Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Easthampton, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 19Number of bridges
  • 243ft / 74.4mTotal length
  • $42,714,000Total costs
  • 283,351Total average daily traffic
  • 16,171Total average daily truck traffic
  • 536,188Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Easthampton
  • No street view available for this location

New bridges in Easthampton, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 11930-1939
  • 11940-1949
  • 41950-1959
  • 61960-1969
  • 11970-1979
  • 11990-1999
  • 32000-2009
Reconstructed bridges in Easthampton, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11950-1959
  • 01960-1969
  • 11970-1979
  • 01980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Easthampton, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.3%Very good
  • 31.6%Good
  • 21.1%Satisfactory
  • 36.8%Fair
  • 5.3%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 21.1%Very good
  • 15.8%Good
  • 31.6%Satisfactory
  • 15.8%Fair
  • 15.8%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 15.8%Very good
  • 10.5%Good
  • 36.8%Satisfactory
  • 36.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 7.1%Very good
  • 50.0%Good
  • 35.7%Satisfactory
  • 7.1%Fair
Find on map >>   Show street view

Structure Number: E050010LBMUNNBI,  Location: .8 MI S OF RTE 10 (Lat: 42.279881,  Lng: -72.654258),  Route carried "on" structure: City street ,  Year Built: 1971,  Status: Open,  Structure Length: 4.33m (14.21ft),  Average Daily Traffic: 9,310 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 8,577 (year 2032),  Design Load: H 20,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY LOVEFIELD ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 7,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.0m (49.2ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 48.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.40m (14.44ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: January 2021,  Underwater Inspection Date: December 2020,  Bridge Improvement Cost: $2,593,000,  Roadway Improvement Cost: $260,000,  Total Project Cost: $3,890,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050020LCMUNNBI,  Location: 450' W OF ADAMS ST (Lat: 42.267878,  Lng: -72.666781),  Route carried "on" structure: City street ,  Year Built: 1956,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 1,650 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 3,677 (year 2032),  Design Load: H 20,  Features Intersected: WATER LOWER MILL POND,  Facility Carried by Structure: HWY LIBERTY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 9.7m (31.8ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 56.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 33 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: January 2021,  Underwater Inspection Date: June 2020,  Other Special Inspection Date: January 2022,  Bridge Improvement Cost: $498,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $748,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050030L9MUNNBI,  Location: 500 FT W OF ADAMS ST (Lat: 42.265239,  Lng: -72.668286),  Route carried "on" structure: State highway 141,  Year Built: 1957,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 21,466 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 20,057 (year 2032),  Design Load: H 20,  Features Intersected: WATER NASHAWANNUCK POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 2.7m (8.9ft),  Curb-To-Curb Width: 12.8m (42.0ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 40.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 36.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $74,000,  Roadway Improvement Cost: $8,000,  Total Project Cost: $112,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E05004AKFDOTNBI,  Location: .1 M N JCT EAST ST. (Lat: 42.288789,  Lng: -72.617708),  Route carried "on" structure: US 5,  Year Built: 2004,  Status: Open,  Structure Length: 7.39m (24.25ft),  Average Daily Traffic: 18,362 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 13,266 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: WATER MANHAN RIV OXBOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.377,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 35.8m (117.5ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 0.0m,  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: October 2020,  Underwater Inspection Date: January 2019,  Bridge Improvement Cost: $628,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $943,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E050050LAMUNNBI,  Location: .7 MI N OF RTE 10 (Lat: 42.266714,  Lng: -72.691281),  Route carried "on" structure: City street ,  Year Built: 1938,  Status: Posted for load,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 6,850 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,476 (year 2032),  Design Load: H 15,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY GLENDALE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.9m (62.0ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Good,  Operating Rating: 75.