Bridge Statistics for Pike, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 11Number of bridges
  • 66ft / 19.6mTotal length
  • $10,043,000Total costs
  • 6,277Total average daily traffic
  • 787Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Pike
  • No street view available for this location

New bridges in Pike, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 11930-1939
  • 11950-1959
  • 21960-1969
  • 21990-1999
  • 12000-2009
  • 22010-2019
  • 12020-2022
Reconstructed bridges in Pike, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11940-1949
  • 01950-1959
  • 01960-1969
  • 01970-1979
  • 01980-1989
  • 11990-1999
  • 02000-2009
  • 02010-2019
  • 12020-2022
Average Bridge Truck Traffic in Pike, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 12.5%Excellent
  • 37.5%Very good
  • 12.5%Good
  • 25.0%Fair
  • 12.5%Poor
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 22.2%Very good
  • 22.2%Good
  • 33.3%Fair
  • 11.1%Poor
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 22.2%Very good
  • 11.1%Good
  • 22.2%Satisfactory
  • 33.3%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 27.3%Very good
  • 9.1%Good
  • 36.4%Satisfactory
  • 18.2%Fair
  • 9.1%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 50.0%Excellent
  • 50.0%Very good
Find on map >>   Show street view

Structure Number: 101508,  Location: 1.6 MI SW JCT SH19 & SH39 (Lat: 42.555481,  Lng: -78.154242),  Route carried "on" structure: State highway 19,  Year Built: 1930,  Status: Posted for load-capacity,  Structure Length: 1.40m (4.59ft),  Average Daily Traffic: 1,192 (year 2020),  Truck Traffic: 12%,  Average Future Daily Traffic: 1,243 (year 2040),  Design Load: H 20,  Features Intersected: Wiscoy Creek
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 4.103,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Skew: 1 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 13.7m (44.9ft),  Curb-To-Curb Width: 10.7m (35.1ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Fair,  Superstructure: Poor,  Substructure: Fair,  Channel: Fair,  Operating Rating: 63.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 38.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Meets minimum limits,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.40m (4.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $715,000,  Roadway Improvement Cost: $419,000,  Total Project Cost: $1,134,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 10246,  Location: 1.9 MI E JCT RTS 39 & 362 (Lat: 42.571347,  Lng: -78.171678),  Route carried "on" structure: State highway 39,  Year Built: 1994,  Status: Open,  Structure Length: 2.35m (7.71ft),  Average Daily Traffic: 1,693 (year 2018),  Truck Traffic: 17%,  Average Future Daily Traffic: 1,703 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: TROUT BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.339,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.3m (37.1ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 22.5m (73.8ft),  Curb-To-Curb Width: 11.4m (37.4ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 75.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 54.8 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.34m (7.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $644,000,  Roadway Improvement Cost: $377,000,  Total Project Cost: $1,021,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 102461,  Location: 2.0MI NE JCT RTS 19 + 39 (Lat: 42.591564,  Lng: -78.105589),  Route carried "on" structure: State highway 39,  Year Built: 1928,  Year Reconstructed: 1952,  Status: Open,  Structure Length: 1.74m (5.71ft),  Average Daily Traffic: 1,551 (year 2018),  Truck Traffic: 13%,  Average Future Daily Traffic: 1,560 (year 2040),  Design Load: HS 15,  Features Intersected: EAST KOY CREEK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.210,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 7.3m (24.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.5m (50.9ft),  Curb-To-Curb Width: 7.9m (25.9ft),  Out-to-Out Width: 8.5m (27.9ft)

Condition: Deck: Poor,  Superstructure: Fair,  Substructure: Fair,  Channel: Fair,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.73m (5.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2021,  Bridge Improvement Cost: $506,000,  Roadway Improvement Cost: $297,000,  Total Project Cost: $803,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332009,  Location: 3.6 MI SW PORTAGEVILLE (Lat: 42.541044,  Lng: -78.097878),  Route carried "on" structure: County highway ,  Year Built: 2007,  Status: Open,  Structure Length: 2.62m (8.60ft),  Average Daily Traffic: 307 (year 2016),  Truck Traffic: 7%,  Average Future Daily Traffic: 430 (year 2036),  Design Load: HS 25 or greater,  Features Intersected: EAST KOY CREEK,  Facility Carried by Structure: EAST KOY ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.057,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.8m (28.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 9.0m (29.5ft),  Out-to-Out Width: 10.0m (32.8ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Very good,  Operating Rating: 92.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 55.3 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.62m (8.60ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $982,000,  Roadway Improvement Cost: $575,000,  Total Project Cost: $1,558,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Galvanized Reinforcing
Find on map >>   Show street view

