Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Lake Magdalene, Florida (FL)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 32Number of bridges
  • 354ft / 108mTotal length
  • 792,905Total average daily traffic
  • 78,294Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Lake Magdalene
  • No street view available for this location

New bridges in Lake Magdalene, FL - historical statistics
  • New bridges - historical statistics
  • 11970-1979
  • 21980-1989
  • 281990-1999
  • 12000-2009
Average Bridge Daily Traffic in Lake Magdalene, FL
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.6%Very good
  • 94.4%Good
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 61.1%Very good
  • 38.9%Good
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 5.6%Very good
  • 94.4%Good
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 83.3%Good
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 10055,  Location: 0.4MI S OF CR-765 (Lat: 26.887689,  Lng: -82.020275),  Route carried "on" structure: US 41,  Year Built: 1981,  Status: Open,  Structure Length: 5.55m (18.21ft),  Average Daily Traffic: 6,550 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 11,364 (year 2042),  Design Load: HS 20,  Features Intersected: ALLIGATOR CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 15.841,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 75.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 10056,  Location: 1MI NORTH OF CR-765 (Lat: 26.902169,  Lng: -82.034211),  Route carried "on" structure: US 41,  Year Built: 1981,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 13,250 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 22,989 (year 2042),  Design Load: HS 20,  Features Intersected: OYSTER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.965,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Underwater Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10055,  Location: 0.2 MI NORTH OF GUNN HWY (Lat: 28.068847,  Lng: -82.565750),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 27,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,712 (year 2042),  Design Load: HL 93,  Features Intersected: ROCKY CREEK II
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.822,  Lanes on structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 28.0m (91.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 28.4m (93.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Operating Rating: 46.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100551,  Location: 0.2 MI NORTH OF GUNN HWY (Lat: 28.068700,  Lng: -82.565553),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 9.14m (29.99ft),  Average Daily Traffic: 27,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,712 (year 2042),  Design Load: HL 93,  Features Intersected: ROCKY CREEK II
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.822,  Lanes on structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 24.3m (79.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 24.3m (79.7ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Fair,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100552,  Location: 0.5 MI S OF BELLAMY RD (Lat: 28.078653,  Lng: -82.562397),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 27,500 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,712 (year 2042),  Design Load: HL 93,  Features Intersected: EHRLICH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.987,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.2m (69.6ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.4m (208.0ft),  Curb-To-Curb Width: 21.2m (69.6ft),  Out-to-Out Width: 21.9m (71.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100553,  Location: 0.5 MI S OF BELLAMY RD (Lat: 28.078639,  Lng: -82.562164),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 6.34m (20.80ft),  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,936 (year 2042),  Design Load: HL 93,  Features Intersected: EHRLICH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.995,  Lanes on structure: 3,  Lanes under structure: 5,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 22.3m (73.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 63.4m (208.0ft),  Curb-To-Curb Width: 22.3m (73.2ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 53.9 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100554,  Location: 0.5 MI N OF EHRLICH RD (Lat: 28.084517,  Lng: -82.558383),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,936 (year 2042),  Design Load: HL 93,  Features Intersected: BELLAMY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.775,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100555,  Location: 0.5 MI N OF EHRLICH RD (Lat: 28.084297,  Lng: -82.558342),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 2.80m (9.19ft),  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,936 (year 2042),  Design Load: HL 93,  Features Intersected: BELLAMY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.763,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.3m (69.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 21.3m (69.9ft),  Out-to-Out Width: 22.3m (73.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 41.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100556,  Location: 1.5 MI N OF EHRLICH ROAD (Lat: 28.092197,  Lng: -82.545258),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,936 (year 2042),  Design Load: HL 93,  Features Intersected: RAWLS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.441,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 45.