Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Waterford, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 12Number of bridges
  • 217ft / 66.4mTotal length
  • $50,245,000Total costs
  • 41,071Total average daily traffic
  • 2,217Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Waterford
  • No street view available for this location

New bridges in Waterford, NY - historical statistics
  • New bridges - historical statistics
  • 51900-1909
  • 11910-1919
  • 11930-1939
  • 11940-1949
  • 11980-1989
  • 31990-1999
Reconstructed bridges in Waterford, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 41990-1999
  • 02000-2009
  • 12010-2019
Average Bridge Daily Traffic in Waterford, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 25.0%Good
  • 37.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 12.5%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 12.5%Very good
  • 12.5%Good
  • 37.5%Satisfactory
  • 37.5%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 40.0%Very good
  • 20.0%Good
  • 20.0%Satisfactory
  • 20.0%Fair
Find on map >>   Show street view

Structure Number: 226798,  Location: RT32 .5MI S OF WATERFORD (Lat: 42.787383,  Lng: -73.691931),  Route carried "on" structure: Business City street ,  Year Built: 1988,  Status: Open,  Structure Length: 1.13m (3.71ft),  Truck Traffic: 10%,  Design Load: HS 20,  Features Intersected: OLD CHAMPLAIN CANAL,  Facility Carried by Structure: OCONNOR DRIVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 80.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $182,000,  Roadway Improvement Cost: $106,000,  Total Project Cost: $288,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330346,  Location: 2.0MI W OF MELROSE (Lat: 42.833992,  Lng: -73.663989),  Route carried "on" structure: County highway ,  Year Built: 1949,  Status: Posted for load,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 731 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 1,023 (year 2036),  Features Intersected: HUDSONR.BACKWATER,  Facility Carried by Structure: RIVER RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.237,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 6.6m (21.7ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: April 2021,  Underwater Inspection Date: September 2018,  Bridge Improvement Cost: $430,000,  Roadway Improvement Cost: $252,000,  Total Project Cost: $682,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336419,  Location: IN WATERFORD (Lat: 42.794447,  Lng: -73.679919),  Route carried "on" structure: City street ,  Year Built: 1999,  Status: Open,  Structure Length: 2.65m (8.69ft),  Average Daily Traffic: 5,619 (year 2020),  Truck Traffic: 3%,  Average Future Daily Traffic: 6,825 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DELAWARE & HUDSON,  Facility Carried by Structure: SIXTH STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.451,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 13.1m (43.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.9m (81.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 13.2m (43.3ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.65m (8.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,654,000,  Roadway Improvement Cost: $969,000,  Total Project Cost: $2,623,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 400095,  Location: JCT RTE 4 HUDSON RIVER (Lat: 42.788281,  Lng: -73.672667),  Route carried "on" structure: US 4,  Year Built: 1909,  Year Reconstructed: 2017,  Status: Posted for load-capacity,  Structure Length: 22.65m (74.31ft),  Average Daily Traffic: 10,184 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 10,231 (year 2040),  Features Intersected: HUDSON R & CANAL
Minimum Vertical Clearance: 4.69m (15.39ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Navigation Control: Yes ( Vertical Clearance: 6.7m (22.0ft), Horizontal Clearance: 30.4m (99.7ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 61.0m (200.1ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 22.64m (74.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: September 2021,  Critical Feature Inspection Date: September 2021,  Underwater Inspection Date: May 2018,  Bridge Improvement Cost: $11,607,000,  Roadway Improvement Cost: $6,797,000,  Total Project Cost: $18,405,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 402251,  Location: JCT RTE 32 & ERIE CANAL (Lat: 42.791628,  Lng: -73.684414),  Route carried "on" structure: State highway 32,  Year Built: 1907,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 11,789 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 11,844 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: ERIE CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.915,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Navigation Control: Yes ( Vertical Clearance: 6.0m (19.7ft), Horizontal Clearance: 9.3m (30.5ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.1m (121.7ft),  Curb or Sidewalk Widths: Left: 2.1m (6.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 16.8m (55.1ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 70.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $6,068,000,  Roadway Improvement Cost: $3,553,000,  Total Project Cost: $9,621,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Cathodic Protection
Find on map >>   Show street view

