Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Marianna, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 30Number of bridges
  • 482ft / 147mTotal length
  • 264,602Total average daily traffic
  • 49,395Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Marianna
  • No street view available for this location

New bridges in Marianna, FL - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 11950-1959
  • 31960-1969
  • 151970-1979
  • 11980-1989
  • 51990-1999
  • 42000-2009
Average Bridge Daily Traffic in Marianna, FL
Average Bridge Truck Traffic in Marianna, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 36.8%Good
  • 63.2%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.5%Very good
  • 47.4%Good
  • 31.6%Satisfactory
  • 5.3%Fair
  • 5.3%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.3%Very good
  • 57.9%Good
  • 31.6%Satisfactory
  • 5.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 14.3%Very good
  • 28.6%Good
  • 42.9%Satisfactory
  • 7.1%Fair
  • 7.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 530005,  Location: 0.6Mi. East of SR73 (Lat: 30.773044,  Lng: -85.215961),  Route carried "on" structure: US 90,  Year Built: 1943,  Year Reconstructed: 1957,  Status: Open,  Structure Length: 13.32m (43.70ft),  Average Daily Traffic: 22,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 38,170 (year 2042),  Design Load: HS 20,  Features Intersected: Chipola River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.972,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 20 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 18,  Length of Maximum Span: 12.5m (41.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 20.7m (67.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Underwater Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 530013,  Location: 1.5 Miles North of SR166 (Lat: 30.832992,  Lng: -85.208572),  Route carried "on" structure: County highway 167,  Year Built: 1972,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 4,337 (year 2039),  Design Load: HS 20,  Features Intersected: Unnamed Branch
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.464,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020
Find on map >>   Show street view

Structure Number: 530022,  Location: 6.9 Mi East of US231/SR75 (Lat: 30.871233,  Lng: -85.255606),  Route carried "on" structure: County highway 162,  Year Built: 1963,  Status: Open,  Structure Length: 12.19m (39.99ft),  Average Daily Traffic: 1,350 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,480 (year 2040),  Design Load: H 15,  Features Intersected: Chipola River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.100,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 16,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 29.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Underwater Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530025,  Location: 1.1 Miles West of SR 71 (Lat: 30.719092,  Lng: -85.202569),  Route carried "on" structure: County highway 280,  Year Built: 1968,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 725 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 797 (year 2039),  Design Load: HS 20,  Features Intersected: Chipola River Relief
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 8.866,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.4m (27.6ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 52.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530041,  Location: 1.6 Mi South of I10/SR8 (Lat: 30.717497,  Lng: -85.200308),  Route carried "on" structure: County highway 280,  Year Built: 1968,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 472 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 519 (year 2039),  Design Load: H 20,  Features Intersected: Chipola River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.101,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 0.4m (1.3ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Underwater Inspection Date: Febuary 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530052,  Location: 1.0 Miles West of SR71 (Lat: 30.724622,  Lng: -85.200100),  Route carried "on" structure: Interstate 10,  Year Built: 1976,  Status: Open,  Structure Length: 9.78m (32.09ft),  Average Daily Traffic: 9,850 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 17,090 (year 2042),  Design Load: HS 20,  Features Intersected: Chipola River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.3m (53.5ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530053,  Location: 1.0 Miles West of SR71 (Lat: 30.724353,  Lng: -85.200000),  Route carried "on" structure: Interstate 10,  Year Built: 1976,  Status: Open,  Structure Length: 9.75m (31.99ft),  Average Daily Traffic: 9,850 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 17,090 (year 2042),  Design Load: HS 20,  Features Intersected: Chipola River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 23.197,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 16.3m (53.5ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 77.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530054,  Location: 2.0Mi S of Marianna limit (Lat: 30.732756,  Lng: -85.230225),  Route carried "on" structure: State highway 73,  Year Built: 1975,  Status: Open,  Structure Length: 8.53m (27.99ft),  Average Daily Traffic: 5,000 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 8,675 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: I10 SR8
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.287,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 30.2m (99.1ft),  Curb-To-Curb Width: 13.3m (43.6ft),  Out-to-Out Width: 14.1m (46.3ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530055,  Location: 2.87Mi W of SR73 (Lat: 30.753417,  Lng: -85.272983),  Route carried "on" structure: Interstate 10,  Year Built: 1976,  Status: Open,  Structure Length: 7.30m (23.95ft),  Average Daily Traffic: 9,850 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 17,090 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SR276
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.487,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.3m (76.4ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530056,  Location: 2.87MI W of SR73 (Lat: 30.753153,  Lng: -85.272853),  Route carried "on" structure: Interstate 10,  Year Built: 1976,  Status: Open,  Structure Length: 7.29m (23.92ft),  Average Daily Traffic: 9,850 (year 2020),  Truck Traffic: 38%,  Average Future Daily Traffic: 17,090 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SR276
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.487,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 23.4m (76.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530063,  Location: 1.5 miles S of US90 SR10 (Lat: 30.736483,  Lng: -85.185236),  Route carried "on" structure: State highway 71,  Year Built: 1980,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 7,750 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,446 (year 2042),  Design Load: HS 20,  Features Intersected: FG&A RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.969,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Other
Find on map >>   Show street view

