Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Longview, Washington (WA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 492ft / 150mTotal length
  • $103,460,000Total costs
  • 126,100Total average daily traffic
  • 9,366Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Longview
  • No street view available for this location

New bridges in Longview, WA - historical statistics
  • New bridges - historical statistics
  • 11940-1949
  • 21950-1959
  • 71960-1969
  • 51970-1979
  • 12010-2019
Average Bridge Daily Traffic in Longview, WA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 15.4%Very good
  • 61.5%Good
  • 23.1%Satisfactory
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 15.4%Very good
  • 53.8%Good
  • 30.8%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.4%Very good
  • 38.5%Good
  • 46.2%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 41.7%Very good
  • 50.0%Good
  • 8.3%Satisfactory
Find on map >>   Show street view

Structure Number: 6321A,  Location: 2.0 E JCT SR 411 (Lat: 46.106914,  Lng: -122.894419),  Route carried "on" structure: State highway 432,  Year Built: 1961,  Year Reconstructed: 1971,  Status: Open,  Structure Length: 51.08m (167.59ft),  Average Daily Traffic: 17,791 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,768 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COWLITZ R & NP RY
Minimum Vertical Clearance: 5.11m (16.77ft),  Kilometerpoint: 15.418,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Navigation Control: Yes ( Vertical Clearance: 12.8m (42.0ft), Horizontal Clearance: 85.3m (279.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 91.4m (299.9ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 51.08m (167.59ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $12,738,000,  Roadway Improvement Cost: $2,548,000,  Total Project Cost: $25,475,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 6697A,  Location: 1.5 E JCT SR 433 (Lat: 46.123044,  Lng: -122.926578),  Route carried "on" structure: State highway 432,  Year Built: 1961,  Status: Open,  Structure Length: 9.11m (29.89ft),  Average Daily Traffic: 8,283 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,066 (year 2039),  Design Load: HS 20,  Features Intersected: 3RD AVE / SR 411
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.295,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 31.1m (102.0ft),  Curb-To-Curb Width: 13.6m (44.6ft),  Out-to-Out Width: 14.6m (47.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 30.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.11m (29.89ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: April 2018,  Bridge Improvement Cost: $2,751,000,  Roadway Improvement Cost: $550,000,  Total Project Cost: $5,502,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 7399A,  Location: 9.3 E WAHKIAKUM CO (Lat: 46.178139,  Lng: -123.030833),  Route carried "on" structure: State highway 4,  Year Built: 1964,  Status: Open,  Structure Length: 5.43m (17.81ft),  Average Daily Traffic: 5,545 (year 2019),  Truck Traffic: 9%,  Average Future Daily Traffic: 7,408 (year 2039),  Design Load: HS 20,  Features Intersected: COAL CR SL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 88.482,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 25.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 19.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.43m (17.81ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: October 2021,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $1,068,000,  Roadway Improvement Cost: $214,000,  Total Project Cost: $2,136,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: 9100A,  Location: 2.0 E JCT SR 411 (Lat: 46.107106,  Lng: -122.894400),  Route carried "on" structure: State highway 432,  Year Built: 1973,  Status: Open,  Structure Length: 52.70m (172.90ft),  Average Daily Traffic: 17,791 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 23,768 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: COWLITZ RIVER & BNSF
Minimum Vertical Clearance: 5.89m (19.32ft),  Kilometerpoint: 15.418,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Navigation Control: Yes ( Vertical Clearance: 19.2m (63.0ft), Horizontal Clearance: 85.3m (279.9ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 12,  Length of Maximum Span: 91.4m (299.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.5m (41.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 57.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 52.70m (172.90ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Critical Feature Inspection Date: April 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $17,982,000,  Roadway Improvement Cost: $3,596,000,  Total Project Cost: $35,963,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 9874A,  Location: 1.5 E JCT SR 433 (Lat: 46.123222,  Lng: -122.926667),  Route carried "on" structure: State highway 432,  Year Built: 1975,  Status: Open,  Structure Length: 8.47m (27.79ft),  Average Daily Traffic: 8,283 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 11,066 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: SR 411/3RD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.295,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Number Of Approach Spans: 2,  Length of Maximum Span: 33.5m (109.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 48.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.47m (27.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,335,000,  Roadway Improvement Cost: $467,000,  Total Project Cost: $4,670,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 200111,  Location: 2.8 E JCT SR 4 (Lat: 46.146983,  Lng: -123.002900),  Route carried "on" structure: State highway 432,  Year Built: 1961,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 6,332 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 8,459 (year 2039),  Design Load: HS 20,  Features Intersected: SOLO SLOUGH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.490,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 7 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 89.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 48 months,  Inspection Date: September 2018,  Bridge Improvement Cost: $156,000,  Roadway Improvement Cost: $31,000,  Total Project Cost: $313,000 ( Estimate for 2014)
Find on map >>   Show street view