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100557,  Location: 1.5 MI N OF EHRLICH ROAD (Lat: 28.092158,  Lng: -82.545039),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.57m (14.99ft),  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,936 (year 2042),  Design Load: HL 93,  Features Intersected: RAWLS RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.449,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 20.8m (68.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 43.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100558,  Location: 1.9 MI N OF EHRLICH ROAD (Lat: 28.097819,  Lng: -82.542817),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 8.61m (28.25ft),  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,794 (year 2042),  Design Load: HL 93,  Features Intersected: HUTCHISON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.090,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 21.0m (68.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 21.0m (68.9ft),  Out-to-Out Width: 21.8m (71.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100559,  Location: 1.9 MI N OF EHRLICH ROAD (Lat: 28.097558,  Lng: -82.542678),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 8.44m (27.69ft),  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 44,936 (year 2042),  Design Load: HL 93,  Features Intersected: HUTCHISON RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.072,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 20.8m (68.2ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 27.3m (89.6ft),  Curb-To-Curb Width: 20.8m (68.2ft),  Out-to-Out Width: 21.7m (71.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 47.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 10056,  Location: 1.6MI N OF SUGARWOOD TOLL (Lat: 28.106614,  Lng: -82.542900),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.32m (24.02ft),  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,794 (year 2042),  Design Load: HL 93,  Features Intersected: HATTON WILCOX RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.110,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.1m (115.2ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 23.3m (76.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 41.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100561,  Location: 1.6MI N OF SUGARWOOD TOLL (Lat: 28.106514,  Lng: -82.542567),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 7.06m (23.16ft),  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,794 (year 2042),  Design Load: HL 93,  Features Intersected: HATTON WILCOX RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 18.086,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 22.6m (74.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 33.7m (110.6ft),  Curb-To-Curb Width: 22.6m (74.1ft),  Out-to-Out Width: 24.7m (81.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 41.5 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100562,  Location: 2.2MI N OF SUGARWOOD TOLL (Lat: 28.113969,  Lng: -82.546178),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,794 (year 2042),  Design Load: HL 93,  Features Intersected: LAKE LECLARE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 20.9m (68.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100563,  Location: 2.2MI N OF SUGARWOOD TOLL (Lat: 28.113944,  Lng: -82.545925),  Route carried "on" structure: State highway 589,  Year Built: 1994,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 4.30m (14.11ft),  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,794 (year 2042),  Design Load: HL 93,  Features Intersected: LAKE LECLARE RD.
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 19.000,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 20.9m (68.6ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 20.9m (68.6ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor (LRFR),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor (LRFR),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 100624,  Location: 2.8MI N OF SUGARWOOD TOLL (Lat: 28.122069,  Lng: -82.546275),  Route carried "on" structure: State highway 589,  Year Built: 1999,  Status: Open,  Structure Length: 11.50m (37.73ft),  Average Daily Traffic: 20,000 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 34,700 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: SUNCOAST PARKWAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Toll: On toll road,  Owner: State Toll Authority,  Approaching Roadway Width: 13.5m (44.3ft),  Skew: 9 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 64.3m (211.0ft),  Curb-To-Curb Width: 13.5m (44.3ft),  Out-to-Out Width: 14.4m (47.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 58.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 104208,  Location: 0.4 MI S OF FLETCHER AV (Lat: 28.056061,  Lng: -82.500572),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.93m (3.05ft),  Average Daily Traffic: 5,240 (year 2021),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,550 (year 2041),  Design Load: H 15,  Features Intersected: SWEETWATER CREEK,  Facility Carried by Structure: ORANGE GROVE DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.3m (20.7ft),  Material/Design: Prestressed concrete,  Design/Construction: Channel Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.3m (30.5ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 47.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 104291,  Location: 0.7MI S OF BEARSS AVE (Lat: 28.073733,  Lng: -82.500317),  Route carried "on" structure: County highway ,  Year Built: 2001,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 2,565 (year 2021),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,027 (year 2041),  Design Load: HS 20,  Features Intersected: MAGDALENE CANAL,  Facility Carried by Structure: EHRLICH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.3m (20.7ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021
Find on map >>   Show street view

