Bridge Statistics for Greenfield, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 39ft / 12.2mTotal length
  • $6,966,000Total costs
  • 26,789Total average daily traffic
  • 825Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenfield
  • No street view available for this location

New bridges in Greenfield, NY - historical statistics
  • New bridges - historical statistics
  • 61930-1939
  • 11950-1959
  • 21960-1969
  • 22010-2019
Reconstructed bridges in Greenfield, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 21990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Greenfield, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 33.3%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 11.1%Satisfactory
  • 11.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 33.3%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 22.2%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 55.6%Good
  • 33.3%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 62.5%Good
  • 25.0%Satisfactory
  • 12.5%Fair
Find on map >>   Show street view

Structure Number: 100669,  Location: RTE 9N 2.3 MI N GRNFLD C (Lat: 43.158683,  Lng: -73.858558),  Route carried "on" structure: State highway 9N,  Year Built: 2016,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 4,522 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,822 (year 2040),  Design Load: HL 93,  Features Intersected: KAYADEROSSERAS CK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 11.971,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $419,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $664,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 220272,  Location: 4.5 MI NW SARATOGA SPRING (Lat: 43.150681,  Lng: -73.888203),  Route carried "on" structure: Other road ,  Year Built: 1960,  Year Reconstructed: 2001,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 350 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 490 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: S BR KAYADEROSSERAS CR,  Facility Carried by Structure: ALLEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.846,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.0m (29.5ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $397,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $630,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 225999,  Location: CITY OF SARATOGA SPRINGS (Lat: 43.100186,  Lng: -73.792217),  Route carried "on" structure: Other road ,  Year Built: 1957,  Status: Open,  Structure Length: 1.31m (4.30ft),  Average Daily Traffic: 2,957 (year 2017),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,140 (year 2037),  Features Intersected: DELAWARE & HUDSON,  Facility Carried by Structure: CLINTON STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.579,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.31m (4.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $750,000,  Roadway Improvement Cost: $439,000,  Total Project Cost: $1,189,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 330416,  Location: .5 MI SW MIDDLE GROVE (Lat: 43.085194,  Lng: -73.922900),  Route carried "on" structure: County highway ,  Year Built: 1930,  Year Reconstructed: 2018,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 2,555 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 3,577 (year 2039),  Design Load: HL 93,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: CR21MIDDLE GRV RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.213,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Operating Rating: 78.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $610,000,  Roadway Improvement Cost: $357,000,  Total Project Cost: $968,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33042,  Location: 3.5 MI E LAKE DESOLATION (Lat: 43.137983,  Lng: -73.877639),  Route carried "on" structure: Other road ,  Year Built: 1931,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 658 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 921 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: BOCKES ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.6m (34.8ft),  Curb-To-Curb Width: 7.2m (23.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $432,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 330453,  Location: 2.0 MI W GREENFIELD CTR (Lat: 43.126156,  Lng: -73.891936),  Route carried "on" structure: County highway ,  Year Built: 1937,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,354 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 1,896 (year 2037),  Design Load: HS 20,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: COUNTY ROAD 19
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.940,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $195,000,  Total Project Cost: $527,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330454,  Location: 3.3 ML N ROCK CITY FALLS (Lat: 43.108061,  Lng: -73.906353),  Route carried "on" structure: Other road ,  Year Built: 1967,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 517 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 724 (year 2037),  Design Load: H 20,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: SAND HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.092,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 9.8m (32.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Operating Rating: 74.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $526,000,  Roadway Improvement Cost: $308,000,  Total Project Cost: $833,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330455,  Location: .5 MI NW MIDDLE GROVE (Lat: 43.091489,  Lng: -73.921356),  Route carried "on" structure: County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 967 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,354 (year 2037),  Design Load: H 20,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: CR12 L DESOLA RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.354,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Good,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $547,000,  Roadway Improvement Cost: $320,000,  Total Project Cost: $867,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 336418,  Location: 4 MI NW SARATOGA SPRINGS (Lat: 43.166969,  Lng: -73.855256),  Route carried "on" structure: County highway ,  Year Built: 1938,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 1,006 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,408 (year 2038),  Design Load: HS 20,  Features Intersected: KAYADEROSSERAS CK,  Facility Carried by Structure: SPIER FALLS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.531,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Satisfactory,  Inventory Rating: 74.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $540,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $856,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 700667,  Location: 3.1 MI NW JCT RTS 9 & 9N (Lat: 43.100283,  Lng: -73.839014),  Route carried "under" structure: State highway 9N,  Year Built: 1934,  Structure Length: 0. m,  Average Daily Traffic: 7,368 (year 2000),  Features Intersected: RTE 9N,  Facility Carried by Structure: DELAWARE & HUDSON
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 3.894,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 11.2m (36.7ft)

Find on map >>   Show street view

Structure Number: 700668,  Location: RTE 9N 1.9 MI N GRNFLD C (Lat: 43.152722,  Lng: -73.855156),  Route carried "under" structure: State highway 9N,  Year Built: 1939,  Structure Length: 0. m,  Average Daily Traffic: 4,535 (year 1998),  Features Intersected: RTE 9N,  Facility Carried by Structure: DELAWARE & HUDSON
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 10.346,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Length of Maximum Span: 20.4m (66.9ft)