Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Franklin, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 213ft / 65.2mTotal length
  • $43,850,000Total costs
  • 717,743Total average daily traffic
  • 42,394Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Franklin
  • No street view available for this location

New bridges in Franklin, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 21900-1909
  • 201960-1969
  • 21980-1989
  • 22000-2009
Reconstructed bridges in Franklin, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11900-1909
  • 01910-1919
  • 01920-1929
  • 01930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
Average Bridge Daily Traffic in Franklin, MA
Average Bridge Truck Traffic in Franklin, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 56.3%Satisfactory
  • 18.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Good
  • 50.0%Satisfactory
  • 33.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 50.0%Good
  • 27.8%Satisfactory
  • 22.2%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 20.0%Good
  • 20.0%Satisfactory
  • 60.0%Fair
Find on map >>   Show street view

Structure Number: F080062AYDOT634,  Location: .8 MI SW OF NORFOLK T.L. (Lat: 42.098286,  Lng: -71.373117),  Route carried "on" structure: City street ,  Year Built: 1981,  Status: Open,  Structure Length: 2.47m (8.10ft),  Average Daily Traffic: 4,000 (year 2013),  Truck Traffic: 4%,  Average Future Daily Traffic: 6,317 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: RR MBTA/CSX,  Facility Carried by Structure: HWY CHESTNUT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.414,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 0.6m (2.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 14.7m (48.2ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 76.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.50m (8.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $145,000,  Total Project Cost: $2,167,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080072B0DOT634,  Location: 0.1 MI WEST OF SUMMER ST (Lat: 42.082575,  Lng: -71.397081),  Route carried "on" structure: State highway 140,  Year Built: 1899,  Year Reconstructed: 1995,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 31,200 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 49,274 (year 2031),  Design Load: HS 20,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 78.513,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.9m (45.6ft),  Out-to-Out Width: 35.7m (117.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Inventory Rating: 69.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $696,000,  Roadway Improvement Cost: $70,000,  Total Project Cost: $1,045,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F080082A3MUNNBI,  Location: CHRLS. RIVER @ MDWY. T.L. (Lat: 42.138328,  Lng: -71.398364),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1911,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 3,000 (year 2014),  Truck Traffic: 6%,  Average Future Daily Traffic: 4,738 (year 2031),  Features Intersected: WATER CHARLES RIVER,  Facility Carried by Structure: HWY LINCOLN ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.375,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.7m (35.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 67.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $509,000,  Roadway Improvement Cost: $51,000,  Total Project Cost: $764,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F080092AAMUNNBI,  Location: .3 MI S OF VILLAGE RD (Lat: 42.136517,  Lng: -71.418511),  Route carried "on" structure: City street ,  Year Built: 1900,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 1,300 (year 2016),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,053 (year 2031),  Features Intersected: WATER CHARLES RIVER,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 53.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: May 2020,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $329,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $494,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F080167WJMUNNBI,  Location: @ INST. OF ROBIN HOOD LN (Lat: 42.055747,  Lng: -71.409844),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 0.65m (2.13ft),  Average Daily Traffic: 2,160 (year 2014),  Truck Traffic: 1%,  Design Load: HS 20,  Features Intersected: WATER DIX BROOK,  Facility Carried by Structure: HWY FOREST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.6m (28.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.3m (33.8ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 51.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $229,000,  Roadway Improvement Cost: $23,000,  Total Project Cost: $344,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: F080202ABMUNNBI,  Location: 0.2 MI. W. OF RT. 495 (Lat: 42.086989,  Lng: -71.427167),  Route carried "on" structure: City street ,  Year Built: 1961,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 8,864 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 11,845 (year 2032),  Design Load: H 20,  Features Intersected: WATER MINE BROOK,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.766,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 5.5m (18.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 44.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.80m (5.91ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $828,000,  Roadway Improvement Cost: $83,000,  Total Project Cost: $1,243,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080211V8DOTNBI,  Location: .8 MI NW OF KING ST (Lat: 42.072453,  Lng: -71.412481),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 43,628 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 109,603 (year 2032),  Design Load: H 20,  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.188,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,296,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $3,445,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080211V9DOTNBI,  Location: .8 MI N OF KING ST (Lat: 42.072694,  Lng: -71.412131),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 43,890 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 109,603 (year 2032),  Design Load: H 20,  Features Intersected: RR CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 67.188,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.9m (48.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 11.6m (38.1ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $2,296,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $3,445,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080222AQDOTNBI,  Location: AT M.M.041.646 ON I-495 (Lat: 42.070522,  Lng: -71.409383),  Route carried "on" structure: City street ,  Year Built: 1966,  Status: Open,  Structure Length: 7.38m (24.21ft),  Average Daily Traffic: 1,300 (year 2013),  Truck Traffic: 3%,  Average Future Daily Traffic: 2,053 (year 2032),  Design Load: H 20,  Features Intersected: I 495,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.288,  Lanes on structure: 2,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 51.