Bridge Statistics for Natick, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 207ft / 63.1mTotal length
  • $49,488,000Total costs
  • 888,222Total average daily traffic
  • 44,419Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Natick
  • No street view available for this location

New bridges in Natick, MA - historical statistics
  • New bridges - historical statistics
  • 6Before 1900
  • 31900-1909
  • 31930-1939
  • 71950-1959
  • 101970-1979
  • 12000-2009
  • 12010-2019
  • 12020-2022
Reconstructed bridges in Natick, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11910-1919
  • 01920-1929
  • 01930-1939
  • 11940-1949
  • 01950-1959
  • 11960-1969
  • 01970-1979
  • 51980-1989
  • 31990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Natick, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 11.1%Good
  • 27.8%Satisfactory
  • 38.9%Fair
  • 5.6%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.0%Very good
  • 10.0%Good
  • 35.0%Satisfactory
  • 30.0%Fair
  • 10.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.0%Very good
  • 35.0%Good
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 25.0%Good
  • 50.0%Satisfactory
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Good
  • 50.0%Poor
Find on map >>   Show street view

Structure Number: N0300224QMUNNBI,  Location: .3MI S. OF STATE 16 (Lat: 42.269753,  Lng: -71.313872),  Route carried "on" structure: City street ,  Year Built: 1904,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 0.62m (2.03ft),  Average Daily Traffic: 13,247 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 19,583 (year 2032),  Design Load: HS 20,  Features Intersected: WATER SEWER CANAL,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.998,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 2.1m (6.9ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 14.2m (46.6ft)

