Bridge Statistics for North Attleborough, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 24Number of bridges
  • 272ft / 83.0mTotal length
  • $73,870,000Total costs
  • 623,817Total average daily traffic
  • 25,339Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Attleborough
  • No street view available for this location

New bridges in North Attleborough, MA - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 21950-1959
  • 161960-1969
  • 21970-1979
  • 12000-2009
Reconstructed bridges in North Attleborough, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
Average Bridge Daily Traffic in North Attleborough, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.3%Very good
  • 15.8%Good
  • 52.6%Satisfactory
  • 21.1%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.5%Good
  • 52.6%Satisfactory
  • 36.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Very good
  • 31.6%Good
  • 47.4%Satisfactory
  • 10.5%Fair
  • 5.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Good
  • 42.9%Satisfactory
  • 28.6%Fair
  • 14.3%Poor
Find on map >>   Show street view

Structure Number: N160033JTMUNNBI,  Location: .6 MI E RHODE ISLAND (Lat: 41.932742,  Lng: -71.369575),  Route carried "on" structure: City street ,  Year Built: 1886,  Year Reconstructed: 1980,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,800 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 5,685 (year 2031),  Design Load: HS 20,  Features Intersected: WATER ABBOTT RUN RIVER,  Facility Carried by Structure: HWY CUSHMAN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 6.6m (21.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.00m (6.56ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,645,000,  Roadway Improvement Cost: $165,000,  Total Project Cost: $2,468,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy
Find on map >>   Show street view

