Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mango, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 318ft / 96.5mTotal length
  • $9,000Total costs
  • 1,473,200Total average daily traffic
  • 171,715Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mango
  • No street view available for this location

New bridges in Mango, FL - historical statistics
  • New bridges - historical statistics
  • 11930-1939
  • 241980-1989
Reconstructed bridges in Mango, FL - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Mango, FL
Average Bridge Truck Traffic in Mango, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 91.7%Good
  • 8.3%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Very good
  • 66.7%Good
  • 8.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 100024,  Location: 0.9 MI EAST OF I-75 (Lat: 27.999939,  Lng: -82.312225),  Route carried "on" structure: US 92,  Year Built: 1930,  Year Reconstructed: 1943,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 12,400 (year 2021),  Truck Traffic: 13%,  Average Future Daily Traffic: 21,514 (year 2041),  Design Load: H 15,  Features Intersected: KENNEDY HILL CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.723,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.9m (32.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 33.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 26.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100394,  Location: I-75 & I-4 INTERCHANGE (Lat: 28.002100,  Lng: -82.326925),  Route carried "on" structure: Interstate 75,  Year Built: 1984,  Status: Open,  Structure Length: 14.50m (47.57ft),  Average Daily Traffic: 74,500 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,258 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-4 AND RAMP C-1
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.530,  Lanes on structure: 3,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.2m (56.4ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 30.8m (101.0ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 49.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100414,  Location: 0.4MI SOUTH OF I-4(SR400) (Lat: 27.997108,  Lng: -82.326775),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 5.77m (18.93ft),  Average Daily Traffic: 74,500 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,258 (year 2041),  Features Intersected: US-92 (SR-600)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.039,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.9m (62.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.58m (1.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $8,000,  Roadway Improvement Cost: $1,000,  Total Project Cost: $9,000,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100415,  Location: 0.4MI SOUTH OF I-4(SR400) (Lat: 27.997183,  Lng: -82.326381),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 5.77m (18.93ft),  Average Daily Traffic: 74,500 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,258 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US-92 (SR-600)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.042,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 19.5m (64.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 32.3m (106.0ft),  Curb-To-Curb Width: 19.5m (64.0ft),  Out-to-Out Width: 20.6m (67.6ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 49.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100417,  Location: I-4 & I-75 INTERCHANGE (Lat: 27.999850,  Lng: -82.326692),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 5.09m (16.70ft),  Average Daily Traffic: 74,500 (year 2021),  Truck Traffic: 12%,  Average Future Daily Traffic: 129,258 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-4 EB TO I-75 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 43.356,  Lanes on structure: 3,  Lanes under structure: 1,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.0m (55.8ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 28.6m (93.8ft),  Curb-To-Curb Width: 17.0m (55.8ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100422,  Location: 0.4MI SOUTH OF I-4 (Lat: 27.997281,  Lng: -82.325892),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 6.25m (20.51ft),  Average Daily Traffic: 18,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 32,098 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: US-92 (SR-600)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.066,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.0m (114.8ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 59.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 51.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100423,  Location: I-4 & I-75 INTERCHANGE (Lat: 28.002303,  Lng: -82.324831),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1984,  Status: Open,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 17,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 30,362 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: I-4 & RAMP I75SB TO I4EB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Skew: 9 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 52.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100427,  Location: 2.3MI EAST OF US-301 (Lat: 27.981297,  Lng: -82.326367),  Route carried "on" structure: State highway 574,  Year Built: 1984,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 38,500 (year 2022),  Truck Traffic: 6%,  Average Future Daily Traffic: 66,798 (year 2042),  Design Load: HL 93,  Features Intersected: I-75 (SR-93)
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.555,  Lanes on structure: 5,  Lanes under structure: 7,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.4m (76.8ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 44.0m (144.4ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 28.1m (92.2ft),  Out-to-Out Width: 31.1m (102.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Very good,  Operating Rating: 47.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100428,  Location: I-4 & I-75 INTERCHANGE (Lat: 28.002219,  Lng: -82.325894),  Route carried "on" structure: Ramp Interstate 75,  Year Built: 1984,  Status: Open,  Structure Length: 9.68m (31.76ft),  Average Daily Traffic: 11,500 (year 2021),  Truck Traffic: 9%,  Average Future Daily Traffic: 19,952 (year 2041),  Design Load: HL 93,  Features Intersected: I-4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.529,  Lanes on structure: 1,  Lanes under structure: 7,  Owner: State Highway Agency,  Approaching Roadway Width: 8.3m (27.2ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 8.3m (27.2ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 35.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100429,  Location: 0.4MI NORTH OF US-92 (Lat: 28.003194,  Lng: -82.319056),  Route carried "on" structure: County highway ,  Year Built: 1984,  Status: Open,  Structure Length: 7.91m (25.95ft),  Average Daily Traffic: 2,600 (year 2021),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,511 (year 2041),  Design Load: HS 20,  Features Intersected: RAMP A-1 & I-4,  Facility Carried by Structure: WILLIAMS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.224,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 9.3m (30.5ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 33.0m (108.3ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Inventory Rating: 67.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100435,  Location: 3.1MI N OF SR-60 (Lat: 27.973169,  Lng: -82.326528),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 10.98m (36.02ft),  Average Daily Traffic: 70,750 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 122,751 (year 2041),  Design Load: HS 20,  Features Intersected: CR-574 AND CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.356,  Lanes on structure: 3,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.8m (91.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 100436,  Location: 3.1MI N OF SR-60 (Lat: 27.973164,  Lng: -82.326181),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 10.98m (36.02ft),  Average Daily Traffic: 70,750 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 122,751 (year 2041),  Features Intersected: CR-574 & CSX RR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.361,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 27.8m (91.2ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 18.0m (59.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 76.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Deck Structure Type: Concrete Precast Panels
Find on map >>   Show street view

