Bridge Statistics for Ripley, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 13Number of bridges
  • 131ft / 40.4mTotal length
  • $24,449,000Total costs
  • 72,665Total average daily traffic
  • 7,051Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Ripley
  • No street view available for this location

New bridges in Ripley, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 111950-1959
  • 11990-1999
Average Bridge Daily Traffic in Ripley, NY
Average Bridge Truck Traffic in Ripley, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 16.7%Good
  • 33.3%Satisfactory
  • 50.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 16.7%Very good
  • 50.0%Satisfactory
  • 16.7%Fair
  • 16.7%Critical
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Good
  • 50.0%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 50.0%Very good
  • 50.0%Good
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Satisfactory
  • 50.0%Fair
Find on map >>   Show street view

Structure Number: 103001,  Location: 5.9 MI NW SHELDON CORNERS (Lat: 42.244975,  Lng: -79.696489),  Route carried "on" structure: State highway 76,  Year Built: 1928,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 730 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 737 (year 2040),  Features Intersected: GAGE GULF
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.516,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.8m (28.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 24.4m (80.1ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 47.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 1.00m (3.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $678,000,  Roadway Improvement Cost: $397,000,  Total Project Cost: $1,074,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103002,  Location: JCT RTS 76 + I-90 (Lat: 42.274947,  Lng: -79.716119),  Route carried "on" structure: State highway 76,  Year Built: 1957,  Status: Open,  Structure Length: 8.05m (26.41ft),  Average Daily Traffic: 383 (year 2020),  Truck Traffic: 4%,  Average Future Daily Traffic: 386 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90, TRIB T
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.410,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 18.0m (59.1ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Fair,  Channel: Very good,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present desirable criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.04m (26.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $3,706,000,  Roadway Improvement Cost: $2,170,000,  Total Project Cost: $5,876,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 105061,  Location: AT EXIT 61 OF I90 (Lat: 42.261453,  Lng: -79.744706),  Route carried "on" structure: State highway 950D,  Year Built: 1957,  Status: Open,  Structure Length: 4.39m (14.40ft),  Average Daily Traffic: 658 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 664 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.38m (14.37ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,658,000,  Roadway Improvement Cost: $971,000,  Total Project Cost: $2,629,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 105062,  Location: 0.6 MI NW JCT RTS 20&950D (Lat: 42.262125,  Lng: -79.745208),  Route carried "on" structure: State highway 950D,  Year Built: 1957,  Status: Open,  Structure Length: 4.48m (14.70ft),  Average Daily Traffic: 980 (year 2020),  Truck Traffic: 29%,  Average Future Daily Traffic: 989 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: RTE I90
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.917,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.0m (59.1ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 73.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 4.48m (14.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $1,687,000,  Roadway Improvement Cost: $988,000,  Total Project Cost: $2,674,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 332547,  Location: 0.7 MI N OF SOUTH RIPLEY (Lat: 42.204406,  Lng: -79.701872),  Route carried "on" structure: County highway ,  Year Built: 1990,  Status: Open,  Structure Length: 2.59m (8.50ft),  Average Daily Traffic: 104 (year 2019),  Truck Traffic: 3%,  Average Future Daily Traffic: 146 (year 2039),  Design Load: HS 20,  Features Intersected: TWENTYMILE CREEK,  Facility Carried by Structure: COUNTY ROAD 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 6.436,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.9m (25.9ft),  Skew: 4 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.6m (80.7ft),  Curb-To-Curb Width: 8.2m (26.9ft),  Out-to-Out Width: 8.6m (28.2ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Fair,  Channel: Very good,  Operating Rating: 88.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 42.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.59m (8.50ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,094,000,  Roadway Improvement Cost: $641,000,  Total Project Cost: $1,734,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 551113,  Location: 2.3 MI NE OF RIPLEY INT (Lat: 42.276722,  Lng: -79.706775),  Route carried "on" structure: Other road ,  Year Built: 1957,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 8.69m (28.51ft),  Average Daily Traffic: 115 (year 2018),  Truck Traffic: 4%,  Average Future Daily Traffic: 161 (year 2038),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: WILEY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.772,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 7.9m (25.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.1m (65.9ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.68m (28.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $3,048,000,  Roadway Improvement Cost: $1,785,000,  Total Project Cost: $4,832,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 551114,  Location: 4.8 MI SW EXIT 60 OF I90 (Lat: 42.298325,  Lng: -79.657919),  Route carried "on" structure: Other road ,  Year Built: 1955,  Year Reconstructed: 1999,  Status: Open,  Structure Length: 10.36m (33.99ft),  Average Daily Traffic: 115 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 161 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: FORSYTH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.207,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Toll Authority,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 19.5m (64.0ft),  Curb or Sidewalk Widths: Left: 0.8m (2.6ft),  Right: 0.8m (2.6ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Fair,  Superstructure: Critical,  Substructure: Satisfactory,  Operating Rating: 57.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 44.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: High priority of replacement,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 10.36m (33.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $3,551,000,  Roadway Improvement Cost: $2,079,000,  Total Project Cost: $5,630,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 552532,  Location: 0.6 MI NNW RIPLEY (Lat: 42.274586,  Lng: -79.716183),  Route carried "on" structure: Interstate 90,  Year Built: 1957,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 12,980 (year 2020),  Truck Traffic: 51%,  Average Future Daily Traffic: 15,459 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: NY 76 N STATE ST, TRIB T
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 4.553,  Lanes on structure: 2,  Toll: On Interstate toll segment,  Owner: State Toll Authority,  Approaching Roadway Width: 13.7m (44.9ft),  Skew: 6 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.3m (24.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 77.7 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021
Find on map >>   Show street view

