Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for East Bridgewater, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 46ft / 14.1mTotal length
  • $14,379,000Total costs
  • 100,446Total average daily traffic
  • 5,899Total average daily truck traffic
  • 210,916Total future (year 2031) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for East Bridgewater
  • No street view available for this location

New bridges in East Bridgewater, MA - historical statistics
  • New bridges - historical statistics
  • 3Before 1900
  • 11900-1909
  • 31920-1929
  • 11940-1949
  • 21970-1979
  • 11990-1999
Reconstructed bridges in East Bridgewater, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11920-1929
  • 11930-1939
  • 11940-1949
Average Bridge Daily Traffic in East Bridgewater, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Very good
  • 33.3%Good
  • 16.7%Satisfactory
  • 33.3%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 25.0%Good
  • 12.5%Satisfactory
  • 50.0%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 62.5%Good
  • 25.0%Satisfactory
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Good
  • 30.0%Satisfactory
  • 30.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Good
  • 33.3%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: E0100141QMUNNBI,  Location: .55 MI SW RTE 18 (Lat: 42.026461,  Lng: -70.967233),  Route carried "on" structure: City street ,  Year Built: 1946,  Status: Posted for load,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 8,922 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 15,793 (year 2031),  Design Load: H 15,  Features Intersected: WATER MATFIELD RIVER,  Facility Carried by Structure: HWY SPRING ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.062,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Material/Design: Concrete continuous,  Design/Construction: Slab,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 6.1m (20.0ft),  Curb or Sidewalk Widths: Left: 0.3m (1.0ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Fair,  Operating Rating: 37.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 22.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.90m (6.23ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Underwater Inspection Date: Febuary 2021,  Bridge Improvement Cost: $889,000,  Roadway Improvement Cost: $89,000,  Total Project Cost: $1,334,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E0100247UDOTNBI,  Location: 0.1 M S OF RTE 106 (Lat: 42.015494,  Lng: -70.961158),  Route carried "on" structure: State highway 18,  Year Built: 1880,  Year Reconstructed: 1930,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 23,189 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 58,434 (year 2031),  Features Intersected: WATER MATFIELD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 45.076,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb or Sidewalk Widths: Left: 2.0m (6.6ft),  Right: 2.0m (6.6ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 20.2m (66.3ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $521,000,  Roadway Improvement Cost: $53,000,  Total Project Cost: $782,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E0100347VDOTNBI,  Location: .25 MI N OF CENTRAL ST (Lat: 42.035683,  Lng: -70.958122),  Route carried "on" structure: State highway 18,  Year Built: 1893,  Year Reconstructed: 1940,  Status: Posted for load,  Structure Length: 2.23m (7.32ft),  Average Daily Traffic: 17,237 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 47,853 (year 2032),  Design Load: H 20,  Features Intersected: WATER FORGE POND
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.054,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.0m (45.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 14.0m (45.9ft),  Out-to-Out Width: 18.7m (61.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 22.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 2.30m (7.55ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2021,  Underwater Inspection Date: April 2019,  Bridge Improvement Cost: $1,690,000,  Roadway Improvement Cost: $170,000,  Total Project Cost: $2,536,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E0100641PMUNNBI,  Location: .6 MI SW RTE 18 (Lat: 42.031158,  Lng: -70.970703),  Route carried "on" structure: City street ,  Year Built: 1902,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 4,098 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,554 (year 2031),  Features Intersected: WATER MATFIELD RIVER,  Facility Carried by Structure: HWY W UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.094,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.2m (3.9ft),  Curb-To-Curb Width: 5.9m (19.4ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Superstructure: Satisfactory,  Substructure: Good,  Channel: Fair,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $637,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $956,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E0100741UMUNNBI,  Location: .1 M S OF SUMMER ST. (Lat: 42.039650,  Lng: -70.982269),  Route carried "on" structure: City street ,  Year Built: 1921,  Status: Posted for load,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 4,100 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 11,213 (year 2031),  Features Intersected: WATER SALISBURY PLAIN R,  Facility Carried by Structure: HWY PLEASANT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 9.4m (30.