Structure Number: 100437,  Location: 0.1MI SOUTH OF CR-574 (Lat: 27.973986,  Lng: -82.326333),  Route carried "on" structure: Interstate 75,  Year Built: 1983,  Status: Open,  Structure Length: 0.77m (2.53ft),  Average Daily Traffic: 141,500 (year 2021),  Truck Traffic: 7%,  Average Future Daily Traffic: 245,502 (year 2041),  Design Load: HS 20+Mod,  Features Intersected: MANGO LAKE DRAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 40.520,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 32.9m (107.9ft),  Skew: 11 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.6m (11.8ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021
Find on map >>   Show street view

Structure Number: 100394,  Location: I-75 & I-4 INTERCHANGE (Lat: 28.002100,  Lng: -82.326925),  Route carried "under" structure: Ramp Interstate 4,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 13,500 (year 2021),  Truck Traffic: 9%,  Features Intersected: I-4 AND RAMP C-1,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 6.89m (22.60ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 100394,  Location: I-75 & I-4 INTERCHANGE (Lat: 28.002100,  Lng: -82.326925),  Route carried "under" structure: Interstate 4,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 130,000 (year 2021),  Truck Traffic: 16%,  Features Intersected: I-4 AND RAMP C-1,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 7.25m (23.79ft),  Kilometerpoint: 25.585,  Lanes on structure: 3,  Lanes under structure: 6,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 30.8m (101.0ft)

Find on map >>   Show street view

Structure Number: 100414,  Location: 0.4MI SOUTH OF I-4(SR400) (Lat: 27.997108,  Lng: -82.326775),  Route carried "under" structure: US 92,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2021),  Truck Traffic: 13%,  Features Intersected: US-92 (SR-600),  Facility Carried by Structure: I-75 SB (SR-93A)
Minimum Vertical Clearance: 5.58m (18.31ft),  Kilometerpoint: 12.252,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 100415,  Location: 0.4MI SOUTH OF I-4(SR400) (Lat: 27.997183,  Lng: -82.326381),  Route carried "under" structure: US 92,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2021),  Truck Traffic: 13%,  Features Intersected: US-92 (SR-600),  Facility Carried by Structure: I-75 NB (SR-93A)
Minimum Vertical Clearance: 6.04m (19.82ft),  Kilometerpoint: 12.294,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.3m (106.0ft)