Condition: Channel: Satisfactory,  Culverts: Poor,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $259,000,  Roadway Improvement Cost: $26,000,  Total Project Cost: $389,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N0300329TDOTNBI,  Location: 0.3 MI N RT 135 (Lat: 42.287219,  Lng: -71.337908),  Route carried "on" structure: City street ,  Year Built: 1896,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 6,100 (year 2012),  Truck Traffic: 3%,  Average Future Daily Traffic: 9,634 (year 2031),  Design Load: HL 93,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY MARION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N0300429RDOT634,  Location: .1 MI. E. OF ST-27 (Lat: 42.285828,  Lng: -71.346556),  Route carried "on" structure: City street ,  Year Built: 1895,  Year Reconstructed: 1987,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 1,300 (year 2014),  Truck Traffic: 4%,  Average Future Daily Traffic: 2,053 (year 2031),  Design Load: H 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 2.2m (7.2ft),  Right: 2.2m (7.2ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,430,000,  Roadway Improvement Cost: $144,000,  Total Project Cost: $2,146,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N0300629PDOT634,  Location: 0.2 MI. N. OF RT-135 (Lat: 42.285600,  Lng: -71.348061),  Route carried "on" structure: State highway 27,  Year Built: 1895,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 23,000 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 36,324 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 74.995,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 2.4m (7.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 19.0m (62.3ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 74.2 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.60m (8.53ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $195,000,  Roadway Improvement Cost: $20,000,  Total Project Cost: $293,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N0300829MDOT634,  Location: 0.4 MI SW OF RT 27 (Lat: 42.284953,  Lng: -71.352858),  Route carried "on" structure: City street ,  Year Built: 1895,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 2.05m (6.73ft),  Average Daily Traffic: 4,500 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 7,107 (year 2033),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY WASHNGTON AV
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.1m (62.7ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 57.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $1,089,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $1,634,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N0300929WDOT634,  Location: 0.2 MI.WST.OF ST.27 (Lat: 42.286053,  Lng: -71.350206),  Route carried "on" structure: City street ,  Year Built: 1896,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 1,300 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,053 (year 2031),  Design Load: HS 20,  Features Intersected: OTHER COCHITUATE RAIL TR,  Facility Carried by Structure: HWY COCHTUATE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.1m (36.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 45.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $691,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,037,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N0301029UDOT634,  Location: 0.1 MI NORTH OF RT 135 (Lat: 42.283811,  Lng: -71.375367),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1954,  Status: Open,  Structure Length: 3.29m (10.79ft),  Average Daily Traffic: 14,500 (year 2021),  Truck Traffic: 4%,  Average Future Daily Traffic: 25,901 (year 2033),  Design Load: H 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY SPEEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.770,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.3m (53.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 49.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.30m (10.83ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: December 2021,  Other Special Inspection Date: December 2021,  Bridge Improvement Cost: $2,113,000,  Roadway Improvement Cost: $212,000,  Total Project Cost: $3,170,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N0301129VDOT634,  Location: 0.1 MI N OF RT 135 (Lat: 42.283567,  Lng: -71.381036),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1968,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 7,930 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 12,524 (year 2032),  Design Load: H 20,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.9m (6.2ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 53.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,063,000,  Roadway Improvement Cost: $107,000,  Total Project Cost: $1,595,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N0301229LDOT634,  Location: 0.1 MI N OF RT 135 (Lat: 42.283169,  Lng: -71.391322),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Future Daily Traffic: 2,053 (year 2032),  Design Load: Pedestrian,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: OTHER PED@BODEN LN
Minimum Vertical Clearance: 2.26m (7.41ft),  Kilometerpoint: 0.161,  Owner: State Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.8m (65.0ft),  Curb-To-Curb Width: 2.3m (7.5ft),  Out-to-Out Width: 3.6m (11.8ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Critical Feature Inspection Date: January 2021,  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: N0301624RMUNNBI,  Location: .1 MI SOUTH OF ST. 16 (Lat: 42.271742,  Lng: -71.315200),  Route carried "on" structure: City street ,  Year Built: 1861,  Year Reconstructed: 1910,  Status: Open,  Structure Length: 3.44m (11.29ft),  Average Daily Traffic: 9,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 14,214 (year 2032),  Features Intersected: WATER CHARLES RIVER,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.336,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.8m (25.6ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 67.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2021,  Underwater Inspection Date: May 2021,  Bridge Improvement Cost: $1,848,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $2,773,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: N0302028QDOTNBI,  Location: AT JCT OF RTES 9 & 27 (Lat: 42.299989,  Lng: -71.359931),  Route carried "on" structure: State highway 27,  Year Built: 1931,  Status: Open,  Structure Length: 3.00m (9.84ft),  Average Daily Traffic: 28,000 (year 2014),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,220 (year 2033),  Design Load: H 20,  Features Intersected: ST 9 WORCESTER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 77.584,  Lanes on structure: 3,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 13.7m (44.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.1m (52.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 79.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $1,961,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $2,942,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N030218RGDOTNBI,  Location: 0.6 MI W OF JCT RTE 9 &27 (Lat: 42.298819,  Lng: -71.372481),  Route carried "on" structure: State highway 9,  Year Built: 2007,  Status: Open,  Structure Length: 1.63m (5.35ft),  Average Daily Traffic: 74,031 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 99,496 (year 2032),  Design Load: HS 20,  Features Intersected: WATER LAKE COCHITUATE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.311,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 21.4m (70.2ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.3m (50.2ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 21.4m (70.2ft),  Out-to-Out Width: 27.5m (90.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 76.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $113,000,  Roadway Improvement Cost: $12,000,  Total Project Cost: $170,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N030267Q0MUNNBI,  Location: @ ST.135 AND SPEEN ST (Lat: 42.282278,  Lng: -71.375922),  Route carried "on" structure: City street ,  Year Built: 2011,  Status: Open,  Structure Length: 0.68m (2.23ft),  Average Daily Traffic: 14,500 (year 2000),  Design Load: HS 20,  Features Intersected: WATER FISKE POND,  Facility Carried by Structure: HWY SPEEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.7m (25.3ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.1m (10.2ft),  Curb or Sidewalk Widths: Left: 2.3m (7.5ft),  Right: 0.0m,  Curb-To-Curb Width: 7.7m (25.3ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: September 2020,  Underwater Inspection Date: November 2018,  Bridge Improvement Cost: $386,000,  Roadway Improvement Cost: $39,000,  Total Project Cost: $580,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: N03032278DOTNBI,  Location: 0.9 MI WEST RTS 27 & 9 (Lat: 42.299381,  Lng: -71.379394),  Route carried "on" structure: Ramp State highway ,  Year Built: 1977,  Status: Open,  Structure Length: 4.18m (13.71ft),  Average Daily Traffic: 8,200 (year 2013),  Truck Traffic: 10%,  Average Future Daily Traffic: 12,950 (year 2032),  Design Load: HS 20,  Features Intersected: ST 9 & RAMP A,  Facility Carried by Structure: HWY RAMP B
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.6m (34.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 61.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,749,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $2,624,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: N03033291DOTNBI,  Location: 0.9 MI W OF RT 27 (Lat: 42.299364,  Lng: -71.379067),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Temporarily open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 20,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 31,586 (year 2032),  Design Load: HS 20,  Features Intersected: ST 9 & RAMP A,  Facility Carried by Structure: HWY SPEEN ST SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.220,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 15.8m (51.8ft),  Curb or Sidewalk Widths: Left: 2.4m (7.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.7m (51.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 67.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.10m (16.73ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $3,146,000,  Roadway Improvement Cost: $315,000,  Total Project Cost: $4,720,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Cathodic Protection
Find on map >>   Show street view

