Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Sardinia, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 82ft / 24.7mTotal length
  • $15,672,000Total costs
  • 22,548Total average daily traffic
  • 2,387Total average daily truck traffic
  • 24,311Total future (year 2037) average daily traffic
  • National Bridge Inventory (NBI) Registered Bridges for Sardinia
  • No street view available for this location

New bridges in Sardinia, NY - historical statistics
  • New bridges - historical statistics
  • 31930-1939
  • 11950-1959
  • 11980-1989
  • 31990-1999
  • 52010-2019
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 60.0%Good
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 42.9%Excellent
  • 14.3%Very good
  • 28.6%Good
  • 14.3%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 42.9%Excellent
  • 42.9%Good
  • 14.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 8.3%Excellent
  • 25.0%Very good
  • 25.0%Good
  • 25.0%Satisfactory
  • 8.3%Fair
  • 8.3%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 16.7%Very good
  • 33.3%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Find on map >>   Show street view

Structure Number: 102451,  Location: 5.0 MI E JCT RTS 39 + 219 (Lat: 42.514283,  Lng: -78.591064),  Route carried "on" structure: State highway 39,  Year Built: 2016,  Status: Open,  Structure Length: 0.94m (3.08ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,189 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: OTIS CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Poor,  Operating Rating: 78.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 46.3 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.94m (3.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $713,000,  Roadway Improvement Cost: $417,000,  Total Project Cost: $1,130,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102452,  Location: 5.9 MI E JCT RTS 39 + 219 (Lat: 42.513075,  Lng: -78.573856),  Route carried "on" structure: State highway 39,  Year Built: 1932,  Status: Open,  Structure Length: 0.82m (2.69ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,189 (year 2040),  Features Intersected: HYLER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.642,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.1m (39.7ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 0.82m (2.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $277,000,  Roadway Improvement Cost: $162,000,  Total Project Cost: $440,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102453,  Location: 6.2 MI E JCT RTS 39 + 219 (Lat: 42.513667,  Lng: -78.567722),  Route carried "on" structure: State highway 39,  Year Built: 1932,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,189 (year 2040),  Features Intersected: DRESSER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.157,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.8m (15.7ft)