Structure Number: 530066,  Location: 0.9Mi E. of Chipola River (Lat: 30.721525,  Lng: -85.185464),  Route carried "on" structure: Interstate 10,  Year Built: 1976,  Status: Open,  Structure Length: 6.66m (21.85ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 17,350 (year 2042),  Design Load: HS 20,  Features Intersected: SR71
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.639,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530067,  Location: 0.9Mi E. of Chipola River (Lat: 30.721281,  Lng: -85.185528),  Route carried "on" structure: Interstate 10,  Year Built: 1976,  Status: Open,  Structure Length: 6.66m (21.85ft),  Average Daily Traffic: 10,000 (year 2020),  Truck Traffic: 33%,  Average Future Daily Traffic: 17,350 (year 2042),  Design Load: HS 20,  Features Intersected: SR71
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 24.639,  Lanes on structure: 2,  Lanes under structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 69.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530085,  Location: 0.5 Mi. West of SR276 (Lat: 30.756631,  Lng: -85.280453),  Route carried "on" structure: County highway ,  Year Built: 1979,  Status: Open,  Structure Length: 7.74m (25.39ft),  Average Daily Traffic: 2,200 (year 2012),  Truck Traffic: 14%,  Average Future Daily Traffic: 3,817 (year 2034),  Design Load: HS 20,  Features Intersected: I10 SR8,  Facility Carried by Structure: New Hope Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.752,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.7m (127.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530115,  Location: 1.5 Mi S. of US90 (SR10) (Lat: 30.735889,  Lng: -85.185389),  Route carried "on" structure: State highway 71,  Year Built: 1999,  Status: Open,  Structure Length: 5.30m (17.39ft),  Average Daily Traffic: 7,750 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 13,446 (year 2042),  Design Load: HS 20,  Features Intersected: FG&A RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.969,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.7m (58.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.5m (37.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 67.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530117,  Location: 0.7mi North of I10 SR8 (Lat: 30.730444,  Lng: -85.185083),  Route carried "on" structure: State highway 71,  Year Built: 1999,  Status: Open,  Structure Length: 1.60m (5.25ft),  Average Daily Traffic: 15,500 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 26,892 (year 2042),  Design Load: HS 20,  Features Intersected: Bridge Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.389,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 3.8m (12.5ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020
Find on map >>   Show street view

