Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Mansfield, Massachusetts (MA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 33Number of bridges
  • 344ft / 105mTotal length
  • $78,635,000Total costs
  • 718,487Total average daily traffic
  • 36,021Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Mansfield
  • No street view available for this location

New bridges in Mansfield, MA - historical statistics
  • New bridges - historical statistics
  • 1Before 1900
  • 11900-1909
  • 21910-1919
  • 11920-1929
  • 31950-1959
  • 91960-1969
  • 91970-1979
  • 31980-1989
  • 42000-2009
Reconstructed bridges in Mansfield, MA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21920-1929
  • 11930-1939
  • 01940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Mansfield, MA
Average Bridge Truck Traffic in Mansfield, MA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 7.1%Very good
  • 35.7%Good
  • 21.4%Satisfactory
  • 35.7%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 10.3%Very good
  • 13.8%Good
  • 51.7%Satisfactory
  • 17.2%Fair
  • 3.4%Poor
  • 3.4%Serious
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 6.9%Very good
  • 37.9%Good
  • 41.4%Satisfactory
  • 13.8%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 23.1%Very good
  • 38.5%Good
  • 30.8%Satisfactory
  • 7.7%Fair
Find on map >>   Show street view

Structure Number: F060273RADOTNBI,  Location: I 495 AT I 95 (Lat: 42.026669,  Lng: -71.257772),  Route carried "on" structure: Interstate 495,  Year Built: 1965,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 45,525 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 66,331 (year 2031),  Design Load: HS 20,  Features Intersected: I 95 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.718,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,434,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $3,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: F060273RBDOTNBI,  Location: I 495 AT I 95 (Lat: 42.026947,  Lng: -71.257389),  Route carried "on" structure: Interstate 495,  Year Built: 1965,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 47,377 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 66,331 (year 2031),  Design Load: HS 20,  Features Intersected: I 95 SB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.025,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,434,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $3,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030013JHMUNNBI,  Location: 2 MI W OF ST140 (Lat: 42.018806,  Lng: -71.266678),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1934,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 8,300 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,476 (year 2032),  Features Intersected: WATER WADING RIVER,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.704,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 43.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 36 months,  Other Special Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Underwater Inspection Date: January 2020,  Other Special Inspection Date: June 2021,  Bridge Improvement Cost: $1,199,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $1,799,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030033JFMUNNBI,  Location: .4 MI NE OF GILBERT ST (Lat: 42.000578,  Lng: -71.259975),  Route carried "on" structure: City street ,  Year Built: 1910,  Year Reconstructed: 1935,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 3,200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 4,422 (year 2032),  Features Intersected: WATER WADING RIVER,  Facility Carried by Structure: HWY BALCOM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.676,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 6.3m (20.7ft),  Out-to-Out Width: 6.8m (22.3ft)

Condition: Deck: Fair,  Superstructure: Serious,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 72.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 6 months,  Other Special Inspection Frequency: Every 6 months,  Inspection Date: March 2021,  Other Special Inspection Date: September 2021,  Bridge Improvement Cost: $241,000,  Roadway Improvement Cost: $25,000,  Total Project Cost: $362,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: M030043LGMUNNBI,  Location: 1 MI SE OF JCT SCHOOL ST (Lat: 41.989436,  Lng: -71.254717),  Route carried "on" structure: City street ,  Year Built: 1900,  Year Reconstructed: 1934,  Status: Posted for load,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 775 (year 2021),  Truck Traffic: 16%,  Average Future Daily Traffic: 1,579 (year 2032),  Features Intersected: WATER WADING RIVER,  Facility Carried by Structure: HWY OTIS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.241,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 20.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.0 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 30.0 - 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $327,000,  Roadway Improvement Cost: $33,000,  Total Project Cost: $491,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: M0300740FDOT634,  Location: .6 MI NW OF NORTON T.L. (Lat: 41.984619,  Lng: -71.254019),  Route carried "on" structure: City street ,  Year Built: 1876,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.42m (4.66ft),  Average Daily Traffic: 2,836 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 4,738 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY GILBERT ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.6m (44.6ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 65.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.50m (4.92ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $95,000,  Total Project Cost: $1,423,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Internally Sealed