Condition: Channel: Excellent,  Culverts: Satisfactory,  Operating Rating: 73.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $339,000,  Roadway Improvement Cost: $198,000,  Total Project Cost: $537,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 102454,  Location: 7.6 MI E JCT RTS 39 + 219 (Lat: 42.518358,  Lng: -78.542414),  Route carried "on" structure: State highway 39,  Year Built: 2016,  Status: Open,  Structure Length: 1.28m (4.20ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,189 (year 2040),  Features Intersected: CATT CK BR
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.425,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.5m (41.0ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Channel: Very good,  Culverts: Very good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Testing,  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Testing,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.28m (4.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $467,000,  Roadway Improvement Cost: $273,000,  Total Project Cost: $740,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 102455,  Location: 1.4 MI W JCT RTS 39 & 16 (Lat: 42.540986,  Lng: -78.504153),  Route carried "on" structure: State highway 39,  Year Built: 1996,  Status: Open,  Structure Length: 2.87m (9.42ft),  Average Daily Traffic: 3,024 (year 2017),  Truck Traffic: 12%,  Average Future Daily Traffic: 3,189 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: HOSMER BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 41.544,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.4m (89.9ft),  Curb-To-Curb Width: 12.3m (40.4ft),  Out-to-Out Width: 12.9m (42.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.86m (9.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $2,235,000,  Roadway Improvement Cost: $1,309,000,  Total Project Cost: $3,544,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 332827,  Location: 3.5 MILES SE OF HOLLAND (Lat: 42.603339,  Lng: -78.495081),  Route carried "on" structure: County highway ,  Year Built: 1991,  Status: Open,  Structure Length: 6.10m (20.01ft),  Average Daily Traffic: 903 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 912 (year 2040),  Design Load: HS 20,  Features Intersected: NORFOLK SO/ B&P R,  Facility Carried by Structure: SO.PROTECTION RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.561,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 3 degrees,  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 22.8m (74.8ft),  Curb-To-Curb Width: 8.9m (29.2ft),  Out-to-Out Width: 9.9m (32.5ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 58.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 36.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.09m (19.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $2,264,000,  Roadway Improvement Cost: $1,326,000,  Total Project Cost: $3,589,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 33284,  Location: .9 MILE SOUTH OF SARDINIA (Lat: 42.527742,  Lng: -78.508550),  Route carried "on" structure: County highway ,  Year Built: 1958,  Year Reconstructed: 1989,  Status: Open,  Structure Length: 5.58m (18.31ft),  Average Daily Traffic: 1,179 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,651 (year 2037),  Design Load: HS 20,  Features Intersected: CATTARAUGUS CREEK,  Facility Carried by Structure: SAVAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 10.4m (34.1ft),  Out-to-Out Width: 11.0m (36.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 89.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 5.57m (18.27ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,433,000,  Roadway Improvement Cost: $839,000,  Total Project Cost: $2,273,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 332846,  Location: 2.8 MI.NE OF EAST CONCORD (Lat: 42.575228,  Lng: -78.597819),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 181 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 253 (year 2038),  Design Load: HL 93,  Features Intersected: SPENCER BROOK,  Facility Carried by Structure: ALLEN RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.342,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.6m (31.5ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $482,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33285,  Location: 1.1 MI NORTH OF SARDINIA (Lat: 42.556628,  Lng: -78.509914),  Route carried "on" structure: County highway ,  Year Built: 2013,  Status: Open,  Structure Length: 1.55m (5.09ft),  Average Daily Traffic: 675 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 945 (year 2037),  Design Load: HL 93,  Features Intersected: DRY CREEK,  Facility Carried by Structure: SAVAGE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.186,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 14.6m (47.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.55m (5.09ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $541,000,  Roadway Improvement Cost: $317,000,  Total Project Cost: $858,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 332869,  Location: 2.6 MI EAST OF SARDINIA (Lat: 42.551669,  Lng: -78.498986),  Route carried "on" structure: County highway ,  Year Built: 1934,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 1,705 (year 2020),  Truck Traffic: 10%,  Average Future Daily Traffic: 1,722 (year 2040),  Features Intersected: HOSMER BROOK,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 12.872,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.3m (27.2ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $622,000,  Roadway Improvement Cost: $365,000,  Total Project Cost: $987,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 336788,  Location: 3 MILES WEST OF SARDINA (Lat: 42.550886,  Lng: -78.571203),  Route carried "on" structure: County highway ,  Year Built: 1988,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 1,701 (year 2018),  Truck Traffic: 9%,  Average Future Daily Traffic: 1,718 (year 2040),  Design Load: HS 20,  Features Intersected: DRESSER CREEK,  Facility Carried by Structure: GENESEE ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.935,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Satisfactory,  Culverts: Good,  Operating Rating: 77.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $197,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $313,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 336833,  Location: 4 MILES SE OF HOLLAND (Lat: 42.606692,  Lng: -78.494731),  Route carried "on" structure: County highway ,  Year Built: 1993,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 903 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 912 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: E B CAZENOVIA CRK,  Facility Carried by Structure: S PROTECTION ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.963,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft),  Curb-To-Curb Width: 9.3m (30.5ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 72.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 55.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $237,000,  Roadway Improvement Cost: $139,000,  Total Project Cost: $376,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 337113,  Location: 2.4 MI. NE OF EAST CONCOR (Lat: 42.577275,  Lng: -78.605603),  Route carried "on" structure: County highway ,  Year Built: 2014,  Status: Open,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 181 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 253 (year 2038),  Design Load: HL 93,  Features Intersected: SPENCER BROOK,  Facility Carried by Structure: ALLEN ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.650,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 56.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2020,  Bridge Improvement Cost: $254,000,  Roadway Improvement Cost: $149,000,  Total Project Cost: $403,000 ( Estimate for 2021)
Discuss Sardinia, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.