Structure Number: 100552,  Location: 0.5 MI S OF BELLAMY RD (Lat: 28.078653,  Lng: -82.562397),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: EHRLICH RD,  Facility Carried by Structure: SR 589 VET SB 10.2
Minimum Vertical Clearance: 5.82m (19.09ft),  Kilometerpoint: 1.561,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 63.4m (208.0ft)

Find on map >>   Show street view

Structure Number: 100553,  Location: 0.5 MI S OF BELLAMY RD (Lat: 28.078639,  Lng: -82.562164),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 23,000 (year 2020),  Truck Traffic: 9%,  Features Intersected: EHRLICH RD,  Facility Carried by Structure: SR 589 VET NB 10.2
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 1.593,  Lanes on structure: 3,  Lanes under structure: 5,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 63.4m (208.0ft)

Find on map >>   Show street view

Structure Number: 100554,  Location: 0.5 MI N OF EHRLICH RD (Lat: 28.084517,  Lng: -82.558383),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Features Intersected: BELLAMY RD,  Facility Carried by Structure: SR 589 VET SB 10.7
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 14.779,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 100555,  Location: 0.5 MI N OF EHRLICH RD (Lat: 28.084297,  Lng: -82.558342),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Features Intersected: BELLAMY RD,  Facility Carried by Structure: SR 589 VET NB 10.7
Minimum Vertical Clearance: 5.21m (17.09ft),  Kilometerpoint: 14.766,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 28.0m (91.9ft)

Find on map >>   Show street view

Structure Number: 100556,  Location: 1.5 MI N OF EHRLICH ROAD (Lat: 28.092197,  Lng: -82.545258),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Features Intersected: RAWLS RD.,  Facility Carried by Structure: SR 589 VET SB 11.6
Minimum Vertical Clearance: 5.06m (16.60ft),  Kilometerpoint: 16.407,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 100557,  Location: 1.5 MI N OF EHRLICH ROAD (Lat: 28.092158,  Lng: -82.545039),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Features Intersected: RAWLS RD.,  Facility Carried by Structure: SR 589 VET NB 11.6
Minimum Vertical Clearance: 4.98m (16.34ft),  Kilometerpoint: 16.402,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)

Find on map >>   Show street view

Structure Number: 100558,  Location: 1.9 MI N OF EHRLICH ROAD (Lat: 28.097819,  Lng: -82.542817),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: HUTCHISON RD.,  Facility Carried by Structure: SR 589 VET SB 11.9
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 17.059,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.7m (90.9ft)

Find on map >>   Show street view

Structure Number: 100559,  Location: 1.9 MI N OF EHRLICH ROAD (Lat: 28.097558,  Lng: -82.542678),  Route carried "under" structure: City street ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 25,900 (year 2020),  Truck Traffic: 10%,  Features Intersected: HUTCHISON RD.,  Facility Carried by Structure: SR 589 VET NB 11.9
Minimum Vertical Clearance: 5.16m (16.93ft),  Kilometerpoint: 17.027,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 27.3m (89.6ft)

Find on map >>   Show street view

Structure Number: 10056,  Location: 1.6MI N OF SUGARWOOD TOLL (Lat: 28.106614,  Lng: -82.542900),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: HATTON WILCOX RD.,  Facility Carried by Structure: SR 589 VET SB 12.6
Minimum Vertical Clearance: 5.36m (17.59ft),  Kilometerpoint: 18.110,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.1m (115.2ft)

Find on map >>   Show street view

Structure Number: 100561,  Location: 1.6MI N OF SUGARWOOD TOLL (Lat: 28.106514,  Lng: -82.542567),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: HATTON WILCOX RD.,  Facility Carried by Structure: SR 589 VET NB 12.6
Minimum Vertical Clearance: 5.94m (19.49ft),  Kilometerpoint: 18.089,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 33.7m (110.6ft)

Find on map >>   Show street view

Structure Number: 100562,  Location: 2.2MI N OF SUGARWOOD TOLL (Lat: 28.113969,  Lng: -82.546178),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: LAKE LECLARE RD.,  Facility Carried by Structure: SR 589 VET SB 13.2
Minimum Vertical Clearance: 5.43m (17.81ft),  Kilometerpoint: 19.003,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 100563,  Location: 2.2MI N OF SUGARWOOD TOLL (Lat: 28.113944,  Lng: -82.545925),  Route carried "under" structure: County highway ,  Year Built: 1994,  Structure Length: 0. m,  Average Daily Traffic: 28,700 (year 2020),  Truck Traffic: 10%,  Features Intersected: LAKE LECLARE RD.,  Facility Carried by Structure: SR589 VET NB 13.2
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 19.003,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Find on map >>   Show street view

Structure Number: 100624,  Location: 2.8MI N OF SUGARWOOD TOLL (Lat: 28.122069,  Lng: -82.546275),  Route carried "under" structure: State highway 589,  Year Built: 1999,  Structure Length: 0. m,  Average Daily Traffic: 44,900 (year 2020),  Truck Traffic: 10%,  Features Intersected: SUNCOAST PARKWAY
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 19.922,  Lanes on structure: 2,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 64.3m (211.0ft)

Discuss Lake Magdalene, Florida (FL) on our hugely popular Florida forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.