Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Greenfield, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 276ft / 84.5mTotal length
  • $79,090,000Total costs
  • 229,540Total average daily traffic
  • 20,080Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Greenfield
  • No street view available for this location

New bridges in Greenfield, MA - historical statistics
  • New bridges - historical statistics
  • 2Before 1900
  • 21910-1919
  • 11940-1949
  • 21950-1959
  • 111960-1969
  • 11980-1989
Reconstructed bridges in Greenfield, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Greenfield, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.7%Very good
  • 30.8%Good
  • 23.1%Satisfactory
  • 7.7%Fair
  • 15.4%Poor
  • 15.4%Serious
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 25.0%Good
  • 25.0%Satisfactory
  • 31.3%Fair
  • 18.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 18.8%Good
  • 43.8%Satisfactory
  • 31.3%Fair
  • 6.3%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 42.9%Good
  • 42.9%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: G120010LKMUNNBI,  Location: JCT OF RIVERSIDE DR (Lat: 42.590947,  Lng: -72.615428),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1933,  Status: Open,  Structure Length: 1.81m (5.94ft),  Average Daily Traffic: 5,200 (year 2003),  Truck Traffic: 6%,  Average Future Daily Traffic: 8,212 (year 2032),  Features Intersected: WATER GREEN RIVER,  Facility Carried by Structure: HWY COLRAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.1m (59.4ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.3m (30.5ft)

Condition: Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $695,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,043,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: G120070UGDOTNBI,  Location: 100' E JCT RIVER ST. (Lat: 42.585769,  Lng: -72.612044),  Route carried "on" structure: Alternate State highway 2,  Year Built: 1957,  Status: Open,  Structure Length: 4.20m (13.78ft),  Average Daily Traffic: 12,396 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,647 (year 2031),  Design Load: H 20,  Features Intersected: WATER GREEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.697,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 40.5m (132.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Serious,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 60.0 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.30m (14.11ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: May 2020,  Other Special Inspection Date: November 2021,  Bridge Improvement Cost: $3,159,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $4,739,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete
Find on map >>   Show street view