Structure Number: 53017,  Location: 1.4 Mi. N of US90 SR10 (Lat: 30.792939,  Lng: -85.221317),  Route carried "on" structure: State highway 166,  Year Built: 2002,  Status: Open,  Structure Length: 19.51m (64.01ft),  Average Daily Traffic: 9,000 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,615 (year 2042),  Design Load: HS 20,  Features Intersected: Chipola River
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.125,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.0m,  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.1m (49.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 56.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Underwater Inspection Date: September 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530184,  Location: 0.5Mi West of SR71 (Lat: 30.753097,  Lng: -85.193342),  Route carried "on" structure: US 90,  Year Built: 2007,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 9,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,090 (year 2042),  Design Load: HS 20,  Features Intersected: Merritts Mill Pond
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.276,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Inventory Rating: 56.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 530185,  Location: 0.5Mi W of SR71 (Lat: 30.753189,  Lng: -85.193164),  Route carried "on" structure: US 90,  Year Built: 2006,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 9,850 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 17,090 (year 2042),  Design Load: HS 20,  Features Intersected: Merritts Mill Pond
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.276,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 56.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 534001,  Location: 0.6 Miles West of SR 73 (Lat: 30.725417,  Lng: -85.241089),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 1.02m (3.35ft),  Average Daily Traffic: 110 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 120 (year 2040),  Features Intersected: Long Branch,  Facility Carried by Structure: Thompson Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.947,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.9m (22.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Poor,  Culverts: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Other Special Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 534015,  Location: 1.2 Mi W of Bump Nose Rd (Lat: 30.852583,  Lng: -85.287100),  Route carried "on" structure: Other road ,  Year Built: 1991,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 44 (year 2020),  Average Future Daily Traffic: 48 (year 2040),  Design Load: HS 20,  Features Intersected: Baker Creek,  Facility Carried by Structure: Baker Creek Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Underwater Inspection Date: May 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 534163,  Location: 1.17 Miles South of CR162 (Lat: 30.860839,  Lng: -85.265614),  Route carried "on" structure: Other road ,  Year Built: 1995,  Status: Open,  Structure Length: 4.58m (15.03ft),  Average Daily Traffic: 94 (year 2019),  Average Future Daily Traffic: 163 (year 2039),  Features Intersected: Waddells Mill Creek,  Facility Carried by Structure: Bump Nose Road
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.658,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 10.4m (34.1ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 530004,  Location: 0.1 Mile West of SR73 N. (Lat: 30.785525,  Lng: -85.258431),  Route carried "under" structure: US 90,  Year Built: 1958,  Structure Length: 0. m,  Average Daily Traffic: 6,100 (year 2018),  Truck Traffic: 7%,  Features Intersected: US90 SR10,  Facility Carried by Structure: FGA RR
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 19.204,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 530054,  Location: 2.0Mi S of Marianna limit (Lat: 30.732756,  Lng: -85.230225),  Route carried "under" structure: Interstate 10,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 19,700 (year 2020),  Truck Traffic: 38%,  Features Intersected: I10 SR8,  Facility Carried by Structure: SR73
Minimum Vertical Clearance: 4.82m (15.81ft),  Kilometerpoint: 20.159,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.2m (99.1ft)

Find on map >>   Show street view

Structure Number: 530055,  Location: 2.87Mi W of SR73 (Lat: 30.753417,  Lng: -85.272983),  Route carried "under" structure: State highway 276,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 8,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR276,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.57m (14.99ft),  Kilometerpoint: 11.570,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.3m (76.4ft)

Find on map >>   Show street view

Structure Number: 530056,  Location: 2.87MI W of SR73 (Lat: 30.753153,  Lng: -85.272853),  Route carried "under" structure: State highway 276,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 8,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR276,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.79m (15.72ft),  Kilometerpoint: 11.603,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.4m (76.8ft)

Find on map >>   Show street view

Structure Number: 530066,  Location: 0.9Mi E. of Chipola River (Lat: 30.721525,  Lng: -85.185464),  Route carried "under" structure: State highway 71,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: SR71,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 13.322,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 530067,  Location: 0.9Mi E. of Chipola River (Lat: 30.721281,  Lng: -85.185528),  Route carried "under" structure: State highway 71,  Year Built: 1976,  Structure Length: 0. m,  Average Daily Traffic: 19,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: SR71,  Facility Carried by Structure: I10 SR8
Minimum Vertical Clearance: 4.63m (15.19ft),  Kilometerpoint: 13.293,  Lanes on structure: 2,  Lanes under structure: 5,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.3m (73.2ft)

Find on map >>   Show street view

Structure Number: 530085,  Location: 0.5 Mi. West of SR276 (Lat: 30.756631,  Lng: -85.280453),  Route carried "under" structure: Interstate 10,  Year Built: 1979,  Structure Length: 0. m,  Average Daily Traffic: 21,607 (year 2020),  Truck Traffic: 30%,  Features Intersected: I10 SR8,  Facility Carried by Structure: New Hope Road
Minimum Vertical Clearance: 4.91m (16.11ft),  Kilometerpoint: 14.693,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.7m (127.0ft)

Find on map >>   Show street view

Structure Number: 539001,  Location: 1.0 mi. North of I10 SR8 (Lat: 30.760483,  Lng: -85.258764),  Route carried "under" structure: State highway 276,  Year Built: 2001,  Structure Length: 0. m,  Average Daily Traffic: 8,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: SR276,  Facility Carried by Structure: PedestrianOverpass
Minimum Vertical Clearance: 4.94m (16.21ft),  Kilometerpoint: 13.161,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.4m (86.6ft)

Discuss Marianna, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.