Find on map >>   Show street view

Structure Number: M03012AQ4MUNNBI,  Location: 0.1 MI. W. OF FRANKLIN ST (Lat: 42.032597,  Lng: -71.193472),  Route carried "on" structure: State highway 106,  Year Built: 2007,  Status: Open,  Structure Length: 1.35m (4.43ft),  Average Daily Traffic: 25,400 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 58,434 (year 2032),  Design Load: HS 20,  Features Intersected: WATER CANOE RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.0m (39.4ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 1.6m (5.2ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 14.9m (48.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Very good,  Operating Rating: 78.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $317,000,  Roadway Improvement Cost: $32,000,  Total Project Cost: $476,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M030133P2DOTNBI,  Location: .37 MI. NO. OF NORTON TL. (Lat: 41.996067,  Lng: -71.210672),  Route carried "on" structure: State highway 140,  Year Built: 1928,  Year Reconstructed: 1993,  Status: Open,  Structure Length: 1.52m (4.99ft),  Average Daily Traffic: 24,100 (year 2021),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,059 (year 2032),  Design Load: HS 20,  Features Intersected: WATER RUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 52.109,  Lanes on structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Single/Spread,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 24.8m (81.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 50.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 36 months,  Inspection Date: June 2021,  Underwater Inspection Date: January 2020,  Bridge Improvement Cost: $1,559,000,  Roadway Improvement Cost: $156,000,  Total Project Cost: $2,339,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M03014ALEDOT634,  Location: AMTRAK MILE POST 202 (Lat: 42.010542,  Lng: -71.235656),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 3.35m (10.99ft),  Average Daily Traffic: 13,824 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 21,478 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.609,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.8m (104.3ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 99.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 59.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 3.40m (11.15ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $289,000,  Roadway Improvement Cost: $29,000,  Total Project Cost: $434,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M03015AMCDOT634,  Location: .3 MI SE OF SCHOOL ST. (Lat: 41.999503,  Lng: -71.243478),  Route carried "on" structure: City street ,  Year Built: 2005,  Status: Open,  Structure Length: 5.28m (17.32ft),  Average Daily Traffic: 6,200 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 14,214 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA,  Facility Carried by Structure: HWY ELM ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 24.3m (79.7ft),  Curb or Sidewalk Widths: Left: 0.9m (3.0ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 15.2m (49.9ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Operating Rating: 66.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.30m (17.39ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $450,000,  Roadway Improvement Cost: $46,000,  Total Project Cost: $676,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M030173LHMUNNBI,  Location: 0.2 MI. N. OF RT. 106 (Lat: 42.035008,  Lng: -71.218178),  Route carried "on" structure: City street ,  Year Built: 1954,  Status: Open,  Structure Length: 3.05m (10.01ft),  Average Daily Traffic: 1,200 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,317 (year 2032),  Design Load: H 20,  Features Intersected: HWY N MAIN ST,  Facility Carried by Structure: HWY MANSFLD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.127,  Lanes on structure: 1,  Lanes under structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.5m (100.1ft),  Curb or Sidewalk Widths: Left: 0.6m (2.0ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 23.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2021,  Bridge Improvement Cost: $1,279,000,  Roadway Improvement Cost: $128,000,  Total Project Cost: $1,919,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: M030183XQDOTNBI,  Location: NEXT TO RAIL; OLD RTE 140 (Lat: 42.025408,  Lng: -71.225269),  Route carried "on" structure: Other road ,  Year Built: 1954,  Status: Posted for load,  Structure Length: 2.13m (6.99ft),  Average Daily Traffic: 1,100 (year 2020),  Average Future Daily Traffic: 474 (year 2033),  Design Load: H 20,  Features Intersected: HWY COPLAND DR,  Facility Carried by Structure: HWY GEORGE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 6.4m (21.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 10.5m (34.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 30.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 14.6 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: 0.1 - 9.9% below),  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2022,  Bridge Improvement Cost: $908,000,  Roadway Improvement Cost: $91,000,  Total Project Cost: $1,363,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: M030223JJMUNNBI,  Location: .3 MI WEST OF FRANKLIN ST (Lat: 42.048850,  Lng: -71.196778),  Route carried "on" structure: City street ,  Year Built: 1955,  Status: Open,  Structure Length: 0.67m (2.20ft),  Average Daily Traffic: 1,428 (year 2022),  Truck Traffic: 20%,  Average Future Daily Traffic: 6,317 (year 2033),  Design Load: H 20,  Features Intersected: WATER CANOE RIVER,  Facility Carried by Structure: HWY MAPLE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.625,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Out-to-Out Width: 24.5m (80.