Structure Number: N03034292DOTNBI,  Location: 0.8 MI WEST RTS 9 & 27 (Lat: 42.298750,  Lng: -71.376944),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 3.18m (10.43ft),  Average Daily Traffic: 15,000 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 23,690 (year 2032),  Design Load: HS 20,  Features Intersected: HWY RAMPS D & G,  Facility Carried by Structure: HWY SPEEN ST NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.220,  Lanes on structure: 2,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 42.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,509,000,  Roadway Improvement Cost: $151,000,  Total Project Cost: $2,264,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N03035293DOTNBI,  Location: 0.8 MI W OF RT-27 (Lat: 42.299344,  Lng: -71.376697),  Route carried "on" structure: City street ,  Year Built: 1977,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 21,600 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 34,113 (year 2032),  Design Load: HS 20,  Features Intersected: ST 9 WORCESTER ST,  Facility Carried by Structure: HWY SPEEN ST NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Skew: 8 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 14.6m (47.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: November 2021,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $1,924,000,  Roadway Improvement Cost: $193,000,  Total Project Cost: $2,887,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N030364PQDOTNBI,  Location: .5 MI. E. OF SPEEN ST. (Lat: 42.311267,  Lng: -71.374294),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 15,000 (year 2014),  Truck Traffic: 12%,  Average Future Daily Traffic: 23,690 (year 2031),  Design Load: H 20,  Features Intersected: I 90,  Facility Carried by Structure: ST 30 COMM RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 188.771,  Lanes on structure: 2,  Lanes under structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 29.2m (95.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 48.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $6,222,000,  Roadway Improvement Cost: $623,000,  Total Project Cost: $9,334,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N030374PUDOTNBI,  Location: 117.9 MM RT. 90 (Lat: 42.314356,  Lng: -71.360614),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 67,087 (year 2018),  Truck Traffic: 15%,  Average Future Daily Traffic: 105,813 (year 2032),  Design Load: HS 20,  Features Intersected: ST 27 N MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.736,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.0m (65.6ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,500,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $5,251,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N030374PVDOTNBI,  Location: I-90 MM 117.9 (Lat: 42.314461,  Lng: -71.360808),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 4.45m (14.60ft),  Average Daily Traffic: 47,529 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 105,813 (year 2032),  Design Load: HS 20,  Features Intersected: ST 27 N MAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 189.736,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 18.9m (62.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.0m (65.6ft),  Curb-To-Curb Width: 18.9m (62.0ft),  Out-to-Out Width: 19.8m (65.0ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.50m (14.76ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,500,000,  Roadway Improvement Cost: $351,000,  Total Project Cost: $5,251,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: N030384PRDOTNBI,  Location: I-90 MILE MARKER 119.8 (Lat: 42.328494,  Lng: -71.329392),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 94,069 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 98,706 (year 2032),  Design Load: HS 20,  Features Intersected: HWY INDIAN ROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.794,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.9m (29.2ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 79.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $214,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N030384PTDOTNBI,  Location: I-90 MM 119.8 (Lat: 42.328700,  Lng: -71.329386),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 0.99m (3.25ft),  Average Daily Traffic: 47,529 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 98,706 (year 2032),  Design Load: HS 20,  Features Intersected: HWY INDIAN ROCK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 192.794,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Highway Agency,  Approaching Roadway Width: 16.9m (55.4ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.9m (29.2ft),  Curb-To-Curb Width: 16.9m (55.4ft),  Out-to-Out Width: 18.4m (60.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 80.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $142,000,  Roadway Improvement Cost: $15,000,  Total Project Cost: $214,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: N0302028QDOTNBI,  Location: RT 27 AT RT 9 (Lat: 42.300000,  Lng: -71.366667),  Route carried "under" structure: State highway 9,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 0000),  Features Intersected: ST 9 EB,  Facility Carried by Structure: ST 27
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: N0302028QDOTNBI,  Location: RT 27 AT RT 9 (Lat: 42.300000,  Lng: -71.366667),  Route carried "under" structure: State highway 9,  Year Built: 1931,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 0000),  Features Intersected: ST 9 WB,  Facility Carried by Structure: ST 27
Minimum Vertical Clearance: 4.29m (14.07ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.7m (44.9ft)

