Bridge Statistics for Amesbury Town, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 135ft / 41.1mTotal length
  • $42,694,000Total costs
  • 217,064Total average daily traffic
  • 14,034Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Amesbury Town
  • No street view available for this location

New bridges in Amesbury Town, MA - historical statistics
  • New bridges - historical statistics
  • 91960-1969
  • 21990-1999
Average Bridge Daily Traffic in Amesbury Town, MA
Average Bridge Truck Traffic in Amesbury Town, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 14.3%Very good
  • 14.3%Good
  • 71.4%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 14.3%Very good
  • 14.3%Good
  • 42.9%Satisfactory
  • 28.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 14.3%Very good
  • 14.3%Good
  • 28.6%Satisfactory
  • 42.9%Fair
Find on map >>   Show street view

Structure Number: A070012QRMUNNBI,  Location: JUST SOUTH NH LINE (Lat: 42.861750,  Lng: -70.983239),  Route carried "on" structure: City street ,  Year Built: 1995,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 1,163 (year 2019),  Average Future Daily Traffic: 829 (year 2032),  Design Load: HS 20,  Features Intersected: WATER POWWOW RIVER,  Facility Carried by Structure: HWY NEWTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.6m (74.1ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $1,313,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $1,970,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A070022QTMUNNBI,  Location: AT TREATMENT PLANT (Lat: 42.861969,  Lng: -70.972456),  Route carried "on" structure: City street ,  Year Built: 1994,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,939 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 2,448 (year 2032),  Design Load: HS 20,  Features Intersected: WATER POWWOW RIVER,  Facility Carried by Structure: HWY NEWTON RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.287,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 40.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Underwater Inspection Date: April 2021,  Bridge Improvement Cost: $633,000,  Roadway Improvement Cost: $64,000,  Total Project Cost: $950,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: A070212W8DOTNBI,  Location: 2.3 MI S EXIT 54 (Lat: 42.834881,  Lng: -70.964958),  Route carried "on" structure: Interstate 495,  Year Built: 1964,  Status: Temporarily open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 34,800 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 96,410 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY MIDDLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.421,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,754,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $4,132,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A070212W9DOTNBI,  Location: 2.3 MI S EXIT 54 (Lat: 42.834450,  Lng: -70.965381),  Route carried "on" structure: Interstate 495,  Year Built: 1964,  Status: Temporarily open,  Structure Length: 4.08m (13.39ft),  Average Daily Traffic: 40,300 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 96,410 (year 2032),  Design Load: HS 20+Mod,  Features Intersected: HWY MIDDLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 187.421,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Skew: 5 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 17.1m (56.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 47.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 28.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.10m (13.45ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $2,754,000,  Roadway Improvement Cost: $276,000,  Total Project Cost: $4,132,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S0200731NDOTNBI,  Location: .6 MI S OF NH STATE LINE (Lat: 42.873847,  Lng: -70.887275),  Route carried "on" structure: Ramp State highway 286,  Year Built: 1967,  Status: Open,  Structure Length: 10.52m (34.51ft),  Average Daily Traffic: 3,200 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 4,084 (year 2033),  Design Load: H 20,  Features Intersected: I 95,  Facility Carried by Structure: I 95 SB CONN TOLL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 40.5m (132.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 51.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.60m (34.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $3,581,000,  Roadway Improvement Cost: $359,000,  Total Project Cost: $5,372,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S0200831PDOTNBI,  Location: 1 MI S NEW HAMPSHIRE STAT (Lat: 42.867919,  Lng: -70.890461),  Route carried "on" structure: State highway 286,  Year Built: 1967,  Status: Posted for load,  Structure Length: 8.78m (28.81ft),  Average Daily Traffic: 3,800 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 15,161 (year 2033),  Design Load: H 20,  Features Intersected: I 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.4m (149.0ft),  Curb or Sidewalk Widths: Left: 1.0m (3.3ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 13.4m (44.0ft),  Out-to-Out Width: 17.3m (56.8ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 87.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.80m (28.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $12,002,000,  Roadway Improvement Cost: $1,201,000,  Total Project Cost: $18,004,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: S020092XLDOTNBI,  Location: AT END OF I495 (Lat: 42.856506,  Lng: -70.896592),  Route carried "on" structure: Interstate 495,  Year Built: 1969,  Status: Open,  Structure Length: 10.24m (33.60ft),  Average Daily Traffic: 25,862 (year 2020),  Truck Traffic: 22%,  Average Future Daily Traffic: 59,066 (year 2033),  Design Load: HS 20,  Features Intersected: I 95
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 193.623,  Lanes on structure: 2,  Lanes under structure: 8,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 37.2m (122.0ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.30m (33.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $5,422,000,  Roadway Improvement Cost: $543,000,  Total Project Cost: $8,134,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: A070272YBDOTNBI,  Location: .6 MILES NORTH EXIT 55 (Lat: 42.850000,  Lng: -70.900000),  Route carried "under" structure: Interstate 495,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 0000),  Features Intersected: I 495 NB,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 192.289,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: A070272YBDOTNBI,  Location: .6 MILES NORTH EXIT 55 (Lat: 42.850000,  Lng: -70.900000),  Route carried "under" structure: Interstate 495,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 22,000 (year 0000),  Features Intersected: I 495 SB,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 5.03m (16.50ft),  Kilometerpoint: 192.289,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.9m (62.0ft)

Find on map >>   Show street view

Structure Number: S0200831PDOTNBI,  Location: 1 MI S NEW HAMPSHIRE STAT (Lat: 42.866667,  Lng: -70.900000),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: ST286
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 143.002,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Find on map >>   Show street view

Structure Number: S0200831PDOTNBI,  Location: 1 MI S NEW HAMPSHIRE STAT (Lat: 42.866667,  Lng: -70.900000),  Route carried "under" structure: Interstate 95,  Year Built: 1967,  Structure Length: 0. m,  Average Daily Traffic: 31,000 (year 0000),  Features Intersected: I 95 SB,  Facility Carried by Structure: ST286
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 142.051,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 45.4m (149.0ft)

Discuss Amesbury Town, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.