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 64.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: January 2022,  Bridge Improvement Cost: $410,000,  Roadway Improvement Cost: $42,000,  Total Project Cost: $616,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: M030253QYDOTNBI,  Location: .7 MI SW OF I 495 (Lat: 42.019144,  Lng: -71.267053),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Status: Open,  Structure Length: 1.06m (3.48ft),  Average Daily Traffic: 62,300 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 85,985 (year 2032),  Design Load: HS 20,  Features Intersected: WATER WADING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.453,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 63.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030253R0DOTNBI,  Location: .7 MI SW OF I 495 (Lat: 42.019594,  Lng: -71.267742),  Route carried "on" structure: Interstate 95,  Year Built: 1962,  Status: Open,  Structure Length: 1.05m (3.44ft),  Average Daily Traffic: 62,100 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 171,968 (year 2032),  Design Load: HS 20,  Features Intersected: WATER WADING RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 17.453,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.2m (49.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.2m (33.5ft),  Curb-To-Curb Width: 15.2m (49.9ft),  Out-to-Out Width: 16.2m (53.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Very good,  Operating Rating: 70.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.10m (3.61ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 48 months,  Inspection Date: June 2021,  Underwater Inspection Date: August 2018,  Bridge Improvement Cost: $332,000,  Roadway Improvement Cost: $34,000,  Total Project Cost: $499,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030263XRDOTNBI,  Location: .1 E OF FOXBORO T.L. (Lat: 42.023069,  Lng: -71.261503),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 4.66m (15.29ft),  Average Daily Traffic: 2,000 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 6,317 (year 2032),  Design Load: H 20,  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.3m (76.4ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,596,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $2,395,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030263XTDOTNBI,  Location: .1 M E OF FOXBORO TL (Lat: 42.023664,  Lng: -71.262006),  Route carried "on" structure: City street ,  Year Built: 1962,  Status: Open,  Structure Length: 4.69m (15.39ft),  Average Daily Traffic: 2,456 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 6,317 (year 2032),  Design Load: H 20,  Features Intersected: I 95 SB,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.161,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 23.3m (76.4ft),  Curb or Sidewalk Widths: Left: 0.4m (1.3ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.70m (15.42ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $1,596,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $2,395,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030273RJDOTNBI,  Location: I 495 AT I 95 (Lat: 42.026581,  Lng: -71.256589),  Route carried "on" structure: Interstate 495,  Year Built: 1965,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 47,377 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 66,331 (year 2031),  Design Load: HS 20,  Features Intersected: I 95 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.025,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 33.2m (108.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,434,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $3,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030273RKDOTNBI,  Location: I 495 AT I 95 (Lat: 42.026306,  Lng: -71.256964),  Route carried "on" structure: Interstate 495,  Year Built: 1965,  Status: Open,  Structure Length: 3.47m (11.38ft),  Average Daily Traffic: 45,525 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 66,331 (year 2031),  Design Load: HS 20,  Features Intersected: I 95 NB
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.025,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 15.8m (51.8ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 34.1m (111.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 15.8m (51.8ft),  Out-to-Out Width: 17.7m (58.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 54.8 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 27.8 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,434,000,  Roadway Improvement Cost: $244,000,  Total Project Cost: $3,652,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030283XUDOTNBI,  Location: .4 MI NW OF I 95 (Lat: 42.024350,  Lng: -71.252033),  Route carried "on" structure: City street ,  Year Built: 1976,  Status: Open,  Structure Length: 10.70m (35.10ft),  Average Daily Traffic: 5,900 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 10,265 (year 2033),  Design Load: H 20,  Features Intersected: I 495,  Facility Carried by Structure: HWY WEST ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.506,  Lanes on structure: 2,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 52.4m (171.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.8m (45.3ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 85.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 51.