Structure Number: N160043JUMUNNBI,  Location: AT JUNCT. DEPOT STREET (Lat: 41.928589,  Lng: -71.372889),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 1953,  Status: Open,  Structure Length: 1.43m (4.69ft),  Average Daily Traffic: 7,100 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 17,372 (year 2031),  Design Load: H 20,  Features Intersected: WATER ABBOTT RUN RIVER,  Facility Carried by Structure: HWY MENDON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Poor,  Channel: Poor,  Operating Rating: 34.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 12 months,  Inspection Date: November 2020,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $1,856,000,  Roadway Improvement Cost: $186,000,  Total Project Cost: $2,785,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N16008830MUNNBI,  Location: .5MI E OF MENDON RD (Lat: 41.944569,  Lng: -71.371789),  Route carried "on" structure: City street ,  Year Built: 2007,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 2,100 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,211 (year 2032),  Design Load: HS 20,  Features Intersected: WATER ABBOTT RUN RIVER,  Facility Carried by Structure: HWY HUNTS BRG RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,204,000,  Roadway Improvement Cost: $121,000,  Total Project Cost: $1,807,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N1601596NDOTNBI,  Location: INT.US1&ELM (Lat: 41.981111,  Lng: -71.329667),  Route carried "on" structure: US 1,  Year Built: 1850,  Year Reconstructed: 1930,  Status: Open,  Structure Length: 1.64m (5.38ft),  Average Daily Traffic: 35,948 (year 2021),  Truck Traffic: 5%,  Features Intersected: WATER TEN MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 24.0m (78.7ft),  Skew: 17 degrees,  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.8m (48.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 24.0m (78.7ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 52.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 18 months,  Underwater Inspection Frequency: Every 18 months,  Inspection Date: November 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $1,735,000,  Roadway Improvement Cost: $174,000,  Total Project Cost: $2,603,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N160163JVMUNNBI,  Location: ADJACENT TO ROUTE 1 (Lat: 41.982919,  Lng: -71.328444),  Route carried "on" structure: City street ,  Year Built: 1979,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 7,700 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,265 (year 2031),  Design Load: H 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY ORNE ST/LNDY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Fair,  Operating Rating: 58.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $516,000,  Roadway Improvement Cost: $52,000,  Total Project Cost: $775,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160233LUMUNNBI,  Location: .1 MI E OF CLIFTON ST (Lat: 41.960914,  Lng: -71.307567),  Route carried "on" structure: City street ,  Year Built: 1978,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 650 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 632 (year 2031),  Design Load: H 20,  Features Intersected: WATER TEN MILE RIVER,  Facility Carried by Structure: HWY CEDAR RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 6.1m (20.0ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $691,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,037,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N160463VNDOTNBI,  Location: .2 MILES SOUTH PLAINVILL (Lat: 41.995892,  Lng: -71.291967),  Route carried "on" structure: State highway 152,  Year Built: 1959,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 13.62m (44.69ft),  Average Daily Traffic: 30,388 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 33,165 (year 2032),  Design Load: HS 20,  Features Intersected: I 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.786,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 37.6m (123.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Very good,  Superstructure: Satisfactory,  Substructure: Very good,  Operating Rating: 66.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 13.70m (44.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $1,970,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $2,956,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160473VJDOTNBI,  Location: .1 MI N OF ATTLEBORO T.L. (Lat: 41.969253,  Lng: -71.295772),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 9.08m (29.79ft),  Average Daily Traffic: 32,327 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 54,012 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: I 95,  Facility Carried by Structure: HWY TONER BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 0.7m (2.3ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.6m (64.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $7,006,000,  Roadway Improvement Cost: $701,000,  Total Project Cost: $10,510,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160493R5DOTNBI,  Location: .2 MI SW OF MANSFLD T.L. (Lat: 42.006431,  Lng: -71.284742),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Status: Open,  Structure Length: 4.42m (14.50ft),  Average Daily Traffic: 62,245 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 85,598 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY PLAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.449,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,023,000,  Roadway Improvement Cost: $303,000,  Total Project Cost: $4,535,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160493R6DOTNBI,  Location: .2 MI SW OF MANSFLD T.L. (Lat: 42.006464,  Lng: -71.285519),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 62,090 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 85,598 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY PLAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.449,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $2,956,000,  Roadway Improvement Cost: $296,000,  Total Project Cost: $4,435,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160503UVDOTNBI,  Location: .7 MI SE OF R.I.S.L. (Lat: 41.950731,  Lng: -71.368156),  Route carried "on" structure: Interstate 295,  Year Built: 1966,  Status: Open,  Structure Length: 3.75m (12.30ft),  Average Daily Traffic: 30,337 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 47,379 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY PAINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,523,000,  Roadway Improvement Cost: $253,000,  Total Project Cost: $3,785,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160503UWDOTNBI,  Location: .7 MI SE OF R.I.S.L. (Lat: 41.950400,  Lng: -71.367978),  Route carried "on" structure: Interstate 295,  Year Built: 1966,  Status: Open,  Structure Length: 3.69m (12.11ft),  Average Daily Traffic: 29,400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 55,276 (year 2033),  Design Load: HS 20,  Features Intersected: HWY PAINE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.6m (61.