Bridge Statistics for Sherburne, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 20Number of bridges
  • 125ft / 38.2mTotal length
  • $19,894,000Total costs
  • 29,537Total average daily traffic
  • 2,533Total average daily truck traffic
  • 32,373Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sherburne
  • No street view available for this location

New bridges in Sherburne, NY - historical statistics
  • New bridges - historical statistics
  • 11900-1909
  • 11920-1929
  • 41930-1939
  • 11940-1949
  • 11950-1959
  • 11960-1969
  • 21980-1989
  • 62000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Sherburne, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 21980-1989
  • 11990-1999
  • 12000-2009
Average Bridge Daily Traffic in Sherburne, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 17.6%Excellent
  • 11.8%Very good
  • 29.4%Good
  • 11.8%Satisfactory
  • 23.5%Fair
  • 5.9%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 17.6%Excellent
  • 11.8%Very good
  • 23.5%Good
  • 5.9%Satisfactory
  • 35.3%Fair
  • 5.9%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.8%Excellent
  • 5.9%Very good
  • 23.5%Good
  • 29.4%Satisfactory
  • 29.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Very good
  • 20.0%Good
  • 45.0%Satisfactory
  • 10.0%Fair
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Very good
  • 66.7%Good
Find on map >>   Show street view

Structure Number: 100941,  Location: 1.9 MI S JCT RTS 12 + 80 (Lat: 42.653711,  Lng: -75.488494),  Route carried "on" structure: State highway 12,  Year Built: 1927,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 6,096 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 6,153 (year 2040),  Features Intersected: NEGRO HOLLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 61.721,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 37.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 28.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $449,000,  Roadway Improvement Cost: $263,000,  Total Project Cost: $713,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100942,  Location: .4 MI N JCT SH 12 & SH12B (Lat: 42.695253,  Lng: -75.500739),  Route carried "on" structure: State highway 12,  Year Built: 2002,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 2,578 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 2,602 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HANDSOME BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 66.790,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.4m (30.8ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Good,  Operating Rating: 59.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 35.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $702,000,  Roadway Improvement Cost: $411,000,  Total Project Cost: $1,113,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100984,  Location: .1 MI NW JCT SH 12B & SH (Lat: 42.690631,  Lng: -75.503828),  Route carried "on" structure: State highway 12B,  Year Built: 1957,  Status: Open,  Structure Length: 1.89m (6.20ft),  Average Daily Traffic: 4,189 (year 2018),  Truck Traffic: 7%,  Average Future Daily Traffic: 4,214 (year 2040),  Design Load: H 20,  Features Intersected: HANDSOME BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.225,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 17.3m (56.8ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 13.5m (44.3ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 31.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.88m (6.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $936,000,  Roadway Improvement Cost: $548,000,  Total Project Cost: $1,484,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103073,  Location: .6 MI W JCT SH 80 & SH 12 (Lat: 42.678606,  Lng: -75.510597),  Route carried "on" structure: State highway 80,  Year Built: 2002,  Status: Open,  Structure Length: 7.56m (24.80ft),  Average Daily Traffic: 2,352 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,453 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHENANGO RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.689,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Skew: 1 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 37.5m (123.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 72.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.55m (24.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,113,000,  Roadway Improvement Cost: $1,237,000,  Total Project Cost: $3,350,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103074,  Location: .5 MI W JCT SH 80 & SH 12 (Lat: 42.678536,  Lng: -75.510133),  Route carried "on" structure: State highway 80,  Year Built: 2003,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,352 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,453 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHENANGO R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.705,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $454,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103075,  Location: .4 MI W JCT SH 80 & SH 12 (Lat: 42.678433,  Lng: -75.507903),  Route carried "on" structure: State highway 80,  Year Built: 2003,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 2,352 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,453 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: CHENANGO R OVERFLOW