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.80m (35.43ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $2,444,000,  Roadway Improvement Cost: $245,000,  Total Project Cost: $3,667,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030293P3DOTNBI,  Location: 1.5 MI NW OF I 495 (Lat: 42.019878,  Lng: -71.229025),  Route carried "on" structure: State highway 140,  Year Built: 1980,  Status: Open,  Structure Length: 2.68m (8.79ft),  Average Daily Traffic: 21,196 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 47,379 (year 2032),  Design Load: HS 20,  Features Intersected: RR AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 55.843,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 26.8m (87.9ft),  Skew: 24 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.9m (85.0ft),  Curb-To-Curb Width: 26.8m (87.9ft),  Out-to-Out Width: 36.9m (121.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 72.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Superior to present desirable criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.70m (8.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,914,000,  Roadway Improvement Cost: $392,000,  Total Project Cost: $5,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Precast Panels,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030303RCDOTNBI,  Location: 2 MI E OF I 95 (Lat: 42.012106,  Lng: -71.232925),  Route carried "on" structure: Interstate 495,  Year Built: 1978,  Status: Open,  Structure Length: 2.77m (9.09ft),  Average Daily Traffic: 39,135 (year 2019),  Truck Traffic: 10%,  Average Future Daily Traffic: 62,382 (year 2031),  Design Load: HS 20,  Features Intersected: HWY SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.532,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 26.5m (86.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 41.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 2.80m (9.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $1,914,000,  Roadway Improvement Cost: $192,000,  Total Project Cost: $2,872,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030303RDDOTNBI,  Location: 2.0 MI E OF I 95 (Lat: 42.012442,  Lng: -71.232689),  Route carried "on" structure: Interstate 495,  Year Built: 1978,  Status: Open,  Structure Length: 2.93m (9.61ft),  Average Daily Traffic: 47,400 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 55,276 (year 2031),  Design Load: H 20,  Features Intersected: HWY SCHOOL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.532,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.4m (57.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 56.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 3.00m (9.84ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $2,178,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $3,268,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030313P4DOTNBI,  Location: 2.2 MI. S.E. OF I-95 (Lat: 42.006528,  Lng: -71.224461),  Route carried "on" structure: State highway 140,  Year Built: 1978,  Status: Open,  Structure Length: 12.80m (41.99ft),  Average Daily Traffic: 7,100 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 39,482 (year 2032),  Design Load: HS 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.910,  Lanes on structure: 4,  Lanes under structure: 9,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 33 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 38.4m (126.0ft),  Curb-To-Curb Width: 28.7m (94.2ft),  Out-to-Out Width: 29.6m (97.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 54.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 12.90m (42.32ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $7,199,000,  Roadway Improvement Cost: $720,000,  Total Project Cost: $10,799,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030323REDOTNBI,  Location: .1 MI SW OF OLD ST 140 (Lat: 42.001333,  Lng: -71.215078),  Route carried "on" structure: Interstate 495,  Year Built: 1978,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 40,000 (year 2018),  Truck Traffic: 3%,  Average Future Daily Traffic: 77,228 (year 2031),  Design Load: H 20,  Features Intersected: WATER RUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.601,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 29.6m (97.1ft),  Skew: 30 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 29.6m (97.1ft),  Out-to-Out Width: 35.1m (115.2ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 54.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 37.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $1,059,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $1,589,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M030323RFDOTNBI,  Location: .1 MI SW OF OLD ST 140 (Lat: 42.001942,  Lng: -71.214744),  Route carried "on" structure: Interstate 495,  Year Built: 1978,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 50,700 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 77,228 (year 2033),  Design Load: HS 20,  Features Intersected: WATER RUMFORD RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 48.601,  Lanes on structure: 6,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 35.1m (115.2ft),  Skew: 20 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 35.0m (114.8ft),  Out-to-Out Width: 57.0m (187.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Good,  Operating Rating: 52.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 1.60m (5.25ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2022,  Bridge Improvement Cost: $1,720,000,  Roadway Improvement Cost: $173,000,  Total Project Cost: $2,581,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M030333XVDOTNBI,  Location: EX ST 140 NB & OLD ST 140 (Lat: 42.000569,  Lng: -71.211103),  Route carried "on" structure: State highway 140,  Year Built: 1978,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 9.01m (29.56ft),  Average Daily Traffic: 10,015 (year 2019),  Truck Traffic: 6%,  Average Future Daily Traffic: 29,059 (year 2032),  Design Load: H 20,  Features Intersected: I 495