Structure Number: 402252,  Location: SH 32 & OLD CHAMPLAIN CNL (Lat: 42.790972,  Lng: -73.680681),  Route carried "on" structure: State highway 32,  Year Built: 1995,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 9,610 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 9,655 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OLD CHAMPLAIN CANAL
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.220,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 14.3m (46.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 4.6m (15.1ft),  Curb or Sidewalk Widths: Left: 3.0m (9.8ft),  Right: 2.4m (7.9ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $515,000,  Roadway Improvement Cost: $302,000,  Total Project Cost: $817,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 441506,  Location: IN WATERFORD (Lat: 42.790203,  Lng: -73.686025),  Route carried "on" structure: Other road ,  Year Built: 1938,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 3.51m (11.52ft),  Average Daily Traffic: 559 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 783 (year 2036),  Design Load: HS 20,  Features Intersected: OLD CHAMPLN CANAL,  Facility Carried by Structure: BURTON AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.016,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 17.0m (55.8ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 6.7m (22.0ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 72.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 3.50m (11.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $643,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $1,019,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 441508,  Location: IN WATERFORD (Lat: 42.791953,  Lng: -73.680122),  Route carried "on" structure: Other road ,  Year Built: 1994,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,829 (year 2019),  Truck Traffic: 2%,  Average Future Daily Traffic: 2,263 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OLD CHAMPLN CANAL,  Facility Carried by Structure: DIVISION STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.290,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 5.1m (16.7ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $189,000,  Roadway Improvement Cost: $111,000,  Total Project Cost: $300,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 441509,  Location: WATERFORD @ E1 & ERIE C (Lat: 42.785958,  Lng: -73.679567),  Route carried "on" structure: ServiceOther road ,  Year Built: 1913,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 20.42m (66.99ft),  Truck Traffic: 10%,  Features Intersected: ERIE BARGE CANAL, CANAL,  Facility Carried by Structure: BR. TO PEEBLES IS
Minimum Vertical Clearance: 6.78m (22.24ft),  Kilometerpoint: 0.193,  Lanes on structure: 1,  Owner: State Agenciy,  Approaching Roadway Width: 5.2m (17.1ft),  Skew: 3 degrees,  Navigation Control: Yes ( Vertical Clearance: 6.1m (20.0ft), Horizontal Clearance: 30.4m (99.7ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 2,  Number Of Approach Spans: 5,  Length of Maximum Span: 49.1m (161.1ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 3.0m (9.8ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 5.2m (17.1ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 62.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 20.42m (66.99ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Underwater Inspection Date: July 2021,  Bridge Improvement Cost: $7,440,000,  Roadway Improvement Cost: $4,357,000,  Total Project Cost: $11,797,000 ( Estimate for 2021),  Deck Structure Type: Open Grating,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 44151,  Location: FOURTH ST & ERIE C @ E2 (Lat: 42.788553,  Lng: -73.680772),  Route carried "on" structure: City street ,  Year Built: 1907,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 4.97m (16.31ft),  Truck Traffic: 5%,  Design Load: HS 20,  Features Intersected: ERIE CANAL,  Facility Carried by Structure: FOURTH STREET
Minimum Vertical Clearance: 5.84m (19.16ft),  Kilometerpoint: 0.080,  Lanes on structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Navigation Control: Yes ( Vertical Clearance: 8.2m (26.9ft), Horizontal Clearance: 30.1m (98.8ft)),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.8m (156.8ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 5.4m (17.7ft),  Out-to-Out Width: 5.9m (19.4ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 4.96m (16.27ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Critical Feature Inspection Date: September 2020,  Bridge Improvement Cost: $2,600,000,  Roadway Improvement Cost: $1,523,000,  Total Project Cost: $4,123,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 441514,  Location: LOCK 3E ACCESS & ERIE C (Lat: 42.795650,  Lng: -73.685686),  Route carried "on" structure: Ramp State lands road ,  Year Built: 1906,  Status: Posted for load,  Structure Length: 3.81m (12.50ft),  Average Daily Traffic: 250 (year 2009),  Truck Traffic: 10%,  Average Future Daily Traffic: 350 (year 2029),  Features Intersected: CANAL LOCK 3SPLWY,  Facility Carried by Structure: ACCESS RD-LOCK E3
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 1,  Owner: State Highway Agency,  Approaching Roadway Width: 3.4m (11.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Number Of Approach Spans: 1,  Length of Maximum Span: 9.4m (30.8ft),  Curb-To-Curb Width: 3.6m (11.8ft),  Out-to-Out Width: 3.7m (12.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 17.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 10.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: High priority of corrective action,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.20m (10.50ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $360,000,  Roadway Improvement Cost: $211,000,  Total Project Cost: $570,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 441512,  Location: .25MI.UPSTREAM OF RTE32BR (Lat: 42.793200,  Lng: -73.685531),  Route carried "under" structure: ServiceOther road ,  Year Built: 1907,  Structure Length: 0. m,  Average Daily Traffic: 500 (year 2021),  Features Intersected: D O T SHOP ROAD, ERIE-BA,  Facility Carried by Structure: D&H RAILROAD 153S
Minimum Vertical Clearance: 4.37m (14.34ft),  Kilometerpoint: 0.000,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Length of Maximum Span: 19.2m (63.0ft)

Discuss Waterford, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.