Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sheldon, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 15Number of bridges
  • 69ft / 21.2mTotal length
  • $13,917,000Total costs
  • 16,352Total average daily traffic
  • 1,508Total average daily truck traffic
  • 18,352Total future (year 2036) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sheldon
  • No street view available for this location

New bridges in Sheldon, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 31930-1939
  • 21950-1959
  • 21960-1969
  • 21970-1979
  • 11980-1989
  • 11990-1999
  • 12000-2009
  • 22010-2019
Reconstructed bridges in Sheldon, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 01990-1999
  • 12000-2009
Average Bridge Daily Traffic in Sheldon, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 12.5%Very good
  • 12.5%Good
  • 25.0%Satisfactory
  • 37.5%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 44.4%Good
  • 33.3%Fair
  • 22.2%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Good
  • 44.4%Satisfactory
  • 44.4%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 6.7%Very good
  • 20.0%Good
  • 53.3%Satisfactory
  • 13.3%Fair
  • 6.7%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Very good
  • 16.7%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 101612,  Location: .7 MI E JCT US 20A & SH77 (Lat: 42.771000,  Lng: -78.375542),  Route carried "on" structure: US 20A,  Year Built: 1928,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 3,609 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,631 (year 2040),  Features Intersected: CAYUGA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.208,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 90.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 54.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $617,000,  Roadway Improvement Cost: $361,000,  Total Project Cost: $978,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 101613,  Location: 0.1 MI W JCT RTS 20A + 98 (Lat: 42.763339,  Lng: -78.314331),  Route carried "on" structure: US 20A,  Year Built: 1985,  Status: Open,  Structure Length: 3.41m (11.19ft),  Average Daily Traffic: 3,609 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 3,631 (year 2040),  Design Load: HS 20,  Features Intersected: TONAWANDA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 2 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 32.6m (107.0ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 91.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 44.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.41m (11.19ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,013,000,  Roadway Improvement Cost: $593,000,  Total Project Cost: $1,606,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 101614,  Location: 0.2MI S JCT RTS 98 + 20A (Lat: 42.759742,  Lng: -78.311308),  Route carried "on" structure: US 20A,  Year Built: 1931,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 4,308 (year 2017),  Truck Traffic: 9%,  Average Future Daily Traffic: 4,334 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: STONY BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.355,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.1m (52.8ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.8m (38.7ft)

Condition: Deck: Excellent,  Superstructure: Poor,  Substructure: Fair,  Channel: Poor,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $967,000,  Roadway Improvement Cost: $566,000,  Total Project Cost: $1,533,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103565,  Location: 3.4MI S JCT RTS 98 + 20A (Lat: 42.711931,  Lng: -78.330639),  Route carried "on" structure: State highway 98,  Year Built: 1931,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 1,046 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,464 (year 2036),  Design Load: Pedestrian,  Features Intersected: EAST FORK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 27.546,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 46.0 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 35.6 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $665,000,  Roadway Improvement Cost: $389,000,  Total Project Cost: $1,054,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103566,  Location: 2.8MI S JCT RTS 98 + 20A (Lat: 42.718139,  Lng: -78.322058),  Route carried "on" structure: State highway 98,  Year Built: 1931,  Status: Open,  Structure Length: 1.49m (4.89ft),  Average Daily Traffic: 1,046 (year 2016),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,464 (year 2036),  Features Intersected: TONAWANDA CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 28.544,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.7m (28.5ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 37.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 21.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.49m (4.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $528,000,  Roadway Improvement Cost: $309,000,  Total Project Cost: $837,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332016,  Location: 6.2 MI S FOLSOMDALE (Lat: 42.737083,  Lng: -78.440842),  Route carried "on" structure: County highway ,  Year Built: 1973,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 491 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 687 (year 2038),  Design Load: HS 20,  Features Intersected: SHELDON CREEK,  Facility Carried by Structure: CENTERLINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.274,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.4m (11.2ft)