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: September 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $1,122,000,  Roadway Improvement Cost: $113,000,  Total Project Cost: $1,684,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: E050060V0DOTNBI,  Location: 1.3 M S EASTHAMPTON T.L. (Lat: 42.273961,  Lng: -72.673011),  Route carried "on" structure: State highway 10,  Year Built: 1951,  Year Reconstructed: 2013,  Status: Open,  Structure Length: 2.98m (9.78ft),  Average Daily Traffic: 31,100 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 35,439 (year 2031),  Design Load: HL 93,  Features Intersected: WATER MANHAN RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 36.853,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.3m (92.8ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.3m (43.6ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,217,000,  Roadway Improvement Cost: $122,000,  Total Project Cost: $1,826,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E050070LFMUNNBI,  Location: JCT MINERAL STREET (Lat: 42.283514,  Lng: -72.735803),  Route carried "on" structure: City street ,  Year Built: 1992,  Status: Open,  Structure Length: 1.59m (5.22ft),  Average Daily Traffic: 1,034 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 407 (year 2033),  Design Load: HS 20,  Features Intersected: WATER N BR MANHAN RIVER,  Facility Carried by Structure: HWY LOUDVILLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.377,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.3m (40.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 35.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $544,000,  Roadway Improvement Cost: $55,000,  Total Project Cost: $817,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E05008140DOT634,  Location: .5 M S JCT ST 10 (Lat: 42.262103,  Lng: -72.677250),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1955,  Status: Posted for load,  Structure Length: 1.23m (4.04ft),  Average Daily Traffic: 13,488 (year 2015),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,394 (year 2032),  Features Intersected: OTHER MANHAN RAIL TRAIL,  Facility Carried by Structure: HWY PARK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.5m (24.6ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 24.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 14.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 20.0 - 29.9% below),  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $50,000,  Total Project Cost: $737,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E050100L8MUNNBI,  Location: AT SOUTHAMPTON LINE (Lat: 42.276475,  Lng: -72.716436),  Route carried "on" structure: City street ,  Year Built: 1940,  Status: Posted for load,  Structure Length: 2.78m (9.12ft),  Average Daily Traffic: 2,200 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 11,134 (year 2032),  Features Intersected: WATER N BR MANHAN RIVER,  Facility Carried by Structure: HWY TORREY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 10.7m (35.1ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 6.0m (19.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 39.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $748,000,  Roadway Improvement Cost: $75,000,  Total Project Cost: $1,123,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E050110PRMUNNBI,  Location: 1MI NW OF RT10 @SHMTN LIN (Lat: 42.266722,  Lng: -72.697000),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Posted for load,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 3,362 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 3,880 (year 2031),  Design Load: H 20,  Features Intersected: WATER N BR MANHAN RIVER,  Facility Carried by Structure: HWY PMROY MEADOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 5.7m (18.7ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Fair,  Operating Rating: 35.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $990,000,  Roadway Improvement Cost: $100,000,  Total Project Cost: $1,486,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050140LEMUNNBI,  Location: .1 MI E OF PLEASANT ST (Lat: 42.275808,  Lng: -72.654794),  Route carried "on" structure: City street ,  Year Built: 1880,  Year Reconstructed: 1984,  Status: Open,  Structure Length: 0.96m (3.15ft),  Average Daily Traffic: 6,611 (year 2017),  Truck Traffic: 4%,  Average Future Daily Traffic: 8,986 (year 2032),  Design Load: HS 20,  Features Intersected: WATER LOWER MILL POND,  Facility Carried by Structure: HWY FERRY ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.4m (4.6ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $433,000,  Roadway Improvement Cost: $44,000,  Total Project Cost: $650,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050150PQMUNNBI,  Location: 0.4 MI N OF EAST STREET (Lat: 42.283511,  Lng: -72.640503),  Route carried "on" structure: City street ,  Year Built: 1964,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 905 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 816 (year 2031),  Design Load: H 20,  Features Intersected: WATER MANHAN RIVER,  Facility Carried by Structure: HWY FORT HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.612,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.9m (32.5ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.1 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 24.