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.834,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 10.8m (35.4ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Channel: Very good,  Culverts: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $286,000,  Roadway Improvement Cost: $168,000,  Total Project Cost: $454,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103076,  Location: 0.2 MI W JCT RTS 80 + 12 (Lat: 42.678267,  Lng: -75.501406),  Route carried "on" structure: State highway 80,  Year Built: 1906,  Year Reconstructed: 1967,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 2,352 (year 2020),  Truck Traffic: 9%,  Average Future Daily Traffic: 2,453 (year 2040),  Features Intersected: MUD CREEK OVERFLO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 22.429,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 0.0m,  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 47.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.5 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $400,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103077,  Location: 1.6 MI E JCT RTS 80 + 12 (Lat: 42.679675,  Lng: -75.468017),  Route carried "on" structure: State highway 80,  Year Built: 1987,  Status: Open,  Structure Length: 2.90m (9.51ft),  Average Daily Traffic: 1,626 (year 2019),  Truck Traffic: 11%,  Average Future Daily Traffic: 1,696 (year 2040),  Design Load: HS 20,  Features Intersected: MAD BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.245,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.7m (90.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 53.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.89m (9.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $892,000,  Roadway Improvement Cost: $522,000,  Total Project Cost: $1,414,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 222634,  Location: 2.6 MI SOUTH OF SHERBURNE (Lat: 42.636772,  Lng: -75.497278),  Route carried "on" structure: Other road ,  Year Built: 2014,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 107 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 150 (year 2039),  Features Intersected: WEST BROOK,  Facility Carried by Structure: TRACY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.400,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Maintenance Responsibility: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 77.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $98,000,  Roadway Improvement Cost: $58,000,  Total Project Cost: $156,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 222641,  Location: 4.7 MI NE OF SHERBURNE (Lat: 42.732169,  Lng: -75.454147),  Route carried "on" structure: Other road ,  Year Built: 2020,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 74 (year 2017),  Truck Traffic: 5%,  Average Future Daily Traffic: 104 (year 2037),  Design Load: HL 93,  Features Intersected: HANDSOME BROOK,  Facility Carried by Structure: PALMER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.724,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.6m (61.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 58.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $644,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335137,  Location: 4.5 MI NO OF SHERBURNE (Lat: 42.726344,  Lng: -75.456003),  Route carried "on" structure: Other road ,  Year Built: 1935,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 203 (year 2016),  Truck Traffic: 10%,  Average Future Daily Traffic: 284 (year 2036),  Design Load: HS 20+Mod,  Features Intersected: TRIB HANDSOME BRK,  Facility Carried by Structure: KNAPP RD TR NO 11
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.347,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $302,000,  Roadway Improvement Cost: $177,000,  Total Project Cost: $479,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335138,  Location: 2.8 MI NO OF SHERBURNE (Lat: 42.724619,  Lng: -75.489278),  Route carried "on" structure: Other road ,  Year Built: 1939,  Year Reconstructed: 2004,  Status: Open,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 408 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 571 (year 2039),  Features Intersected: HANDSOME BROOK,  Facility Carried by Structure: KNAPP ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.8m (19.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.8m (42.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 79.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 47.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $382,000,  Roadway Improvement Cost: $224,000,  Total Project Cost: $606,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33514,  Location: 1.2 MI NO OF SHERBURNE (Lat: 42.705497,  Lng: -75.499947),  Route carried "on" structure: County highway ,  Year Built: 2003,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 911 (year 2016),  Truck Traffic: 2%,  Average Future Daily Traffic: 1,275 (year 2036),  Features Intersected: HANDSOME BROOK,  Facility Carried by Structure: COUNTY RD 24