Structure Number: G120130Q9MUNNBI,  Location: AT JCT OF DFLD ST (Lat: 42.580400,  Lng: -72.599419),  Route carried "on" structure: City street ,  Year Built: 1917,  Status: Open,  Structure Length: 2.74m (8.99ft),  Average Daily Traffic: 1,121 (year 2013),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,084 (year 2032),  Features Intersected: WATER GREEN RIVER,  Facility Carried by Structure: HWY MERIDIAN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 11.2m (36.7ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,232,000,  Roadway Improvement Cost: $124,000,  Total Project Cost: $1,849,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: G120140LMMUNNBI,  Location: 0.5 MI E INT ST 2A (Lat: 42.583536,  Lng: -72.605031),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 3.77m (12.37ft),  Average Daily Traffic: 14,483 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,190 (year 2032),  Design Load: H 20,  Features Intersected: WATER GREEN RIVER,  Facility Carried by Structure: HWY MILL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.885,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 36.6m (120.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.8m (48.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 69.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.80m (12.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $646,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: G12020134DOTNBI,  Location: AT GRNFIELD-MONTAGUE T.L. (Lat: 42.580617,  Lng: -72.579486),  Route carried "on" structure: City street ,  Year Built: 1947,  Status: Closed,  Structure Length: 23.51m (77.13ft),  Average Daily Traffic: 14,100 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 30,638 (year 2032),  Design Load: H 20,  Features Intersected: WATER CONNECTICUT RIVER,  Facility Carried by Structure: HWY MTGUE CTY RD
Minimum Vertical Clearance: 4.49m (14.73ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 2,  Length of Maximum Span: 121.3m (398.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Serious,  Superstructure: Poor,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 38.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 23.30m (76.44ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2021,  Critical Feature Inspection Date: May 2021,  Underwater Inspection Date: September 2020,  Bridge Improvement Cost: $20,504,000,  Roadway Improvement Cost: $2,051,000,  Total Project Cost: $30,757,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: G12021142DOT634,  Location: OVER RR (Lat: 42.596936,  Lng: -72.605381),  Route carried "on" structure: City street ,  Year Built: 1850,  Year Reconstructed: 2003,  Status: Open,  Structure Length: 0.97m (3.18ft),  Average Daily Traffic: 8,276 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 15,521 (year 2032),  Design Load: HL 93,  Features Intersected: RR BMRR,  Facility Carried by Structure: HWY ALLEN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.064,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.7m (28.5ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 57.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $557,000,  Roadway Improvement Cost: $56,000,  Total Project Cost: $836,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: G12023141DOT634,  Location: 100' W JCT CHAPMAN ST. (Lat: 42.587875,  Lng: -72.602733),  Route carried "on" structure: Alternate State highway 2,  Year Built: 1847,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 29,483 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 21,647 (year 2031),  Features Intersected: RR PANAM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 20.1m (65.9ft),  Skew: 1 degrees,  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 4.2m (13.8ft),  Right: 4.2m (13.8ft),  Curb-To-Curb Width: 20.1m (65.9ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Superstructure: Poor,  Substructure: Good,  Operating Rating: 82.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 82.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: May 2020,  Other Special Inspection Date: May 2021,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,684,000 ( Estimate for 2022),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: G12036143DOT634,  Location: .3 M E JCT CONWAY ST. (Lat: 42.606486,  Lng: -72.606067),  Route carried "on" structure: City street ,  Year Built: 1951,  Status: Posted for load,  Structure Length: 1.83m (6.00ft),  Average Daily Traffic: 14,483 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 17,530 (year 2032),  Design Load: H 20,  Features Intersected: RR BMRR,  Facility Carried by Structure: HWY SILVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.2m (56.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Operating Rating: 36.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $1,359,000,  Roadway Improvement Cost: $136,000,  Total Project Cost: $2,039,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: G1204811XDOTNBI,  Location: MM 43.6 ON I-91 (Lat: 42.593303,  Lng: -72.618661),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 8.10m (26.57ft),  Average Daily Traffic: 13,319 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 10,739 (year 2032),  Design Load: H 20,  Features Intersected: I 91,  Facility Carried by Structure: HWY COLRAIN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 28.1m (92.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 43.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.20m (26.90ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,994,000,  Roadway Improvement Cost: $400,000,  Total Project Cost: $5,992,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: G120490XMDOTNBI,  Location: MM 44.2 ON I-91 NB (Lat: 42.602528,  Lng: -72.614961),  Route carried "on" structure: Interstate 91,  Year Built: 1962,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 5.66m (18.57ft),  Average Daily Traffic: 11,779 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 34,745 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER GREEN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 71.292,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.6m (41.3ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.3m (83.0ft),  Curb-To-Curb Width: 12.6m (41.3ft),  Out-to-Out Width: 13.6m (44.6ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 76.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.70m (18.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $3,045,000,  Roadway Improvement Cost: $305,000,  Total Project Cost: $4,568,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: G120520XRDOTNBI,  Location: MM 45.1 ON I-91 NB (Lat: 42.611514,  Lng: -72.603428),  Route carried "on" structure: Interstate 91,  Year Built: 1962,  Status: Temporarily open,  Structure Length: 6.08m (19.95ft),  Average Daily Traffic: 12,266 (year 2019),  Truck Traffic: 12%,  Average Future Daily Traffic: 14,135 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RR PAN AM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.676,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.7m (74.5ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Operating Rating: 52.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: April 2020,  Other Special Inspection Date: April 2021,  Bridge Improvement Cost: $5,544,000,  Roadway Improvement Cost: $555,000,  Total Project Cost: $8,317,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Membrane: Built-up
Find on map >>   Show street view

