Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Adams, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 23Number of bridges
  • 322ft / 98.0mTotal length
  • $79,568,000Total costs
  • 178,395Total average daily traffic
  • 15,050Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Adams
  • No street view available for this location

New bridges in North Adams, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11930-1939
  • 21940-1949
  • 131950-1959
  • 21960-1969
  • 11970-1979
  • 21980-1989
  • 12000-2009
Reconstructed bridges in North Adams, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 11950-1959
  • 01960-1969
  • 21970-1979
  • 11980-1989
  • 21990-1999
  • 12000-2009
Average Bridge Daily Traffic in North Adams, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 52.4%Good
  • 33.3%Satisfactory
  • 14.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 9.5%Very good
  • 38.1%Good
  • 28.6%Satisfactory
  • 14.3%Fair
  • 4.8%Poor
  • 4.8%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 4.8%Very good
  • 42.9%Good
  • 42.9%Satisfactory
  • 9.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 52.4%Very good
  • 28.6%Good
  • 9.5%Satisfactory
  • 9.5%Fair
Find on map >>   Show street view

Structure Number: N1400106TMUNNBI,  Location: 450' S OF JCT W/MASS AVE (Lat: 42.703092,  Lng: -73.168278),  Route carried "on" structure: City street ,  Year Built: 1985,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 2,350 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,474 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HOOSIC RIVER,  Facility Carried by Structure: HWY ASHTON AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.4m (86.6ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,019,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,529,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N1400401FMUNNBI,  Location: 500' N OF JCT W/RTE 2 (Lat: 42.699661,  Lng: -73.150306),  Route carried "on" structure: City street ,  Year Built: 1950,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 1,681 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,895 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HOOSIC RIVER,  Facility Carried by Structure: HWY PROTECTION
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.628,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 62.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $2,060,000,  Roadway Improvement Cost: $207,000,  Total Project Cost: $3,091,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N1400701GMUNNBI,  Location: AT INT. WITH RIVER ST (Lat: 42.703256,  Lng: -73.120456),  Route carried "on" structure: City street ,  Year Built: 1952,  Status: Posted for load,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 1,138 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,159 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HOOSIC RIVER,  Facility Carried by Structure: HWY BROWN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.1m (82.3ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Good,  Superstructure: Serious,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $3,282,000,  Roadway Improvement Cost: $329,000,  Total Project Cost: $4,924,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N1400801JMUNNBI,  Location: BETWEEN RTE2 & RIVER ST (Lat: 42.702447,  Lng: -73.113653),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 6,904 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 16,583 (year 2032),  Design Load: H 20,  Features Intersected: WATER N BR HOOSIC RIVER,  Facility Carried by Structure: HWY MARSHALL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.3m (46.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 42.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,368,000,  Roadway Improvement Cost: $137,000,  Total Project Cost: $2,053,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N1400901KMUNNBI,  Location: AT NBR HOOSIC RIVER (Lat: 42.702567,  Lng: -73.111667),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 3,000 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: H 20,  Features Intersected: WATER N BR HOOSIC RIVER,  Facility Carried by Structure: HWY HOLDEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.402,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.9m (65.3ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.4m (53.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 82.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $249,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $374,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N1401001LMUNNBI,  Location: AT INT OF RIVER&CANAL ST (Lat: 42.701836,  Lng: -73.107789),  Route carried "on" structure: City street ,  Year Built: 1957,  Year Reconstructed: 2002,  Status: Open,  Structure Length: 1.60m (5.25ft),  Average Daily Traffic: 17,100 (year 2010),  Truck Traffic: 6%,  Average Future Daily Traffic: 27,006 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER N BR HOOSIC RIVER,  Facility Carried by Structure: HWY EAGLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.9m (48.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 17.2m (56.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 60.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $706,000,  Roadway Improvement Cost: $71,000,  Total Project Cost: $1,060,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N140110ECDOTNBI,  Location: 0.1 MI S OF ST 2 (Lat: 42.699703,  Lng: -73.114636),  Route carried "on" structure: City street ,  Year Built: 1959,  Status: Open,  Structure Length: 1.61m (5.28ft),  Average Daily Traffic: 729 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,106 (year 2032),  Design Load: H 20,  Features Intersected: WATER HOOSIC RIVER,  Facility Carried by Structure: HWY MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.8m (48.6ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.5m (54.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 64.