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.032,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 10.9m (35.8ft),  Out-to-Out Width: 11.9m (39.0ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Very good,  Channel: Very good,  Inventory Rating: 60.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,157,000,  Roadway Improvement Cost: $678,000,  Total Project Cost: $1,835,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 335141,  Location: CHURCH HILL ROAD (Lat: 42.653239,  Lng: -75.477903),  Route carried "on" structure: Other road ,  Year Built: 1985,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 32 (year 2018),  Average Future Daily Traffic: 45 (year 2038),  Features Intersected: NEGRO HOLLOW CK,  Facility Carried by Structure: CHURCH HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 7.5m (24.6ft),  Out-to-Out Width: 7.9m (25.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $316,000,  Roadway Improvement Cost: $185,000,  Total Project Cost: $501,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335142,  Location: 3.7 MI SE OF SHERBURNE (Lat: 42.652917,  Lng: -75.438569),  Route carried "on" structure: Other road ,  Year Built: 1947,  Status: Posted for load,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 175 (year 2016),  Truck Traffic: 3%,  Average Future Daily Traffic: 245 (year 2036),  Features Intersected: NEGRO HOLLOW CREEK,  Facility Carried by Structure: PLEASANT VALLEY
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.248,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 10.9m (35.8ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.4m (27.6ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $363,000,  Roadway Improvement Cost: $213,000,  Total Project Cost: $576,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335143,  Location: .6 MI SOUTH OF SHERBURNE (Lat: 42.664869,  Lng: -75.494878),  Route carried "on" structure: Other road ,  Year Built: 1939,  Year Reconstructed: 1993,  Status: Posted for load,  Structure Length: 3.14m (10.30ft),  Average Daily Traffic: 314 (year 2018),  Average Future Daily Traffic: 440 (year 2038),  Features Intersected: CHENANGO RIVER,  Facility Carried by Structure: BLANDING ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.154,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.7m (100.7ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 21.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 12.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 3.13m (10.27ft),  Designated Inspection Frequency: Every 12 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $1,753,000,  Roadway Improvement Cost: $1,027,000,  Total Project Cost: $2,780,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335144,  Location: IN VILLAGE OF SHERBURNE (Lat: 42.671481,  Lng: -75.493408),  Route carried "on" structure: Other road ,  Year Built: 1965,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 275 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 385 (year 2036),  Features Intersected: MAD BROOK,  Facility Carried by Structure: Smith Drive
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 1.2m (3.9ft),  Right: 0.0m,  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 28.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 17.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $473,000,  Roadway Improvement Cost: $277,000,  Total Project Cost: $749,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335145,  Location: IN VILLAGE OF SHERBURNE (Lat: 42.676739,  Lng: -75.485644),  Route carried "on" structure: County highway ,  Year Built: 2002,  Status: Open,  Structure Length: 1.65m (5.41ft),  Average Daily Traffic: 2,697 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,776 (year 2038),  Design Load: HS 20,  Features Intersected: MAD BROOK,  Facility Carried by Structure: CHAPEL ST
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.030,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb or Sidewalk Widths: Left: 0.0m,  Right: 1.8m (5.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Good,  Channel: Fair,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.64m (5.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $638,000,  Roadway Improvement Cost: $373,000,  Total Project Cost: $1,011,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 335146,  Location: 1.4 MI EAST OF SHERBURNE (Lat: 42.681203,  Lng: -75.463456),  Route carried "on" structure: Other road ,  Year Built: 1937,  Year Reconstructed: 2008,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 286 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 400 (year 2036),  Features Intersected: MAD BROOK,  Facility Carried by Structure: EAST HILL ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.097,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.0m (26.2ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 80.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 48.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $477,000,  Roadway Improvement Cost: $279,000,  Total Project Cost: $756,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 335147,  Location: 2.9 MI EAST OF SHERBURNE (Lat: 42.691606,  Lng: -75.450308),  Route carried "on" structure: Other road ,  Year Built: 2019,  Status: Open,  Structure Length: 1.58m (5.18ft),  Average Daily Traffic: 158 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 221 (year 2036),  Features Intersected: MAD BROOK,  Facility Carried by Structure: COLLINS HILL RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.993,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 8.0m (26.2ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 49.6 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 38.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.58m (5.18ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $264,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $419,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Discuss Sherburne, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.