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $4,855,000,  Roadway Improvement Cost: $486,000,  Total Project Cost: $7,283,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080231VADOTNBI,  Location: I-495 @ EXIT 16 (Lat: 42.065056,  Lng: -71.400903),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 42,890 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: H 20,  Features Intersected: HWY KING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.981,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,837,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,756,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080231VBDOTNBI,  Location: I-495 @ EXIT 16 (Lat: 42.064650,  Lng: -71.401283),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.71m (8.89ft),  Average Daily Traffic: 33,852 (year 2020),  Truck Traffic: 15%,  Average Future Daily Traffic: 71,068 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY KING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 65.981,  Lanes on structure: 3,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.6m (84.0ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 48.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,837,000,  Roadway Improvement Cost: $184,000,  Total Project Cost: $2,756,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080241VCDOTNBI,  Location: .3 MI NW OF WRENTHAM T.L. (Lat: 42.058403,  Lng: -71.383844),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 44,280 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 60,013 (year 2032),  Design Load: H 20,  Features Intersected: HWY SUMMER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.533,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.8m (87.9ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.90m (9.51ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,891,000,  Roadway Improvement Cost: $190,000,  Total Project Cost: $2,837,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080241VDDOTNBI,  Location: .3 MI NW OF WRNTHM T.L. (Lat: 42.057611,  Lng: -71.383731),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.91m (9.55ft),  Average Daily Traffic: 34,276 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 57,565 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY SUMMER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 64.533,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.7m (51.5ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.6m (90.6ft),  Curb-To-Curb Width: 15.7m (51.5ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 50.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,968,000,  Roadway Improvement Cost: $197,000,  Total Project Cost: $2,953,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F08026ANWDOTNBI,  Location: 3 MI S OF ST-126 (Lat: 42.090114,  Lng: -71.427222),  Route carried "on" structure: State highway 140,  Year Built: 2006,  Status: Open,  Structure Length: 7.12m (23.36ft),  Average Daily Traffic: 23,625 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 39,482 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: I 495
Minimum Vertical Clearance: 99.00m (324.80ft),  Kilometerpoint: 78.513,  Lanes on structure: 6,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 28.0m (91.9ft),  Skew: 31 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 35.4m (116.1ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 28.0m (91.9ft),  Out-to-Out Width: 32.5m (106.6ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 73.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 7.20m (23.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,019,000,  Roadway Improvement Cost: $102,000,  Total Project Cost: $1,529,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: F080271VEDOTNBI,  Location: .2 MI SE OF ST 140 (Lat: 42.087436,  Lng: -71.424783),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 44,611 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 56,855 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.200,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $858,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,288,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080271VFDOTNBI,  Location: .2 MI SE OF ST 140 (Lat: 42.087475,  Lng: -71.425375),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 41,770 (year 2015),  Truck Traffic: 15%,  Average Future Daily Traffic: 63,172 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: RR MBTA/CSX
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 69.200,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 69.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $858,000,  Roadway Improvement Cost: $86,000,  Total Project Cost: $1,288,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Epoxy,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: F080291VGDOTNBI,  Location: .7 MI SE OF ST 140 (Lat: 42.081183,  Lng: -71.421367),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 40,786 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,013 (year 2032),  Design Load: H 20,  Features Intersected: HWY BEAVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.556,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,575,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,363,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F080291VHDOTNBI,  Location: .7 MI SE OF ST 140 (Lat: 42.080867,  Lng: -71.421792),  Route carried "on" structure: Interstate 495,  Year Built: 1966,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 44,611 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 60,013 (year 2032),  Design Load: H 20,  Features Intersected: HWY BEAVER ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 68.556,  Lanes on structure: 4,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.0m (49.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 15.0m (49.2ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 50.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,575,000,  Roadway Improvement Cost: $158,000,  Total Project Cost: $2,363,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F08031ANXDOTNBI,  Location: .2 MILES WEST OF I - 495 (Lat: 42.089139,  Lng: -71.432019),  Route carried "on" structure: City street ,  Year Built: 2006,  Status: Open,  Structure Length: 17.53m (57.51ft),  Average Daily Traffic: 16,900 (year 2006),  Truck Traffic: 20%,  Average Future Daily Traffic: 22,900 (year 2031),  Design Load: HS 20,  Features Intersected: COMB MBTA&MINE BRK TRB,  Facility Carried by Structure: ST140 W CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 20.7m (67.9ft),  Skew: 39 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 55.8m (183.1ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.0m,  Curb-To-Curb Width: 20.7m (67.9ft),  Out-to-Out Width: 21.6m (70.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 17.60m (57.74ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $2,324,000,  Roadway Improvement Cost: $233,000,  Total Project Cost: $3,487,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: B060192ATDOTNBI,  Location: 000066 STATUTORY (Lat: 42.050000,  Lng: -71.416667),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,750 (year 0000),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY FARM ST
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: B060192AUDOTNBI,  Location: 000066 STATUTORY (Lat: 42.050000,  Lng: -71.416667),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,750 (year 0000),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY FARM ST
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 40.5m (132.9ft)

