  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 75ft / 23.4mTotal length
  • $21,537,000Total costs
  • 18,163Total average daily traffic
  • 375Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Taghkanic
  • No street view available for this location

New bridges in Taghkanic, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11940-1949
  • 41950-1959
  • 21960-1969
  • 32010-2019
  • 22020-2022
Average Bridge Daily Traffic in Taghkanic, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 10.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 10.0%Fair
  • 30.0%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 20.0%Excellent
  • 20.0%Very good
  • 10.0%Satisfactory
  • 30.0%Fair
  • 20.0%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 10.0%Very good
  • 30.0%Good
  • 20.0%Satisfactory
  • 40.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 22.2%Good
  • 44.4%Satisfactory
  • 33.3%Fair
Find on map >>   Show street view

Structure Number: 103238,  Location: JCT RTE 82+TSP (Lat: 42.117917,  Lng: -73.714608),  Route carried "on" structure: State highway 82,  Year Built: 1952,  Status: Open,  Structure Length: 3.08m (10.10ft),  Average Daily Traffic: 1,102 (year 2019),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,149 (year 2040),  Design Load: HS 20,  Features Intersected: RTE 987G
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.836,  Lanes on structure: 4,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 17.1m (56.1ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 17.1m (56.1ft),  Out-to-Out Width: 19.5m (64.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.07m (10.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $3,334,000,  Roadway Improvement Cost: $1,952,000,  Total Project Cost: $5,286,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 322293,  Location: 0.9 MI S OF W TAGHKANIC (Lat: 42.137042,  Lng: -73.726942),  Route carried "on" structure: Other road ,  Year Built: 1922,  Status: Open,  Structure Length: 2.10m (6.89ft),  Average Daily Traffic: 124 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 174 (year 2038),  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: OLD ROUTE 82
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.641,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 10.1m (33.1ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.2m (23.6ft)

