Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Richland, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 27Number of bridges
  • 236ft / 72.5mTotal length
  • $31,355,000Total costs
  • 120,401Total average daily traffic
  • 8,498Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Richland
  • No street view available for this location

New bridges in Richland, NY - historical statistics
  • New bridges - historical statistics
  • 21930-1939
  • 11950-1959
  • 171960-1969
  • 11980-1989
  • 11990-1999
  • 42000-2009
  • 12010-2019
Reconstructed bridges in Richland, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 21980-1989
  • 01990-1999
  • 22000-2009
Average Bridge Daily Traffic in Richland, NY
Average Bridge Truck Traffic in Richland, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 11.8%Very good
  • 35.3%Good
  • 47.1%Satisfactory
  • 5.9%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 22.2%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 22.2%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 16.7%Very good
  • 33.3%Good
  • 22.2%Satisfactory
  • 16.7%Fair
  • 11.1%Poor
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 27.3%Good
  • 45.5%Satisfactory
Find on map >>   Show street view

Structure Number: 100035,  Location: 2.9 MI SW JCT RTS 3 + 13 (Lat: 43.529769,  Lng: -76.205550),  Route carried "on" structure: State highway 3,  Year Built: 1934,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 3,783 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,806 (year 2040),  Features Intersected: SNAKE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 51.665,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Concrete,  Design/Construction: Arch - Deck,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 6.7m (22.0ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 16.9m (55.4ft)