Structure Number: 103002,  Location: JCT RTS 76 + I-90 (Lat: 42.274947,  Lng: -79.716119),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 15,400 (year 1992),  Features Intersected: 90IX EB, RTE I90, TRIB T,  Facility Carried by Structure: RTE 76
Minimum Vertical Clearance: 4.47m (14.67ft),  Kilometerpoint: 793.494,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 105061,  Location: AT EXIT 61 OF I90 (Lat: 42.261453,  Lng: -79.744706),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,900 (year 1973),  Features Intersected: RTE I90,  Facility Carried by Structure: RTE 950D
Minimum Vertical Clearance: 4.44m (14.57ft),  Kilometerpoint: 796.342,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 105062,  Location: 0.6 MI NW JCT RTS 20&950D (Lat: 42.262125,  Lng: -79.745208),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 10,900 (year 1973),  Features Intersected: RTE I90,  Facility Carried by Structure: RTE 950D
Minimum Vertical Clearance: 4.45m (14.60ft),  Kilometerpoint: 796.326,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.0m (59.1ft)

Find on map >>   Show street view

Structure Number: 551113,  Location: 2.3 MI NE OF RIPLEY INT (Lat: 42.276722,  Lng: -79.706775),  Route carried "under" structure: Interstate 90,  Year Built: 1957,  Structure Length: 0. m,  Average Daily Traffic: 9,700 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: WILEY RD
Minimum Vertical Clearance: 4.42m (14.50ft),  Kilometerpoint: 792.706,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.1m (65.9ft)

Find on map >>   Show street view

Structure Number: 551114,  Location: 4.8 MI SW EXIT 60 OF I90 (Lat: 42.298325,  Lng: -79.657919),  Route carried "under" structure: Interstate 90,  Year Built: 1955,  Structure Length: 0. m,  Average Daily Traffic: 9,700 (year 1977),  Features Intersected: 90IX EB, RTE I90,  Facility Carried by Structure: FORSYTH ROAD
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 787.992,  Lanes on structure: 2,  Lanes under structure: 2,  Toll: On Interstate toll segment,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 19.5m (64.0ft)

Discuss Ripley, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.