507 (year 2040),  Design Load: HS 20,  Features Intersected: RIO GRANDE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.989,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.7m (41.7ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.7m (44.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 9472,  Location: 1.8 MI. EAST ON BROAD AVE (Lat: 33.126744,  Lng: -107.268889),  Route carried "on" structure: City street 51001,  Year Built: 2003,  Status: Open,  Structure Length: 1.12m (3.67ft),  Average Daily Traffic: 56 (year 2020),  Average Future Daily Traffic: 94 (year 2040),  Design Load: HS 20,  Features Intersected: Flood Control Ditch,  Facility Carried by Structure: 51-A001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $300,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $800,000 ( Estimate for 2040)
Find on map >>   Show street view

Structure Number: 9473,  Location: 1.8 MI EAST BROAD AVE (Lat: 33.126058,  Lng: -107.268708),  Route carried "on" structure: City street 51001,  Year Built: 2003,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 56 (year 2020),  Average Future Daily Traffic: 94 (year 2040),  Design Load: HS 20,  Features Intersected: FLOOD CONTROL DITCH,  Facility Carried by Structure: CORIZNE STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $600,000 ( Estimate for 2040)
Find on map >>   Show street view

Structure Number: 9474,  Location: 1.8 MI EAST BROAD AVE (Lat: 33.125058,  Lng: -107.268658),  Route carried "on" structure: City street 51001,  Year Built: 2003,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 56 (year 2020),  Average Future Daily Traffic: 94 (year 2040),  Design Load: HS 20,  Features Intersected: FLOOD CONTROL DITCH,  Facility Carried by Structure: 51-A001
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 0.0m

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Length Of Structure Improvement: 6.10m (20.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $250,000,  Roadway Improvement Cost: $150,000,  Total Project Cost: $750,000 ( Estimate for 2040)
Find on map >>   Show street view

Structure Number: 9642,  Location: 6.59 M N Jct NM-181/I-25 (Lat: 33.312667,  Lng: -107.291053),  Route carried "on" structure: Interstate 25,  Year Built: 1967,  Year Reconstructed: 2015,  Status: Open,  Structure Length: 11.09m (36.38ft),  Average Daily Traffic: 5,244 (year 2020),  Truck Traffic: 37%,  Average Future Daily Traffic: 8,977 (year 2040),  Design Load: HS 20,  Features Intersected: Alamosa River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 145.404,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.1m (72.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 94.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 9809,  Location: 21.8 M N fo I-25 Ex 32 (Lat: 32.966400,  Lng: -107.009567),  Route carried "on" structure: County highway 5105,  Year Built: 2018,  Status: Open,  Structure Length: 2.32m (7.61ft),  Average Daily Traffic: 187 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 350 (year 2040),  Design Load: HS 20,  Features Intersected: Yost Arroya,  Facility Carried by Structure: A-013
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.084,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: County Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 0.0m,  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 75.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Other,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 679,  Location: Junction I-25 and NM-181 (Lat: 33.223011,  Lng: -107.256025),  Route carried "under" structure: State highway 181,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 506 (year 2020),  Truck Traffic: 21%,  Features Intersected: NM-181,  Facility Carried by Structure: I-25 NB
Minimum Vertical Clearance: 4.61m (15.12ft),  Kilometerpoint: 8.530,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 6791,  Location: Junction of I-25/NM-181 (Lat: 33.223692,  Lng: -107.256639),  Route carried "under" structure: State highway 181,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 506 (year 2020),  Truck Traffic: 21%,  Features Intersected: NM-181,  Facility Carried by Structure: I-25 SB
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 8.530,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 25.6m (84.0ft)

Find on map >>   Show street view

Structure Number: 6792,  Location: 5.2 Mi N Jct I-25/NM-181 (Lat: 33.293611,  Lng: -107.286519),  Route carried "under" structure: Interstate 25,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 5,244 (year 2020),  Truck Traffic: 37%,  Features Intersected: I-25 NBLS/SBLS,  Facility Carried by Structure: FR-2027
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 143.280,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: 7103,  Location: 0.7 M N Williamsburg (Lat: 33.122967,  Lng: -107.293725),  Route carried "under" structure: County highway 51099,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 1,857 (year 2020),  Truck Traffic: 16%,  Features Intersected: Local Rd 51Z004/Mud Sprg,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 7104,  Location: 0.7 M N Jct Loop 001/I-25 (Lat: 33.123172,  Lng: -107.293908),  Route carried "under" structure: County highway 51099,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 1,857 (year 2020),  Truck Traffic: 16%,  Features Intersected: Local Rd/Mud Spring Aryo,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.66m (15.29ft),  Kilometerpoint: 0.008,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.2m (63.0ft)

Find on map >>   Show street view

Structure Number: 7117,  Location: North T or C Interchange (Lat: 33.157119,  Lng: -107.253311),  Route carried "under" structure: Interstate 25,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 3,424 (year 2020),  Truck Traffic: 51%,  Features Intersected: I-25 NBL/SBL,  Facility Carried by Structure: L-00011
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 127.508,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Find on map >>   Show street view

Structure Number: 7118,  Location: 0.9 M N TorC Interchange (Lat: 33.170506,  Lng: -107.253100),  Route carried "under" structure: County highway 51000,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 156 (year 2020),  Truck Traffic: 15%,  Features Intersected: Cuchillo Negro Creek/Rd,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 7119,  Location: 0.9 M N I-25/T or C (Lat: 33.170756,  Lng: -107.253369),  Route carried "under" structure: County highway 51000,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 156 (year 2020),  Truck Traffic: 15%,  Features Intersected: Cuchillo Negro Creek/lRd,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.002,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 21.9m (71.9ft)

Find on map >>   Show street view

Structure Number: 7152,  Location: 3.3 M N Jct Loop 001/I-25 (Lat: 33.147072,  Lng: -107.258769),  Route carried "under" structure: City street 5194,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2,014 (year 2020),  Truck Traffic: 21%,  Features Intersected: Country Club Rd,  Facility Carried by Structure: I-25 NBL
Minimum Vertical Clearance: 6.37m (20.90ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Find on map >>   Show street view

Structure Number: 7153,  Location: 3.3 M N Jct Loop 001/I-25 (Lat: 33.147308,  Lng: -107.258906),  Route carried "under" structure: City street 5194,  Year Built: 1970,  Structure Length: 0. m,  Average Daily Traffic: 2,014 (year 2020),  Truck Traffic: 21%,  Features Intersected: Country Club Rd,  Facility Carried by Structure: I-25 SBL
Minimum Vertical Clearance: 5.97m (19.59ft),  Kilometerpoint: 0.966,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.1m (56.1ft)

Discuss Truth or Consequences, New Mexico (NM) on our hugely popular New Mexico forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.