Condition: Deck: Poor,  Superstructure: Poor,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 65.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 2.10m (6.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $869,000,  Roadway Improvement Cost: $509,000,  Total Project Cost: $1,378,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322294,  Location: 1.1 MI NW OF COPAKE LAKE (Lat: 42.160239,  Lng: -73.610981),  Route carried "on" structure: Other road ,  Year Built: 1940,  Status: Open,  Structure Length: 1.77m (5.81ft),  Average Daily Traffic: 658 (year 2017),  Truck Traffic: 3%,  Average Future Daily Traffic: 921 (year 2037),  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: COPAKE LAKE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.0m (55.8ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.1 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 60.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.76m (5.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $893,000,  Roadway Improvement Cost: $523,000,  Total Project Cost: $1,416,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322295,  Location: 1.1 MI W OF COPAKE LAKE (Lat: 42.150347,  Lng: -73.622842),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 83 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 116 (year 2036),  Design Load: H 20,  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: BERKSHIRE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.848,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.1m (75.8ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Satisfactory,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Fair,  Operating Rating: 70.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 51.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $729,000,  Roadway Improvement Cost: $427,000,  Total Project Cost: $1,156,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 322297,  Location: 2.7 MI SE OF W. TAGHKANIC (Lat: 42.106450,  Lng: -73.673872),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 9 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 13 (year 2036),  Design Load: HS 20,  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: NEW FORGE ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.432,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 5.2m (17.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.5m (54.1ft),  Curb-To-Curb Width: 5.2m (17.1ft),  Out-to-Out Width: 6.4m (21.0ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Channel: Good,  Inventory Rating: 68.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $475,000,  Roadway Improvement Cost: $278,000,  Total Project Cost: $753,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33423,  Location: AT W TAGHKANIC (Lat: 42.123575,  Lng: -73.721167),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 719 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,007 (year 2040),  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: COUNTY ROAD 10
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.048,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.2m (72.8ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 9.0m (29.5ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Good,  Operating Rating: 29.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $1,101,000,  Roadway Improvement Cost: $645,000,  Total Project Cost: $1,745,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334231,  Location: 1.1 MI SE OF TAGHKANIC (Lat: 42.132117,  Lng: -73.656672),  Route carried "on" structure: County highway ,  Year Built: 2015,  Status: Open,  Structure Length: 2.04m (6.69ft),  Average Daily Traffic: 470 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 658 (year 2039),  Design Load: HL 93,  Features Intersected: TAGHKANIC CREEK,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.916,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.04m (6.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $778,000,  Roadway Improvement Cost: $455,000,  Total Project Cost: $1,233,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 334251,  Location: 1.0 MI SE OF TAGHKANIC (Lat: 42.131256,  Lng: -73.660492),  Route carried "on" structure: County highway ,  Year Built: 2018,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 470 (year 2019),  Truck Traffic: 4%,  Average Future Daily Traffic: 658 (year 2039),  Design Load: HL 93,  Features Intersected: TAGHKANIC CREEK TRIBUTAR,  Facility Carried by Structure: COUNTY ROAD 27
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.562,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 79.1 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.97m (3.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $549,000,  Roadway Improvement Cost: $322,000,  Total Project Cost: $871,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 334252,  Location: 1.1 MI SE OF PHILMONT (Lat: 42.133083,  Lng: -73.663400),  Route carried "on" structure: County highway ,  Year Built: 1967,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 664 (year 2020),  Truck Traffic: 6%,  Average Future Daily Traffic: 930 (year 2040),  Design Load: HS 20,  Features Intersected: WEST CREEK,  Facility Carried by Structure: COUNTY ROAD 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Channel: Fair,  Culverts: Good,  Operating Rating: 61.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $407,000,  Roadway Improvement Cost: $239,000,  Total Project Cost: $646,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 5502509,  Location: 0.5 MI SW OF W TAGHKANIC (Lat: 42.120622,  Lng: -73.712933),  Route carried "on" structure: State highway 987G,  Year Built: 1954,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 3,332 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,993 (year 2040),  Design Load: H 20,  Features Intersected: TAGHKANIC CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.357,  Lanes on structure: 5,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 18.3m (60.0ft),  Skew: 30 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 20.7m (67.9ft),  Curb or Sidewalk Widths: Left: 1.8m (5.9ft),  Right: 2.1m (6.9ft),  Curb-To-Curb Width: 18.3m (60.0ft),  Out-to-Out Width: 25.9m (85.0ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 30.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.26m (13.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $4,448,000,  Roadway Improvement Cost: $2,605,000,  Total Project Cost: $7,053,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 5502519,  Location: 1.1 MI NW OF TAGHKANIC (Lat: 42.153075,  Lng: -73.691500),  Route carried "on" structure: State highway 987,  Year Built: 2021,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 3,332 (year 2020),  Truck Traffic: 1%,  Average Future Daily Traffic: 7,993 (year 2040),  Design Load: HL 93,  Features Intersected: CR 27
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 16.557,  Lanes on structure: 4,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 21.9m (71.9ft),  Skew: 20 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 21.9m (71.9ft),  Out-to-Out Width: 23.8m (78.1ft)

Condition: Deck: Good,  Superstructure: Excellent,  Substructure: Good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103238,  Location: JCT RTE 82+TSP (Lat: 42.117917,  Lng: -73.714608),  Route carried "under" structure: Other road 987G,  Year Built: 1952,  Structure Length: 0. m,  Average Daily Traffic: 7,200 (year 1982),  Features Intersected: RTE 987G,  Facility Carried by Structure: RTE 82
Minimum Vertical Clearance: 4.78m (15.68ft),  Kilometerpoint: 17.297,  Lanes on structure: 4,  Lanes under structure: 4,  Material/Design: Concrete,  Design/Construction: Frame,  Length of Maximum Span: 15.2m (49.9ft)

Find on map >>   Show street view

Structure Number: 5502519,  Location: 1.1 MI NW OF TAGHKANIC (Lat: 42.153075,  Lng: -73.691500),  Route carried "under" structure: County highway ,  Year Built: 2021,  Structure Length: 0. m,  Features Intersected: CR 27,  Facility Carried by Structure: RTE 987
Minimum Vertical Clearance: 4.60m (15.09ft),  Kilometerpoint: 0.209,  Lanes on structure: 4,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Discuss Taghkanic, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.