Find on map >>   Show street view

Structure Number: 100417,  Location: I-4 & I-75 INTERCHANGE (Lat: 27.999850,  Lng: -82.326692),  Route carried "under" structure: Ramp Interstate 4,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 11,500 (year 2021),  Truck Traffic: 9%,  Features Intersected: I-4 EB TO I-75 NB,  Facility Carried by Structure: I-75 NB (SR-93A)
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 1,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.6m (93.8ft)

Find on map >>   Show street view

Structure Number: 100422,  Location: 0.4MI SOUTH OF I-4 (Lat: 27.997281,  Lng: -82.325892),  Route carried "under" structure: US 92,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 12,400 (year 2021),  Truck Traffic: 13%,  Features Intersected: US-92 (SR-600),  Facility Carried by Structure: I-75 NB TO I-4 EB
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 12.348,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.0m (114.8ft)

Find on map >>   Show street view

Structure Number: 100423,  Location: I-4 & I-75 INTERCHANGE (Lat: 28.002303,  Lng: -82.324831),  Route carried "under" structure: Interstate 4,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 130,000 (year 2021),  Truck Traffic: 16%,  Features Intersected: I-4 & RAMP I75SB TO I4EB
Minimum Vertical Clearance: 5.12m (16.80ft),  Kilometerpoint: 25.825,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 38.4m (126.0ft)

Find on map >>   Show street view

Structure Number: 100427,  Location: 2.3MI EAST OF US-301 (Lat: 27.981297,  Lng: -82.326367),  Route carried "under" structure: Interstate 75,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 141,500 (year 2022),  Truck Traffic: 7%,  Features Intersected: I-75 (SR-93),  Facility Carried by Structure: SR-574 (MLK BLVD)
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 41.228,  Lanes on structure: 5,  Lanes under structure: 7,  Material/Design: Prestressed concrete continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 44.0m (144.4ft)

Find on map >>   Show street view

Structure Number: 100428,  Location: I-4 & I-75 INTERCHANGE (Lat: 28.002219,  Lng: -82.325894),  Route carried "under" structure: Interstate 4,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 130,000 (year 2021),  Truck Traffic: 16%,  Features Intersected: I-4
Minimum Vertical Clearance: 5.24m (17.19ft),  Kilometerpoint: 25.724,  Lanes on structure: 1,  Lanes under structure: 7,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 47.2m (154.9ft)

Find on map >>   Show street view

Structure Number: 100429,  Location: 0.4MI NORTH OF US-92 (Lat: 28.003194,  Lng: -82.319056),  Route carried "under" structure: Interstate 4,  Year Built: 1984,  Structure Length: 0. m,  Average Daily Traffic: 154,500 (year 2021),  Truck Traffic: 10%,  Features Intersected: RAMP A-1 & I-4,  Facility Carried by Structure: WILLIAMS ROAD
Minimum Vertical Clearance: 5.27m (17.29ft),  Kilometerpoint: 26.366,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.0m (108.3ft)

Find on map >>   Show street view

Structure Number: 100435,  Location: 3.1MI N OF SR-60 (Lat: 27.973169,  Lng: -82.326528),  Route carried "under" structure: County highway 574,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 21,500 (year 2021),  Truck Traffic: 30%,  Features Intersected: CR-574 AND CSX RR,  Facility Carried by Structure: I-75 SB
Minimum Vertical Clearance: 8.11m (26.61ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.8m (91.2ft)

Find on map >>   Show street view

Structure Number: 100436,  Location: 3.1MI N OF SR-60 (Lat: 27.973164,  Lng: -82.326181),  Route carried "under" structure: County highway 574,  Year Built: 1983,  Structure Length: 0. m,  Average Daily Traffic: 21,500 (year 2021),  Truck Traffic: 30%,  Features Intersected: CR-574 & CSX RR,  Facility Carried by Structure: I-75 NB
Minimum Vertical Clearance: 8.23m (27.00ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.8m (91.2ft)

Discuss Mango, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.