Structure Number: 81066,  Location: 0.35 NW COAL CRK RD (0.54 (Lat: 46.186667,  Lng: -123.036111),  Route carried "on" structure: County highway 21810,  Year Built: 1953,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 2,253 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 3,180 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: COAL CREEK,  Facility Carried by Structure: HARMONY DR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 84.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,018,000,  Roadway Improvement Cost: $204,000,  Total Project Cost: $2,037,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 83587,  Location: 0.06 N COAL CRK RD (2.47) (Lat: 46.206111,  Lng: -123.019444),  Route carried "on" structure: County highway 22570,  Year Built: 1976,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 257 (year 2017),  Truck Traffic: 7%,  Average Future Daily Traffic: 550 (year 2039),  Design Load: HS 20,  Features Intersected: COAL CREEK,  Facility Carried by Structure: CARLON LOOP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.8m (110.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.81m (12.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,900,000,  Roadway Improvement Cost: $380,000,  Total Project Cost: $3,800,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 83602,  Location: 0.30 N COAL CRK RD (5.04) (Lat: 46.238056,  Lng: -123.043889),  Route carried "on" structure: County highway 22830,  Year Built: 1975,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 38 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 55 (year 2039),  Design Load: HS 20,  Features Intersected: COAL CREEK EAST FORK,  Facility Carried by Structure: HACKETT RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.19m (3.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $593,000,  Roadway Improvement Cost: $119,000,  Total Project Cost: $1,186,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 83632,  Location: 0.07 S COAL CRK RD (3.62) (Lat: 46.220833,  Lng: -123.021389),  Route carried "on" structure: County highway 22570,  Year Built: 1963,  Status: Open,  Structure Length: 2.50m (8.20ft),  Average Daily Traffic: 88 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 125 (year 2039),  Design Load: HS 15,  Features Intersected: COAL CREEK,  Facility Carried by Structure: CARLON LOOP RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.1m (0.3ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 31.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 19.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,398,000,  Roadway Improvement Cost: $280,000,  Total Project Cost: $2,797,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 8543,  Location: 0.32 NE SR 4 (MP 56.75) (Lat: 46.167833,  Lng: -122.996361),  Route carried "on" structure: City street 6751,  Year Built: 1955,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 2,750 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 3,700 (year 2038),  Design Load: H 15,  Features Intersected: CUTOFF SLOUGH,  Facility Carried by Structure: 46TH AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.7m (22.0ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.29m (7.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $1,140,000,  Roadway Improvement Cost: $228,000,  Total Project Cost: $2,280,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 85506,  Location: LOUISIANA ST. & LAKE SAC. (Lat: 46.142500,  Lng: -122.952028),  Route carried "on" structure: City street 65,  Year Built: 1967,  Status: Open,  Structure Length: 2.44m (8.01ft),  Average Daily Traffic: 8,100 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,900 (year 2041),  Design Load: HS 20,  Features Intersected: LAKE SACAJAWEA,  Facility Carried by Structure: LOUISIANA ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.44m (8.01ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $608,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,216,000 ( Estimate for 2014),  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 85584,  Location: JCT 20th AVE. & LAKE SACA (Lat: 46.130250,  Lng: -122.947000),  Route carried "on" structure: City street 20,  Year Built: 1940,  Status: Posted for load,  Structure Length: 4.97m (16.31ft),  Average Daily Traffic: 3,133 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 3,846 (year 2032),  Design Load: H 15,  Features Intersected: LAKE SACAJAWEA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 9.8m (32.2ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 35.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 5.27m (17.29ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2021,  Underwater Inspection Date: March 2017,  Bridge Improvement Cost: $2,630,000,  Roadway Improvement Cost: $526,000,  Total Project Cost: $5,259,000 ( Estimate for 2014),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 88791,  Location: BETWEEN NICHOLS & KESSLER (Lat: 46.133889,  Lng: -122.951944),  Route carried "on" structure: City street 62,  Year Built: 2015,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 9,950 (year 2013),  Truck Traffic: 5%,  Average Future Daily Traffic: 18,000 (year 2035),  Design Load: HL 93,  Features Intersected: LAKE SACAJAWEA,  Facility Carried by Structure: WASHINGTON WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.001,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 17.4m (57.1ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 46.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.69m (15.39ft),  Designated Inspection Frequency: Every 48 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: March 2019,  Underwater Inspection Date: March 2017,  Bridge Improvement Cost: $5,413,000,  Roadway Improvement Cost: $1,083,000,  Total Project Cost: $10,826,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 6697A,  Location: JCT SR 432 (Lat: 46.123044,  Lng: -122.926578),  Route carried "under" structure: State highway 411,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 17,753 (year 2019),  Truck Traffic: 15%,  Features Intersected: 3RD AVE / SR 411,  Facility Carried by Structure: SR 432
Minimum Vertical Clearance: 7.29m (23.92ft),  Kilometerpoint: 12.247,  Lanes on structure: 3,  Lanes under structure: 4,  Material/Design: Concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 31.1m (102.0ft)

Find on map >>   Show street view

Structure Number: 9874A,  Location: JCT SR 432 (Lat: 46.123222,  Lng: -122.926667),  Route carried "under" structure: State highway 411,  Year Built: 1975,  Structure Length: 0. m,  Average Daily Traffic: 17,753 (year 2019),  Truck Traffic: 15%,  Features Intersected: SR 411/3RD AVE,  Facility Carried by Structure: SR 432
Minimum Vertical Clearance: 7.59m (24.90ft),  Kilometerpoint: 0.001,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.5m (109.9ft)

Discuss Longview, Washington (WA) on our hugely popular Washington forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.