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: December 2020,  Underwater Inspection Date: January 2022,  Bridge Improvement Cost: $1,257,000,  Roadway Improvement Cost: $126,000,  Total Project Cost: $1,886,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E050190LDMUNNBI,  Location: .4 M SW OF RTE 141 (Lat: 42.243861,  Lng: -72.657944),  Route carried "on" structure: City street ,  Year Built: 1956,  Year Reconstructed: 2011,  Status: Open,  Structure Length: 1.26m (4.13ft),  Average Daily Traffic: 1,293 (year 2001),  Truck Traffic: 6%,  Average Future Daily Traffic: 2,042 (year 2032),  Design Load: HS 25 or greater,  Features Intersected: WATER BROAD BROOK,  Facility Carried by Structure: HWY HENDRICK ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.2m (40.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 70.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.30m (4.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $675,000,  Roadway Improvement Cost: $68,000,  Total Project Cost: $1,013,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E05024B2ADOTNBI,  Location: MM 21.0 ON I-91 SB (Lat: 42.286194,  Lng: -72.620106),  Route carried "on" structure: Interstate 91,  Year Built: 2009,  Status: Open,  Structure Length: 8.58m (28.15ft),  Average Daily Traffic: 27,526 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 102,654 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: HWY EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.956,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 91.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.60m (28.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $974,000,  Roadway Improvement Cost: $98,000,  Total Project Cost: $1,462,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E05024B2BDOTNBI,  Location: MM 21.0 ON I-91 SB (Lat: 42.286186,  Lng: -72.619317),  Route carried "on" structure: Interstate 91,  Year Built: 2009,  Status: Open,  Structure Length: 7.61m (24.97ft),  Average Daily Traffic: 27,714 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 102,654 (year 2031),  Design Load: HS 25 or greater,  Features Intersected: HWY EAST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.956,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 31.3m (102.7ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 91.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.70m (25.26ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $872,000,  Roadway Improvement Cost: $88,000,  Total Project Cost: $1,309,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: E050250X9DOTNBI,  Location: MM 21.2 ON I-91 SB (Lat: 42.287092,  Lng: -72.621997),  Route carried "on" structure: Interstate 91,  Year Built: 1963,  Status: Temporarily open,  Structure Length: 5.54m (18.18ft),  Average Daily Traffic: 27,526 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 81,334 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: OTHER MANHAN RAIL TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.117,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 17.9m (58.7ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 33.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,970,000,  Roadway Improvement Cost: $298,000,  Total Project Cost: $4,456,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050250XADOTNBI,  Location: MM 21.2 ON I-91 NB (Lat: 42.287089,  Lng: -72.621250),  Route carried "on" structure: Interstate 91,  Year Built: 1963,  Status: Open,  Structure Length: 6.28m (20.60ft),  Average Daily Traffic: 27,714 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 39,956 (year 2033),  Design Load: HS 20+Mod,  Features Intersected: OTHER MANHAN RAIL TRAIL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.117,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 20.3m (66.6ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Operating Rating: 39.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.40m (24.28ft),  Designated Inspection Frequency: Every 12 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: March 2020,  Other Special Inspection Date: March 2021,  Bridge Improvement Cost: $5,698,000,  Roadway Improvement Cost: $570,000,  Total Project Cost: $8,548,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050260XBDOTNBI,  Location: MM 21.1 ON I-91 SB (Lat: 42.287878,  Lng: -72.623378),  Route carried "on" structure: Interstate 91,  Year Built: 1963,  Status: Open,  Structure Length: 6.27m (20.57ft),  Average Daily Traffic: 27,526 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 39,956 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: WATER MANHAN RIV OXBOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.206,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.3m (138.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,341,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $5,012,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: E050260XCDOTNBI,  Location: MM 21.1 ON I-91 NB (Lat: 42.288033,  Lng: -72.622992),  Route carried "on" structure: Interstate 91,  Year Built: 1963,  Status: Open,  Structure Length: 6.24m (20.47ft),  Average Daily Traffic: 27,714 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 42,483 (year 2031),  Design Load: HS 20+Mod,  Features Intersected: WATER MANHAN RIV OXBOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.206,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 42.7m (140.1ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Good,  Operating Rating: 54.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.30m (20.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $3,341,000,  Roadway Improvement Cost: $335,000,  Total Project Cost: $5,012,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Discuss Easthampton, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.