Find on map >>   Show street view

Structure Number: B060202AFDOTNBI,  Location: ST 126 AT I 495 (Lat: 42.083333,  Lng: -71.450000),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,750 (year 0000),  Features Intersected: I 495 NB,  Facility Carried by Structure: ST126
Minimum Vertical Clearance: 5.49m (18.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 35.7m (117.1ft)

Find on map >>   Show street view

Structure Number: B060202AGDOTNBI,  Location: ST 126 AT I 495 (Lat: 42.083333,  Lng: -71.450000),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,750 (year 0000),  Features Intersected: I 495 SB,  Facility Carried by Structure: ST126
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 4,  Toll: On toll road,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 36.0m (118.1ft)

Find on map >>   Show street view

Structure Number: B060222ARDOTNBI,  Location: .6 MI.SE OF ST 126 (Lat: 42.050000,  Lng: -71.400000),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,750 (year 0000),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: B060222ARDOTNBI,  Location: 091885 STATUTORY (Lat: 42.050000,  Lng: -71.400000),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 27,750 (year 0000),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 3,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 32.6m (107.0ft)

Find on map >>   Show street view

Structure Number: F080222AQDOTNBI,  Location: .6 MI NW OF KING ST (Lat: 42.066667,  Lng: -71.416667),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 22,150 (year 0000),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY WSHNGTN ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.3m (188.0ft)

Find on map >>   Show street view

Structure Number: F080222AQDOTNBI,  Location: 000066 STATUTORY (Lat: 42.066667,  Lng: -71.416667),  Route carried "under" structure: Interstate 495,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 22,150 (year 0000),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY WSHNGTN ST
Minimum Vertical Clearance: 5.08m (16.67ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 57.3m (188.0ft)

Discuss Franklin, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.