Condition: Channel: Fair,  Culverts: Very good,  Inventory Rating: 80.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $107,000,  Roadway Improvement Cost: $63,000,  Total Project Cost: $170,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332017,  Location: 1.0 MI N STRYKERSVILLE (Lat: 42.708653,  Lng: -78.448208),  Route carried "on" structure: Alternate County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.37m (4.49ft),  Average Daily Traffic: 924 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,294 (year 2040),  Design Load: HL 93,  Features Intersected: GLADE CREEK,  Facility Carried by Structure: DUTCH HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.1m (43.0ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 81.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.37m (4.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $642,000,  Roadway Improvement Cost: $376,000,  Total Project Cost: $1,017,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332018,  Location: 0.6 MI NW STRYKERSVILLE (Lat: 42.702089,  Lng: -78.456017),  Route carried "on" structure: Other road ,  Year Built: 1963,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 2.96m (9.71ft),  Average Daily Traffic: 303 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 424 (year 2040),  Design Load: H 15,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: FACTORY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.740,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 28.0m (91.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.7m (25.3ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Fair,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 34.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.95m (9.68ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $1,910,000,  Roadway Improvement Cost: $1,119,000,  Total Project Cost: $3,029,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332019,  Location: 0.1 MI W STRYKERSVILLE (Lat: 42.695144,  Lng: -78.450322),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 2.53m (8.30ft),  Average Daily Traffic: 258 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 361 (year 2038),  Design Load: HS 20,  Features Intersected: BUFFALO CREEK,  Facility Carried by Structure: SANDERS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 2 degrees,  Material/Design: Wood or Timber,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 62.6 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 2.52m (8.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $957,000,  Roadway Improvement Cost: $560,000,  Total Project Cost: $1,517,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 33202,  Location: 2.0 MI NE OF NORTH JAVA (Lat: 42.704703,  Lng: -78.311931),  Route carried "on" structure: Other road ,  Year Built: 2001,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 100 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 140 (year 2038),  Design Load: HS 25 or greater,  Features Intersected: E FK TONAWANDA CK,  Facility Carried by Structure: ALMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.306,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $135,000,  Roadway Improvement Cost: $79,000,  Total Project Cost: $214,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332021,  Location: 1.5 MI NW OF NORTH JAVA (Lat: 42.705022,  Lng: -78.346664),  Route carried "on" structure: Other road ,  Year Built: 1952,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 154 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 216 (year 2038),  Design Load: H 15,  Features Intersected: TONAWANDA CREEK,  Facility Carried by Structure: ALMETER ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.315,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.6m (24.9ft),  Curb-To-Curb Width: 6.4m (21.0ft),  Out-to-Out Width: 7.0m (23.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 50.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.2 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $228,000,  Roadway Improvement Cost: $133,000,  Total Project Cost: $361,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 332022,  Location: 1.8 MI NE NORTH JAVA (Lat: 42.698281,  Lng: -78.308072),  Route carried "on" structure: Other road ,  Year Built: 1960,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 171 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 239 (year 2038),  Features Intersected: E FK TONAWANDA CK,  Facility Carried by Structure: ROYCE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.322,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.9m (25.9ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.6m (24.9ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $326,000,  Roadway Improvement Cost: $191,000,  Total Project Cost: $516,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336644,  Location: 2 MI W OF JOHNSONBURG (Lat: 42.737681,  Lng: -78.357981),  Route carried "on" structure: County highway ,  Year Built: 1955,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 214 (year 2020),  Truck Traffic: 5%,  Average Future Daily Traffic: 300 (year 2040),  Features Intersected: CAYUGA CREEK,  Facility Carried by Structure: CENTERLINE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.494,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.4m (21.0ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.5m (24.6ft)

Condition: Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $253,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $401,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336954,  Location: 5 MI SE OF SHELDON (Lat: 42.711483,  Lng: -78.337561),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 89 (year 2018),  Truck Traffic: 2%,  Average Future Daily Traffic: 125 (year 2038),  Features Intersected: TONAWANDA CREEK,  Facility Carried by Structure: MAXON ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 79.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2020,  Bridge Improvement Cost: $235,000,  Roadway Improvement Cost: $138,000,  Total Project Cost: $373,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337133,  Location: 2.0 MI N STRYKERSVILLE (Lat: 42.728214,  Lng: -78.452350),  Route carried "on" structure: Alternate County highway ,  Year Built: 2016,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 30 (year 2016),  Average Future Daily Traffic: 42 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: Sheldon Creek,  Facility Carried by Structure: Falls Road
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft),  Curb-To-Curb Width: 7.6m (24.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 97.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 88.5 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2021,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $311,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Discuss Sheldon, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.