Condition: Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $299,000,  Roadway Improvement Cost: $175,000,  Total Project Cost: $474,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 100036,  Location: 1.7 MI S JCT RTS 3 & 13 (Lat: 43.542797,  Lng: -76.192353),  Route carried "on" structure: State highway 3,  Year Built: 1994,  Status: Open,  Structure Length: 3.11m (10.20ft),  Average Daily Traffic: 3,783 (year 2018),  Truck Traffic: 10%,  Average Future Daily Traffic: 3,806 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: GRINDSTONE CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 53.467,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 30.4m (99.7ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 63.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 49.2 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.10m (10.17ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: March 2020,  Bridge Improvement Cost: $780,000,  Roadway Improvement Cost: $457,000,  Total Project Cost: $1,237,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100037,  Location: .1 MI N JCT SH 3 & SH 13 (Lat: 43.567856,  Lng: -76.187322),  Route carried "on" structure: State highway 3,  Year Built: 2000,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 1,940 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,952 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.251,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.5m (41.0ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.5m (41.0ft),  Out-to-Out Width: 16.6m (54.5ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 46.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 36.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2020,  Bridge Improvement Cost: $3,604,000,  Roadway Improvement Cost: $2,110,000,  Total Project Cost: $5,714,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100038,  Location: .2 MI N JCT SH 3 & SH 13 (Lat: 43.569683,  Lng: -76.186953),  Route carried "on" structure: State highway 3,  Year Built: 2000,  Status: Open,  Structure Length: 10.64m (34.91ft),  Average Daily Traffic: 1,940 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,952 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SALMON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 56.524,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel continuous,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 45.1m (148.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 13.2m (43.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 68.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 41.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.63m (34.88ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: June 2020,  Underwater Inspection Date: June 2019,  Bridge Improvement Cost: $2,859,000,  Roadway Improvement Cost: $1,674,000,  Total Project Cost: $4,534,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100039,  Location: 1.9 MI NE JCT SH 3 & SH13 (Lat: 43.590286,  Lng: -76.171281),  Route carried "on" structure: State highway 3,  Year Built: 2002,  Status: Open,  Structure Length: 2.41m (7.91ft),  Average Daily Traffic: 1,940 (year 2018),  Truck Traffic: 14%,  Average Future Daily Traffic: 1,952 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: DEER CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 59.163,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.4m (34.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 23.6m (77.4ft),  Curb-To-Curb Width: 10.3m (33.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Deck: Satisfactory,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 84.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 64.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.40m (7.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $880,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $1,395,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 103186,  Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492489,  Lng: -76.119536),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 121 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 169 (year 2036),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: FRANK LACY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.981,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 24.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $880,000,  Roadway Improvement Cost: $515,000,  Total Project Cost: $1,395,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1031871,  Location: EXIT 35 OF I81 (Lat: 43.506839,  Lng: -76.121658),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 8,753 (year 2003),  Truck Traffic: 18%,  Design Load: HS 20,  Features Intersected: COUNTY ROAD 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.555,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Meets minimum limits,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $876,000,  Roadway Improvement Cost: $513,000,  Total Project Cost: $1,388,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1031872,  Location: EXIT 35 OF I81 (Lat: 43.506869,  Lng: -76.121019),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 6,547 (year 2020),  Truck Traffic: 25%,  Average Future Daily Traffic: 7,339 (year 2040),  Design Load: HS 20,  Features Intersected: COUNTY ROAD 28
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.555,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.7m (44.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Fair,  Substructure: Satisfactory,  Operating Rating: 64.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: High priority of replacement,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $876,000,  Roadway Improvement Cost: $513,000,  Total Project Cost: $1,388,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1031881,  Location: 1 MI S I81 SB & SH 13 (Lat: 43.538214,  Lng: -76.117089),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 8,174 (year 2008),  Truck Traffic: 24%,  Design Load: HS 20,  Features Intersected: HALSEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Operating Rating: 57.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,103,000,  Roadway Improvement Cost: $646,000,  Total Project Cost: $1,750,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1031882,  Location: 1 MI S I81 NB & SH 13 (Lat: 43.537917,  Lng: -76.115897),  Route carried "on" structure: Interstate 81,  Year Built: 1961,  Year Reconstructed: 1991,  Status: Open,  Structure Length: 3.90m (12.80ft),  Average Daily Traffic: 7,339 (year 2019),  Truck Traffic: 15%,  Average Future Daily Traffic: 8,226 (year 2040),  Design Load: HS 20,  Features Intersected: HALSEY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 34.063,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.0m (45.9ft),  Curb-To-Curb Width: 12.0m (39.4ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.90m (12.80ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $1,109,000,  Roadway Improvement Cost: $649,000,  Total Project Cost: $1,758,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 103192,  Location: 2 MI N JCT EXIT 36 OF I81 (Lat: 43.586225,  Lng: -76.107581),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 4.27m (14.01ft),  Average Daily Traffic: 423 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 592 (year 2037),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: CANNING FACTRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 28.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.7 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.26m (13.98ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $974,000,  Roadway Improvement Cost: $570,000,  Total Project Cost: $1,544,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 106477,  Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492939,  Lng: -76.121392),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 3.87m (12.70ft),  Average Daily Traffic: 121 (year 2016),  Truck Traffic: 8%,  Average Future Daily Traffic: 169 (year 2036),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: FRANK LACY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 13.4m (44.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 55.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.87m (12.70ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $875,000,  Roadway Improvement Cost: $512,000,  Total Project Cost: $1,387,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 106478,  Location: 2 MI N EXIT 36 OF I81 (Lat: 43.586144,  Lng: -76.109042),  Route carried "on" structure: Other road ,  Year Built: 1961,  Status: Open,  Structure Length: 4.21m (13.81ft),  Average Daily Traffic: 423 (year 2017),  Truck Traffic: 8%,  Average Future Daily Traffic: 592 (year 2037),  Design Load: HS 20,  Features Intersected: RTE I81,  Facility Carried by Structure: CANNING FACTRY RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.434,  Lanes on structure: 2,  Lanes under structure: 2,  Owner: State Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 14.3m (46.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.7m (35.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Operating Rating: 34.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 20.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 4.20m (13.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $948,000,  Roadway Improvement Cost: $555,000,  Total Project Cost: $1,503,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331375,  Location: 3.7 MI. SW. OF PULASKI (Lat: 43.526939,  Lng: -76.176581),  Route carried "on" structure: County highway ,  Year Built: 1985,  Year Reconstructed: 2012,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 389 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 545 (year 2038),  Features Intersected: GRINDSTONE CREEK,  Facility Carried by Structure: SALISBURY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.204,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.8m (38.7ft),  Curb-To-Curb Width: 8.8m (28.9ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 64.4 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: December 2021,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $623,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331376,  Location: 4.5 MI NW OF ALTMAR (Lat: 43.570833,  Lng: -76.034333),  Route carried "on" structure: County highway ,  Year Built: 1930,  Status: Open,  Structure Length: 1.13m (3.71ft),  Average Daily Traffic: 1,262 (year 2017),  Truck Traffic: 6%,  Average Future Daily Traffic: 1,767 (year 2037),  Features Intersected: TROUT BROOK,  Facility Carried by Structure: RICHLAND-ORWELL RO
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.611,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 6.7m (22.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.0m (36.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Poor,  Channel: Satisfactory,  Operating Rating: 94.3 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 66.2 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.12m (3.67ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $366,000,  Roadway Improvement Cost: $215,000,  Total Project Cost: $581,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331387,  Location: 4 MI SW OF PULASKI (Lat: 43.513183,  Lng: -76.162881),  Route carried "on" structure: County highway ,  Year Built: 2008,  Status: Open,  Structure Length: 1.16m (3.81ft),  Average Daily Traffic: 736 (year 2016),  Truck Traffic: 5%,  Average Future Daily Traffic: 1,030 (year 2036),  Features Intersected: GRINDSTONE CREEK,  Facility Carried by Structure: CR 41
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 9.107,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.3m (37.1ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 9.1m (29.9ft)