Find on map >>   Show street view

Structure Number: N03032278DOTNBI,  Location: 0.9 MI WEST RTS 27 & 9 (Lat: 42.283333,  Lng: -71.383333),  Route carried "under" structure: State highway 9,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 0000),  Features Intersected: ST 9 EB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: N03032278DOTNBI,  Location: 0.9 MI WEST RTS 27 & 9 (Lat: 42.300000,  Lng: -71.383333),  Route carried "under" structure: Ramp State highway 9,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 30,000 (year 0000),  Features Intersected: ST 9 WB
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.0m (36.1ft)

Find on map >>   Show street view

Structure Number: N03033291DOTNBI,  Location: 000079 STATUTORY (Lat: 42.300000,  Lng: -71.383333),  Route carried "under" structure: State highway 9,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 35,000 (year 0000),  Features Intersected: ST 9 EB,  Facility Carried by Structure: HWY SPEEN ST SB
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: N03033291DOTNBI,  Location: 000079 STATUTORY (Lat: 42.300000,  Lng: -71.383333),  Route carried "under" structure: State highway 9,  Year Built: 1977,  Structure Length: 0. m,  Average Daily Traffic: 35,000 (year 0000),  Features Intersected: ST 9 WB,  Facility Carried by Structure: HWY SPEEN ST SB
Minimum Vertical Clearance: 5.38m (17.65ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 15.8m (51.8ft)

Find on map >>   Show street view

Structure Number: N03035293DOTNBI,  Location: 000079 STATUTORY (Lat: 42.300000,  Lng: -71.383333),  Route carried "under" structure: State highway 9,  Year Built: 1978,  Structure Length: 0. m,  Average Daily Traffic: 35,000 (year 0000),  Features Intersected: ST 9 EB,  Facility Carried by Structure: HWY SPEEN ST NB
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: N03035293DOTNBI,  Location: 000079 STATUTORY (Lat: 42.300000,  Lng: -71.383333),  Route carried "under" structure: State highway 9,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 35,000 (year 0000),  Features Intersected: ST 9 WB,  Facility Carried by Structure: HWY SPEEN ST SB
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.6m (47.9ft)

Find on map >>   Show street view

Structure Number: N030364PQDOTNBI,  Location: AT MILE 117.3 (Lat: 42.316667,  Lng: -71.383333),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 47,400 (year 0000),  Features Intersected: I 90 WB,  Facility Carried by Structure: ST 30 COMM RD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 188.771,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)

Find on map >>   Show street view

Structure Number: N030364PQDOTNBI,  Location: AT MILE 117.3 (Lat: 42.316667,  Lng: -71.383333),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 47,400 (year 0000),  Features Intersected: I 90 EB,  Facility Carried by Structure: ST 30 COMM RD
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 188.771,  Lanes on structure: 3,  Lanes under structure: 2,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.4m (89.9ft)