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Channel: Good,  Operating Rating: 67.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $41,000,  Total Project Cost: $611,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E0100941TMUNNBI,  Location: .7 MI W RTE 18 (Lat: 42.033539,  Lng: -70.972656),  Route carried "on" structure: City street ,  Year Built: 1921,  Year Reconstructed: 1929,  Status: Open,  Structure Length: 0.76m (2.49ft),  Average Daily Traffic: 5,900 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 14,845 (year 2031),  Features Intersected: WATER MATFIELD RIVER,  Facility Carried by Structure: HWY N CENTRAL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Masonry,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.0m (45.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 53.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $440,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $661,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E01010BVTMUNNBI,  Location: 1 MI. EAST OF ST 106 (Lat: 42.009156,  Lng: -70.907561),  Route carried "on" structure: County highway ,  Year Built: 1850,  Status: Posted for load,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,600 (year 2018),  Truck Traffic: 5%,  Features Intersected: WATER SATUKET RIVER,  Facility Carried by Structure: HWY POND STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 76.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.80m (2.62ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $211,000,  Roadway Improvement Cost: $22,000,  Total Project Cost: $317,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E01011439MUNNBI,  Location: .7 MI NO OF JCT 106 (Lat: 42.022525,  Lng: -70.931867),  Route carried "on" structure: City street ,  Year Built: 1970,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,900 (year 2018),  Truck Traffic: 6%,  Average Future Daily Traffic: 5,370 (year 2031),  Features Intersected: WATER SATUCKET RIVER,  Facility Carried by Structure: HWY BRIDGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.014,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.0m (13.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft)

Condition: Channel: Good,  Culverts: Good,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.50m (1.64ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: October 2020,  Underwater Inspection Date: October 2021,  Bridge Improvement Cost: $444,000,  Roadway Improvement Cost: $45,000,  Total Project Cost: $667,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E0101249MDOTNBI,  Location: .5 M E OF RTE 18 (Lat: 42.021653,  Lng: -70.950489),  Route carried "on" structure: State highway 106,  Year Built: 1971,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 11,700 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 30,007 (year 2031),  Design Load: H 20,  Features Intersected: WATER SATUCKET RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.246,  Lanes on structure: 3,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.9m (16.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 2.3m (7.5ft),  Curb-To-Curb Width: 14.3m (46.9ft),  Out-to-Out Width: 25.6m (84.0ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 69.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.70m (5.58ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: July 2020,  Underwater Inspection Date: August 2020,  Bridge Improvement Cost: $630,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $946,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: E0101441RMUNNBI,  Location: .48KM N JCT POND ST (Lat: 42.017064,  Lng: -70.917703),  Route carried "on" structure: City street ,  Year Built: 1927,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 12,600 (year 2020),  Truck Traffic: 2%,  Average Future Daily Traffic: 11,845 (year 2031),  Features Intersected: WATER SATUCKET RIVER,  Facility Carried by Structure: HWY WASHNGTON ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.368,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 60.7 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: August 2020,  Underwater Inspection Date: Febuary 2022,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $620,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: E010154BKDOT634,  Location: MBTA MP 24/440 (Lat: 42.028758,  Lng: -70.982850),  Route carried "on" structure: City street ,  Year Built: 1997,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 7,200 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 9,002 (year 2033),  Design Load: HS 20,  Features Intersected: RR MBTA MP 24/440,  Facility Carried by Structure: HWY W UNION ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.3m (1.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 59.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of replacement,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Critical Feature Inspection Date: March 2020,  Bridge Improvement Cost: $3,299,000,  Roadway Improvement Cost: $330,000,  Total Project Cost: $4,949,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Latex Concrete,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Discuss East Bridgewater, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.