Structure Number: G120560XQDOTNBI,  Location: MM 45.0 ON I-91 SB (Lat: 42.610014,  Lng: -72.607000),  Route carried "on" structure: Interstate 91,  Year Built: 1964,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 31,085 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 37,114 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 72.418,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 11 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.2m (10.5ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $668,000,  Roadway Improvement Cost: $67,000,  Total Project Cost: $1,003,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: G12057139DOTNBI,  Location: MM 42.1 ON I-91 (Lat: 42.572567,  Lng: -72.620597),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 9.83m (32.25ft),  Average Daily Traffic: 1,681 (year 2016),  Average Future Daily Traffic: 3,001 (year 2031),  Design Load: H 20,  Features Intersected: I 91,  Facility Carried by Structure: HWY WISDOM WAY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 25.2m (82.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 54.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 9.90m (32.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $4,823,000,  Roadway Improvement Cost: $483,000,  Total Project Cost: $7,235,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: G120580XEDOTNBI,  Location: MM 42.6 ON I-91 NB (Lat: 42.579361,  Lng: -72.620972),  Route carried "on" structure: Interstate 91,  Year Built: 1964,  Year Reconstructed: 2007,  Status: Open,  Structure Length: 6.47m (21.23ft),  Average Daily Traffic: 14,700 (year 2017),  Truck Traffic: 10%,  Average Future Daily Traffic: 24,972 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR PAN AM
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.556,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 12.4m (40.7ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Very good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 61.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.50m (21.33ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $3,447,000,  Roadway Improvement Cost: $345,000,  Total Project Cost: $5,171,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: G120590XJDOTNBI,  Location: MM 43.0 ON I-91 NB (Lat: 42.584547,  Lng: -72.621467),  Route carried "on" structure: Interstate 91,  Year Built: 1965,  Status: Open,  Structure Length: 2.85m (9.35ft),  Average Daily Traffic: 11,448 (year 2016),  Truck Traffic: 13%,  Average Future Daily Traffic: 16,745 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: ST 2 EB ROTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.200,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $494,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: G120600XLDOTNBI,  Location: MM 43.1 ON I-91 NB (Lat: 42.586092,  Lng: -72.620958),  Route carried "on" structure: Interstate 91,  Year Built: 1966,  Status: Open,  Structure Length: 2.89m (9.48ft),  Average Daily Traffic: 11,488 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 16,745 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: ST 2 WB ROTARY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.361,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 55.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 38.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2022,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $1,538,000,  Roadway Improvement Cost: $154,000,  Total Project Cost: $2,308,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: G120620XGDOTNBI,  Location: MM 42.7 ON I-91 NB (Lat: 42.580733,  Lng: -72.621344),  Route carried "on" structure: Interstate 91,  Year Built: 1966,  Year Reconstructed: 1986,  Status: Open,  Structure Length: 2.33m (7.64ft),  Average Daily Traffic: 14,632 (year 2017),  Truck Traffic: 15%,  Average Future Daily Traffic: 24,972 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: HWY FAIRVIEW ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.717,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.8m (42.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.3m (73.2ft),  Curb-To-Curb Width: 17.2m (56.4ft),  Out-to-Out Width: 18.3m (60.0ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 74.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $272,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $409,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: G120590XHDOTNBI,  Location: AT RTE 2 ROTARY (Lat: 42.583333,  Lng: -72.616667),  Route carried "under" structure: State highway 2,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 0000),  Features Intersected: ST 2 EB ROTARY,  Facility Carried by Structure: I 91 SB
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Find on map >>   Show street view

Structure Number: G120590XJDOTNBI,  Location: AT RTE 2 ROTARY (Lat: 42.583333,  Lng: -72.616667),  Route carried "under" structure: State highway 2,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 3,800 (year 0000),  Features Intersected: ST 2 EB ROTARY,  Facility Carried by Structure: I 91 NB
Minimum Vertical Clearance: 4.39m (14.40ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 26.8m (87.9ft)

Discuss Greenfield, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.