Bridge Statistics for Preble, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 16Number of bridges
  • 102ft / 31.1mTotal length
  • $13,607,000Total costs
  • 148,426Total average daily traffic
  • 19,678Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Preble
  • No street view available for this location

New bridges in Preble, NY - historical statistics
  • New bridges - historical statistics
  • 101960-1969
  • 11970-1979
  • 52010-2019
Average Bridge Daily Traffic in Preble, NY
Average Bridge Truck Traffic in Preble, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 20.0%Excellent
  • 20.0%Very good
  • 40.0%Good
  • 20.0%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 40.0%Excellent
  • 40.0%Good
  • 20.0%Satisfactory
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 40.0%Excellent
  • 40.0%Satisfactory
  • 20.0%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 25.0%Good
  • 37.5%Satisfactory
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 14.3%Very good
  • 14.3%Good
  • 57.1%Satisfactory
  • 14.3%Fair
Find on map >>   Show street view

Structure Number: 103143,  Location: 8 MILES N JCT I81 & SH 13 (Lat: 42.707031,  Lng: -76.149339),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 1.04m (3.41ft),  Average Daily Traffic: 22,437 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 25,151 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: W B TIOUGHNIOGA R
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 39.099,  Lanes on structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Skew: 24 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 75.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.03m (3.38ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $1,068,000,  Roadway Improvement Cost: $626,000,  Total Project Cost: $1,694,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031441,  Location: .5 MILE S EXIT 13 OF I81 (Lat: 42.734058,  Lng: -76.142258),  Route carried "on" structure: Interstate 81,  Year Built: 2014,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 13,527 (year 2008),  Truck Traffic: 22%,  Design Load: HL 93,  Features Intersected: PREBLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.140,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Very good,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 59.3 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 46.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,026,000,  Roadway Improvement Cost: $601,000,  Total Project Cost: $1,627,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 1031442,  Location: .5 MILE S EXIT 13 OF I81 (Lat: 42.733944,  Lng: -76.141739),  Route carried "on" structure: Interstate 81,  Year Built: 2014,  Status: Open,  Structure Length: 2.38m (7.81ft),  Average Daily Traffic: 11,219 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,576 (year 2040),  Design Load: HL 93,  Features Intersected: PREBLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 42.140,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.9m (75.1ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Operating Rating: 75.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 45.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.37m (7.78ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Bridge Improvement Cost: $1,026,000,  Roadway Improvement Cost: $601,000,  Total Project Cost: $1,627,000 ( Estimate for 2021),  Deck Structure Type: Other,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete
Find on map >>   Show street view

Structure Number: 103145,  Location: JCT RTS 281 + I-81 (Lat: 42.746267,  Lng: -76.137817),  Route carried "on" structure: State highway 281,  Year Built: 1966,  Status: Open,  Structure Length: 10.45m (34.28ft),  Average Daily Traffic: 1,712 (year 2020),  Truck Traffic: 16%,  Average Future Daily Traffic: 2,393 (year 2040),  Design Load: HS 20,  Features Intersected: 81I 81I32023096 NB, RTE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 20.306,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 23.7m (77.8ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 51.7 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 10.45m (34.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2021,  Bridge Improvement Cost: $2,179,000,  Roadway Improvement Cost: $1,276,000,  Total Project Cost: $3,456,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 1031461,  Location: 0.5 MI N JCT I81 + SH 281 (Lat: 42.751575,  Lng: -76.136383),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 14,138 (year 2011),  Truck Traffic: 24%,  Design Load: HS 20+Mod,  Features Intersected: W BR TIOUGHNIOGA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.135,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Good,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $196,000,  Roadway Improvement Cost: $115,000,  Total Project Cost: $311,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031462,  Location: 0.5 MI N JCT I81 & SH 281 (Lat: 42.751233,  Lng: -76.135919),  Route carried "on" structure: Interstate 81,  Year Built: 1966,  Status: Open,  Structure Length: 0.73m (2.40ft),  Average Daily Traffic: 11,294 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,660 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: W BR TIOUGHNIOGA
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 44.135,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Skew: 4 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.3m (10.8ft)