Condition: Deck: Good,  Superstructure: Satisfactory,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 98.9 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.15m (3.77ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $393,000,  Roadway Improvement Cost: $230,000,  Total Project Cost: $623,000 ( Estimate for 2021),  Deck Structure Type: Corrugated Steel,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 331388,  Location: 4.8 MI SW OF PULASKI (Lat: 43.495286,  Lng: -76.150628),  Route carried "on" structure: County highway ,  Year Built: 2017,  Status: Open,  Structure Length: 2.20m (7.22ft),  Average Daily Traffic: 308 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 431 (year 2040),  Design Load: HL 93,  Features Intersected: GRINDSTONE CREEK,  Facility Carried by Structure: COUNTY ROAD 41A
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 1.850,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 21.0m (68.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 66.2 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.20m (7.22ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $676,000,  Roadway Improvement Cost: $396,000,  Total Project Cost: $1,072,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 335823,  Location: 1.9 MI SE OF PULASKI (Lat: 43.550067,  Lng: -76.093867),  Route carried "on" structure: County highway ,  Year Built: 1966,  Year Reconstructed: 2014,  Status: Open,  Structure Length: 6.61m (21.69ft),  Average Daily Traffic: 2,982 (year 2020),  Truck Traffic: 13%,  Average Future Daily Traffic: 4,169 (year 2040),  Design Load: HL 93,  Features Intersected: SALMON RIVER,  Facility Carried by Structure: LEHIGH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.563,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 21.3m (69.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.2m (33.5ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 95.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 57.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 6.61m (21.69ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,784,000,  Roadway Improvement Cost: $1,045,000,  Total Project Cost: $2,829,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 336583,  Location: 2.2 MI NW OF PULASKI (Lat: 43.584753,  Lng: -76.158831),  Route carried "on" structure: Other road ,  Year Built: 1950,  Status: Open,  Structure Length: 0.79m (2.59ft),  Average Daily Traffic: 257 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 360 (year 2040),  Features Intersected: LITTLE DEER CREEK,  Facility Carried by Structure: CLARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.043,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 7.0m (23.0ft)

Condition: Channel: Good,  Culverts: Fair,  Operating Rating: 72.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 19.6 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.79m (2.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $101,000,  Roadway Improvement Cost: $59,000,  Total Project Cost: $160,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 103186,  Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492489,  Lng: -76.119536),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 19,426 (year 2000),  Features Intersected: RTE I81,  Facility Carried by Structure: FRANK LACY ROAD
Minimum Vertical Clearance: 5.25m (17.22ft),  Kilometerpoint: 29.139,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 1031871,  Location: EXIT 35 OF I81 (Lat: 43.506839,  Lng: -76.121658),  Route carried "under" structure: County highway ,  Year Built: 1961,  Structure Length: 0. m,  Features Intersected: COUNTY ROAD 28,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.62m (15.16ft),  Kilometerpoint: 7.820,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 1031872,  Location: EXIT 35 OF I81 (Lat: 43.506869,  Lng: -76.121019),  Route carried "under" structure: County highway ,  Year Built: 1961,  Structure Length: 0. m,  Features Intersected: COUNTY ROAD 28,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.55m (14.93ft),  Kilometerpoint: 7.884,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 1031881,  Location: 1 MI S I81 SB & SH 13 (Lat: 43.538214,  Lng: -76.117089),  Route carried "under" structure: Other road ,  Year Built: 1961,  Structure Length: 0. m,  Features Intersected: HALSEY ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.34m (14.24ft),  Kilometerpoint: 0.805,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 1031882,  Location: 1 MI S I81 NB & SH 13 (Lat: 43.537917,  Lng: -76.115897),  Route carried "under" structure: Other road ,  Year Built: 1961,  Structure Length: 0. m,  Features Intersected: HALSEY ROAD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.22m (13.85ft),  Kilometerpoint: 0.901,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.0m (45.9ft)

Find on map >>   Show street view

Structure Number: 103192,  Location: 2 MI N JCT EXIT 36 OF I81 (Lat: 43.586225,  Lng: -76.107581),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,164 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: CANNING FACTRY RD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 39.372,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Find on map >>   Show street view

Structure Number: 106477,  Location: 2.3 MI N EXIT 34 OF I81 (Lat: 43.492939,  Lng: -76.121392),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 19,426 (year 2000),  Features Intersected: RTE I81,  Facility Carried by Structure: FRANK LACY ROAD
Minimum Vertical Clearance: 5.10m (16.73ft),  Kilometerpoint: 29.139,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 13.4m (44.0ft)

Find on map >>   Show street view

Structure Number: 106478,  Location: 2 MI N EXIT 36 OF I81 (Lat: 43.586144,  Lng: -76.109042),  Route carried "under" structure: Interstate 81,  Year Built: 1961,  Structure Length: 0. m,  Average Daily Traffic: 15,164 (year 1999),  Features Intersected: RTE I81,  Facility Carried by Structure: CANNING FACTRY RD
Minimum Vertical Clearance: 5.05m (16.57ft),  Kilometerpoint: 39.662,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 14.3m (46.9ft)

Discuss Richland, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.