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $56,000,  Roadway Improvement Cost: $6,000,  Total Project Cost: $85,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N140120AGDOTNBI,  Location: AT CANAL STREET (Lat: 42.700400,  Lng: -73.106653),  Route carried "on" structure: State highway 2,  Year Built: 1956,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 5,571 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 11,845 (year 2032),  Design Load: HS 15,  Features Intersected: WATER N BR HOOSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.022,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $935,000,  Roadway Improvement Cost: $94,000,  Total Project Cost: $1,403,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N140130AFDOTNBI,  Location: AT CLIFF STREET (Lat: 42.700228,  Lng: -73.102950),  Route carried "on" structure: State highway 2,  Year Built: 1958,  Year Reconstructed: 1983,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 8,000 (year 2019),  Truck Traffic: 14%,  Average Future Daily Traffic: 11,845 (year 2032),  Design Load: HS 15,  Features Intersected: WATER N BR HOOSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.312,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.6m (70.9ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 49.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,471,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $2,207,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N140140C5DOTNBI,  Location: 0.3 MI N OF ST 2 (Lat: 42.702661,  Lng: -73.090428),  Route carried "on" structure: State highway 8,  Year Built: 1954,  Status: Posted for load,  Structure Length: 4.02m (13.19ft),  Average Daily Traffic: 2,711 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,843 (year 2032),  Design Load: H 20,  Features Intersected: WATER N BR HOOSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.126,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 66.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,352,000,  Roadway Improvement Cost: $236,000,  Total Project Cost: $3,529,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: N140150C6DOTNBI,  Location: @ MCAULEY RD INTERSECTION (Lat: 42.704367,  Lng: -73.088819),  Route carried "on" structure: State highway 8,  Year Built: 1948,  Status: Open,  Structure Length: 2.94m (9.65ft),  Average Daily Traffic: 3,057 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 5,843 (year 2032),  Design Load: H 20,  Features Intersected: WATER N BR HOOSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 102.368,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.9m (88.3ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 15.5m (50.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 52.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,827,000,  Roadway Improvement Cost: $183,000,  Total Project Cost: $2,741,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N140160AKDOTNBI,  Location: 7.0 MI W OF FLORIDA TL (Lat: 42.698175,  Lng: -73.148117),  Route carried "on" structure: State highway 2,  Year Built: 1934,  Year Reconstructed: 1958,  Status: Temporarily open,  Structure Length: 5.52m (18.11ft),  Average Daily Traffic: 15,200 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 40,272 (year 2032),  Design Load: H 20,  Features Intersected: WATER HOOSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.498,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Very good,  Operating Rating: 46.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 6.60m (21.65ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Other Special Inspection Date: August 2021,  Bridge Improvement Cost: $6,776,000,  Roadway Improvement Cost: $678,000,  Total Project Cost: $10,165,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N140170AJDOTNBI,  Location: .1 MI E. OF ROBERTS DR (Lat: 42.698333,  Lng: -73.137778),  Route carried "on" structure: State highway 2,  Year Built: 1959,  Status: Open,  Structure Length: 9.97m (32.71ft),  Average Daily Traffic: 21,100 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 33,323 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HOOSIC RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.350,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Skew: 6 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 37.5m (123.0ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 38.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 22.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.00m (32.81ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $7,896,000,  Roadway Improvement Cost: $790,000,  Total Project Cost: $11,845,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: N140180DNDOT634,  Location: SOUTH OF RTE 2, RR422.49 (Lat: 42.697603,  Lng: -73.113806),  Route carried "on" structure: State highway 8,  Year Built: 1941,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 24.85m (81.53ft),  Average Daily Traffic: 15,373 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,479 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: COMB HOOSIC RIV & PARR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 99.278,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 6 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 13,  Length of Maximum Span: 48.8m (160.1ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 57.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 24.90m (81.69ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $2,818,000,  Roadway Improvement Cost: $282,000,  Total Project Cost: $4,228,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N140190BQDOTNBI,  Location: 0.2 MI E OF JCT W/ RTE 8 (Lat: 42.665169,  Lng: -73.103908),  Route carried "on" structure: State highway 8A,  Year Built: 1966,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 12,414 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 9,002 (year 2031),  Design Load: HS 20,  Features Intersected: WATER S BR HOOSIC RIVER,  Facility Carried by Structure: ST 8 A/HODGS CRSS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.301,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 65.