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.70m (12.14ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,457,000,  Roadway Improvement Cost: $246,000,  Total Project Cost: $3,686,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160523Y5DOTNBI,  Location: BEHIND EMERALD SQ MALL (Lat: 41.949558,  Lng: -71.353975),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 8.84m (29.00ft),  Average Daily Traffic: 1,900 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,687 (year 2032),  Design Load: HS 20,  Features Intersected: I 295,  Facility Carried by Structure: HWY ALLEN AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.173,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 22.3m (73.2ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.90m (29.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $4,440,000,  Roadway Improvement Cost: $445,000,  Total Project Cost: $6,661,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160533UTDOTNBI,  Location: 2 MI. W. OF I-95 (Lat: 41.949381,  Lng: -71.345744),  Route carried "on" structure: Interstate 295,  Year Built: 1966,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 30,400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 64,593 (year 2031),  Design Load: HS 20,  Features Intersected: US 1 S WASHINGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,030,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $4,546,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160533UUDOTNBI,  Location: 2 MILES WEST OF I 95 (Lat: 41.949056,  Lng: -71.345858),  Route carried "on" structure: Interstate 295,  Year Built: 1966,  Status: Open,  Structure Length: 5.00m (16.40ft),  Average Daily Traffic: 29,359 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 37,903 (year 2031),  Design Load: HS 20,  Features Intersected: US 1 S WASHINGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.058,  Lanes on structure: 4,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 29.9m (98.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $3,030,000,  Roadway Improvement Cost: $304,000,  Total Project Cost: $4,546,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160543URDOTNBI,  Location: .2 MI E OF US 1 (Lat: 41.949397,  Lng: -71.341800),  Route carried "on" structure: Interstate 295,  Year Built: 1966,  Status: Open,  Structure Length: 0.64m (2.10ft),  Average Daily Traffic: 46,386 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WATER SEVEN MILE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.378,  Lanes on structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 36.6m (120.1ft),  Skew: 21 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.10m (0.33ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2021,  Underwater Inspection Date: March 2021,  Bridge Improvement Cost: $58,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $88,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N160553UPDOTNBI,  Location: .3 MI E OF US1 (Lat: 41.949461,  Lng: -71.339875),  Route carried "on" structure: Interstate 295,  Year Built: 1967,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 20,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 68,384 (year 2033),  Design Load: HS 20,  Features Intersected: HWY OLD POST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,434,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $3,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160553UQDOTNBI,  Location: .3 MI. E. OF US1 (Lat: 41.949800,  Lng: -71.339733),  Route carried "on" structure: Interstate 295,  Year Built: 1967,  Status: Open,  Structure Length: 3.38m (11.09ft),  Average Daily Traffic: 26,233 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 68,384 (year 2033),  Design Load: HS 20,  Features Intersected: HWY OLD POST RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.540,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $2,212,000,  Roadway Improvement Cost: $222,000,  Total Project Cost: $3,319,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160563UMDOTNBI,  Location: 1.2 MI W OF I 95 (Lat: 41.952242,  Lng: -71.325531),  Route carried "on" structure: Interstate 295,  Year Built: 1967,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 20,154 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 39,482 (year 2032),  Design Load: HS 20,  Features Intersected: HWY MT HOPE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.989,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,225,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $4,838,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160563UNDOTNBI,  Location: 1.2 MI W OF I 95 (Lat: 41.952625,  Lng: -71.325269),  Route carried "on" structure: Interstate 295,  Year Built: 1967,  Status: Open,  Structure Length: 4.75m (15.58ft),  Average Daily Traffic: 27,000 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 37,903 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY MT HOPE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.989,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.6m (74.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 59.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.80m (15.75ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,225,000,  Roadway Improvement Cost: $323,000,  Total Project Cost: $4,838,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N160463VNDOTNBI,  Location: ST 152 AT I 95 (Lat: 42.000000,  Lng: -71.300000),  Route carried "under" structure: Interstate 95,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 46,900 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: ST152
Minimum Vertical Clearance: 0.00m,  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.5m (123.0ft)

Find on map >>   Show street view

Structure Number: N160473VJDOTNBI,  Location: 081089 STATUTORY (Lat: 41.966667,  Lng: -71.300000),  Route carried "under" structure: Interstate 95,  Year Built: 1960,  Structure Length: 0. m,  Average Daily Traffic: 46,900 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY TONER BLVD
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: N160523Y5DOTNBI,  Location: 1.5 MI SE OF R.I.S.L. (Lat: 41.950000,  Lng: -71.366667),  Route carried "under" structure: Interstate 295,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 12,650 (year 0000),  Features Intersected: I 295 NB,  Facility Carried by Structure: HWY ALLEN AVE
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Find on map >>   Show street view

Structure Number: N160523Y5DOTNBI,  Location: 000066 STATUTORY (Lat: 41.950000,  Lng: -71.366667),  Route carried "under" structure: Interstate 295,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 12,650 (year 0000),  Features Intersected: I 295 SB,  Facility Carried by Structure: HWY ALLEN AVE
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 17.7m (58.1ft)

Discuss North Attleborough, Massachusetts (MA) on our hugely popular Massachusetts forum.