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 17.4m (57.1ft),  Skew: 2 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 20.3m (66.6ft),  Out-to-Out Width: 21.1m (69.2ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 71.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Equal to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 9.10m (29.86ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,545,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $2,318,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: M030343RGDOTNBI,  Location: 1.9 MI E OF I 95 (Lat: 42.013278,  Lng: -71.233903),  Route carried "on" structure: Interstate 495,  Year Built: 1978,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 45,111 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: HS 20,  Features Intersected: COMB FORBS//AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.693,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,872,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $5,809,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030343RHDOTNBI,  Location: 1.9 MI E OF I 95 (Lat: 42.012953,  Lng: -71.234233),  Route carried "on" structure: Interstate 495,  Year Built: 1978,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 44,107 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 63,172 (year 2032),  Design Load: HS 20,  Features Intersected: COMB FORBS//AMTRAK/MBTA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 50.693,  Lanes on structure: 3,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 29.3m (96.1ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 17.6m (57.7ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Superior to present desirable criteria,  Length Of Structure Improvement: 5.60m (18.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: Febuary 2021,  Bridge Improvement Cost: $3,872,000,  Roadway Improvement Cost: $388,000,  Total Project Cost: $5,809,000 ( Estimate for 2022),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Built-up
Find on map >>   Show street view

Structure Number: M030353LJMUNNBI,  Location: 0.1 MI W OF RUMFOR AVE (Lat: 42.028497,  Lng: -71.220606),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 700 (year 2018),  Average Future Daily Traffic: 1,106 (year 2031),  Design Load: HS 20,  Features Intersected: WATER RUMFORD RIVER,  Facility Carried by Structure: HWY HIGH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.515,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.7m (12.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.2m (40.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 38.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 23.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.90m (2.95ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $278,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $418,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: M03037B73MUNNBI,  Location: 0.1 M W OF MNSFIELD CENTR (Lat: 42.029167,  Lng: -71.220994),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 0.72m (2.36ft),  Average Daily Traffic: 800 (year 2018),  Truck Traffic: 16%,  Average Future Daily Traffic: 948 (year 2031),  Design Load: HS 20,  Features Intersected: WATER RUMFORD RIVER,  Facility Carried by Structure: HWY W CHURCH ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.450,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.2m (23.6ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 12.4m (40.7ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 54.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.40m (1.31ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $271,000,  Roadway Improvement Cost: $28,000,  Total Project Cost: $407,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: M03043AEAMUNNBI,  Location: AT ROBINSON POND (Lat: 42.011636,  Lng: -71.262844),  Route carried "on" structure: City street ,  Year Built: 2004,  Status: Open,  Structure Length: 1.10m (3.61ft),  Average Daily Traffic: 1,700 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 2,448 (year 2031),  Design Load: HS 20,  Features Intersected: WATER WADING RIVER,  Facility Carried by Structure: HWY WILLIAMS ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.949,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb or Sidewalk Widths: Left: 1.6m (5.2ft),  Right: 0.1m (0.3ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.4m (34.1ft)

Condition: Superstructure: Good,  Substructure: Very good,  Channel: Good,  Inventory Rating: 62.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.20m (3.94ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $621,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $932,000 ( Estimate for 2022)
Find on map >>   Show street view

Structure Number: M030263XRDOTNBI,  Location: 000062 STATUTORY (Lat: 42.016667,  Lng: -71.266667),  Route carried "under" structure: Interstate 95,  Year Built: 1962,  Structure Length: 0. m,  Average Daily Traffic: 1,600 (year 0000),  Features Intersected: I 95 NB,  Facility Carried by Structure: HWY GROVE ST
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 24.1m (79.1ft)

Discuss Mansfield, Massachusetts (MA) on our hugely popular Massachusetts forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.