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: September 2020,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $383,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $575,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N14020AX2MUNNBI,  Location: 0.1 MI N OF ROUTE 8 (Lat: 42.706431,  Lng: -73.090117),  Route carried "on" structure: City street ,  Year Built: 2003,  Status: Open,  Structure Length: 1.46m (4.79ft),  Average Daily Traffic: 120 (year 2015),  Truck Traffic: 1%,  Average Future Daily Traffic: 158 (year 2032),  Design Load: HS 20,  Features Intersected: WATER HUDSON BROOK,  Facility Carried by Structure: HWY MCAULEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: City or Municipal Highway Agency,  Maintenance Responsibility: State Park, Forest, or Reservation Agency,  Approaching Roadway Width: 4.8m (15.7ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 4.6m (15.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 67.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $1,337,000,  Roadway Improvement Cost: $134,000,  Total Project Cost: $2,006,000 ( Estimate for 2022),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N140250AHDOTNBI,  Location: JCT. W/BRAYTON HILL TERR. (Lat: 42.698358,  Lng: -73.137667),  Route carried "on" structure: State highway 2,  Year Built: 1959,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 25,216 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 23,690 (year 2032),  Features Intersected: WATER NOTCH BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.059,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $78,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $118,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N140260BRDOTNBI,  Location: .2 MI N OF WEST SHAFT RD (Lat: 42.676439,  Lng: -73.097461),  Route carried "on" structure: State highway 8A,  Year Built: 1953,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 6,357 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 14,214 (year 2033),  Design Load: H 20,  Features Intersected: WATER PHILLIPS CREEK,  Facility Carried by Structure: ST 8 A/CHURCH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.475,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 12.6m (41.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $347,000,  Roadway Improvement Cost: $35,000,  Total Project Cost: $521,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N140320DPDOT634,  Location: .25MI W OF ROUTE 8 422.77 (Lat: 42.700383,  Lng: -73.116764),  Route carried "on" structure: State highway 2,  Year Built: 1882,  Year Reconstructed: 1930,  Status: Open,  Structure Length: 3.96m (12.99ft),  Average Daily Traffic: 13,810 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 23,690 (year 2032),  Features Intersected: RR PARR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.177,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.8m (124.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.0m (42.7ft),  Out-to-Out Width: 16.0m (52.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 35.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.00m (13.12ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Bridge Improvement Cost: $2,514,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $3,772,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N1403901HMUNNBI,  Location: @ RT2/RT8 INTER.DOWNTOWN (Lat: 42.700378,  Lng: -73.114297),  Route carried "on" structure: State highway 2,  Year Built: 1959,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 17.13m (56.20ft),  Average Daily Traffic: 7,826 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,690 (year 2032),  Design Load: HS 20,  Features Intersected: COMB ST8 & HOOSIC RIV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.507,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 26.2m (86.0ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 19.9m (65.3ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 73.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 17.20m (56.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $13,445,000,  Roadway Improvement Cost: $1,345,000,  Total Project Cost: $20,168,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N1404001DMUNNBI,  Location: .3 MI SOUTH OF RTE 2 (Lat: 42.695264,  Lng: -73.135769),  Route carried "on" structure: City street ,  Year Built: 1960,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 1,450 (year 2011),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,290 (year 2032),  Design Load: H 20,  Features Intersected: WATER NOTCH BROOK,  Facility Carried by Structure: HWY NOTCH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.299,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 82.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $325,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $488,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N14042AY4DOTNBI,  Location: NORTH OF SONS OF ITALY (Lat: 42.696314,  Lng: -73.113514),  Route carried "on" structure: ServiceState lands road ,  Year Built: 1987,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 129 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 158 (year 2031),  Design Load: HS 20,  Features Intersected: WATER HOOSIC RIVER,  Facility Carried by Structure: HWY HRTG PRK DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.2m (56.4ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 6.5m (21.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,790,000,  Roadway Improvement Cost: $180,000,  Total Project Cost: $2,686,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: N1403901HMUNNBI,  Location: @ RT 2/8 INT DOWNTOWN (Lat: 42.700378,  Lng: -73.114297),  Route carried "under" structure: State highway 8,  Year Built: 1959,  Structure Length: 0. m,  Average Daily Traffic: 7,159 (year 2016),  Truck Traffic: 6%,  Features Intersected: COMB ST8 & HOOSIC RIV,  Facility Carried by Structure: ST 2 VTRNS MEM DR
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 99.860,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.2m (86.0ft)

Discuss North Adams, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.