Condition: Channel: Good,  Culverts: Satisfactory,  Operating Rating: 74.9 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.73m (2.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2020,  Bridge Improvement Cost: $186,000,  Roadway Improvement Cost: $109,000,  Total Project Cost: $295,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 103147,  Location: 1.4 MI N JCT RTS I-81+281 (Lat: 42.764233,  Lng: -76.132022),  Route carried "on" structure: County highway ,  Year Built: 1966,  Status: Open,  Structure Length: 8.99m (29.49ft),  Average Daily Traffic: 249 (year 2019),  Truck Traffic: 8%,  Average Future Daily Traffic: 349 (year 2039),  Design Load: HS 20+Mod,  Features Intersected: 81I 81I32023109, RTE I81,  Facility Carried by Structure: SONG LAKE XING RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.239,  Lanes on structure: 2,  Lanes under structure: 4,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 5,  Length of Maximum Span: 20.7m (67.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Operating Rating: 42.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 25.4 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.99m (29.49ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,900,000,  Roadway Improvement Cost: $1,113,000,  Total Project Cost: $3,013,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1079461,  Location: 2.1 mi N Jct Rt 281 & I81 (Lat: 42.775867,  Lng: -76.127269),  Route carried "on" structure: Interstate 81,  Year Built: 1964,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 14,138 (year 2011),  Truck Traffic: 24%,  Features Intersected: Tully Lake Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $273,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1079462,  Location: 2.1 mi N Jct Rt 281 (Lat: 42.775967,  Lng: -76.126681),  Route carried "on" structure: Interstate 81,  Year Built: 1964,  Status: Open,  Structure Length: 0.61m (2.00ft),  Average Daily Traffic: 11,294 (year 2019),  Truck Traffic: 17%,  Average Future Daily Traffic: 12,660 (year 2040),  Features Intersected: Tully Lake Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 46.935,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Fair,  Culverts: Satisfactory,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.60m (1.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021,  Bridge Improvement Cost: $172,000,  Roadway Improvement Cost: $101,000,  Total Project Cost: $273,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 220746,  Location: 1.3 MI SE OF PREBLE (Lat: 42.718742,  Lng: -76.135444),  Route carried "on" structure: Other road ,  Year Built: 1964,  Year Reconstructed: 1997,  Status: Open,  Structure Length: 1.19m (3.90ft),  Average Daily Traffic: 67 (year 2019),  Truck Traffic: 7%,  Average Future Daily Traffic: 94 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: W B TIOUGHNIOGA R,  Facility Carried by Structure: EAST CLARK ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 1,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.2m (36.7ft),  Curb-To-Curb Width: 4.1m (13.5ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 88.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Length Of Structure Improvement: 1.18m (3.87ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $226,000,  Roadway Improvement Cost: $132,000,  Total Project Cost: $359,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 226317,  Location: 3.2 MILES NE OF PREBLE (Lat: 42.775728,  Lng: -76.127667),  Route carried "on" structure: Other road ,  Year Built: 1978,  Status: Open,  Structure Length: 0.70m (2.30ft),  Average Daily Traffic: 145 (year 2018),  Truck Traffic: 8%,  Average Future Daily Traffic: 203 (year 2038),  Features Intersected: TULLY LAKE CREEK,  Facility Carried by Structure: SAULSBURY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.545,  Lanes on structure: 2,  Owner: Town or Township Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.0m (9.8ft)

Condition: Channel: Satisfactory,  Culverts: Fair,  Operating Rating: 74.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 29.4 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present minimum criteria,  Length Of Structure Improvement: 0.70m (2.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Bridge Improvement Cost: $163,000,  Roadway Improvement Cost: $96,000,  Total Project Cost: $259,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 331195,  Location: 1 MILE SE OF PREBLE (Lat: 42.732139,  Lng: -76.130694),  Route carried "on" structure: County highway ,  Year Built: 2012,  Status: Open,  Structure Length: 1.25m (4.10ft),  Average Daily Traffic: 296 (year 2020),  Truck Traffic: 8%,  Average Future Daily Traffic: 414 (year 2040),  Features Intersected: WB TIOUGHNIOGA RV,  Facility Carried by Structure: CR108B PREBLE RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 1.480,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Steel,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 2.4m (7.9ft)

Condition: Channel: Poor,  Culverts: Very good,  Operating Rating: 74.3 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 1.24m (4.07ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $265,000,  Roadway Improvement Cost: $155,000,  Total Project Cost: $420,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 1031441,  Location: .5 MILE S EXIT 13 OF I81 (Lat: 42.734058,  Lng: -76.142258),  Route carried "under" structure: County highway ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 207 (year 2019),  Truck Traffic: 7%,  Features Intersected: PREBLE RD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 1031442,  Location: .5 MILE S EXIT 13 OF I81 (Lat: 42.733944,  Lng: -76.141739),  Route carried "under" structure: County highway ,  Year Built: 2014,  Structure Length: 0. m,  Average Daily Traffic: 207 (year 2019),  Truck Traffic: 7%,  Features Intersected: PREBLE RD,  Facility Carried by Structure: RTE I81
Minimum Vertical Clearance: 4.88m (16.01ft),  Kilometerpoint: 0.499,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 22.9m (75.1ft)

Find on map >>   Show street view

Structure Number: 103145,  Location: JCT RTS 281 + I-81 (Lat: 42.746267,  Lng: -76.137817),  Route carried "under" structure: Interstate 81,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 22,061 (year 1999),  Features Intersected: 81I 81I32023096 NB, RTE
Minimum Vertical Clearance: 4.93m (16.17ft),  Kilometerpoint: 15.446,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 23.7m (77.8ft)

Find on map >>   Show street view

Structure Number: 103147,  Location: 1.4 MI N JCT RTS I-81+281 (Lat: 42.764233,  Lng: -76.132022),  Route carried "under" structure: Interstate 81,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 25,435 (year 1999),  Features Intersected: 81I 81I32023109, RTE I81,  Facility Carried by Structure: SONG LAKE XING RD
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 17.538,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 20.7m (67.9ft)