Structure Number: 33201,  Location: 3.8 MI SW OF PORTAGEVILLE (Lat: 42.535703,  Lng: -78.096325),  Route carried "on" structure: Other road ,  Year Built: 1968,  Year Reconstructed: 1996,  Status: Open,  Structure Length: 1.68m (5.51ft),  Average Daily Traffic: 23 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 32 (year 2039),  Design Load: H 15,  Features Intersected: EAST KOY CREEK,  Facility Carried by Structure: OVERHOLT ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.177,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.0m (13.1ft),  Material/Design: Steel,  Design/Construction: Girder and Floorbeam System,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.2m (53.1ft),  Curb-To-Curb Width: 6.9m (22.6ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 40.8 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 27.2 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.67m (5.48ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Critical Feature Inspection Date: June 2020,  Bridge Improvement Cost: $406,000,  Roadway Improvement Cost: $238,000,  Total Project Cost: $644,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Preformed Fabric
Find on map >>   Show street view

Structure Number: 332012,  Location: 3.2 MI WEST OF PIKE (Lat: 42.564892,  Lng: -78.102461),  Route carried "on" structure: Other road ,  Year Built: 2012,  Status: Open,  Structure Length: 1.92m (6.30ft),  Average Daily Traffic: 757 (year 2018),  Truck Traffic: 11%,  Average Future Daily Traffic: 789 (year 2040),  Design Load: HL 93,  Features Intersected: EAST KOY CREEK,  Facility Carried by Structure: GRIFFITH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 3.186,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 18.3m (60.0ft),  Curb-To-Curb Width: 10.0m (32.8ft),  Out-to-Out Width: 11.3m (37.1ft)

Condition: Channel: Good,  Culverts: Very good,  Operating Rating: 85.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.92m (6.30ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $540,000,  Roadway Improvement Cost: $316,000,  Total Project Cost: $856,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332013,  Location: 1.2 MI NW PIKE (Lat: 42.568742,  Lng: -78.169683),  Route carried "on" structure: Other road ,  Year Built: 1962,  Year Reconstructed: 2020,  Status: Open,  Structure Length: 1.98m (6.50ft),  Average Daily Traffic: 58 (year 2019),  Truck Traffic: 5%,  Average Future Daily Traffic: 81 (year 2039),  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: ALBRO ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.687,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Prestressed concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 16.7m (54.8ft),  Curb-To-Curb Width: 6.8m (22.3ft),  Out-to-Out Width: 7.3m (24.0ft)

Condition: Deck: Very good,  Superstructure: Good,  Substructure: Fair,  Channel: Satisfactory,  Operating Rating: 84.6 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.98m (6.50ft),  Designated Inspection Frequency: Every 24 months,  Underwater Inspection Frequency: Every 60 months,  Inspection Date: August 2020,  Underwater Inspection Date: September 2021,  Bridge Improvement Cost: $413,000,  Roadway Improvement Cost: $242,000,  Total Project Cost: $654,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 332014,  Location: 2 MI NW OF PIKE (Lat: 42.578553,  Lng: -78.177703),  Route carried "on" structure: County highway ,  Year Built: 1997,  Status: Open,  Structure Length: 0.88m (2.89ft),  Average Daily Traffic: 685 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 959 (year 2040),  Features Intersected: TROUT BROOK,  Facility Carried by Structure: HARDYS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.193,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 2 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft),  Curb-To-Curb Width: 9.1m (29.9ft),  Out-to-Out Width: 16.7m (54.8ft)

Condition: Superstructure: Good,  Substructure: Good,  Channel: Satisfactory,  Inventory Rating: 67.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Better than present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $626,000,  Roadway Improvement Cost: $367,000,  Total Project Cost: $993,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 33706,  Location: in PIKE (Lat: 42.557986,  Lng: -78.156300),  Route carried "on" structure: County highway ,  Year Built: 1954,  Status: Closed,  Structure Length: 1.62m (5.31ft),  Truck Traffic: 5%,  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: COUNTY FAIR ACCESS
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.386,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 3.7m (12.1ft),  Material/Design: Aluminum, Iron,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.8m (51.8ft),  Curb-To-Curb Width: 4.2m (13.8ft),  Out-to-Out Width: 4.9m (16.1ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Satisfactory,  Channel: Poor,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Bridge Posting: Required (Relationship of Operating Rating to Maximum Legal Load: > 39.9% below),  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 12 months,  Inspection Date: December 2020,  Critical Feature Inspection Date: December 2020,  Bridge Improvement Cost: $648,000,  Roadway Improvement Cost: $379,000,  Total Project Cost: $1,027,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Wood or Timber
Find on map >>   Show street view

Structure Number: 337078,  Location: in PIKE (Lat: 42.559353,  Lng: -78.158164),  Route carried "on" structure: ServiceOther road ,  Year Built: 2011,  Status: Open,  Structure Length: 2.56m (8.40ft),  Average Daily Traffic: 11 (year 2019),  Truck Traffic: 25%,  Average Future Daily Traffic: 15 (year 2039),  Design Load: HS 25 or greater,  Features Intersected: WISCOY CREEK,  Facility Carried by Structure: COUNTY FAIR NORTH
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.129,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 4.3m (14.1ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 24.4m (80.1ft),  Curb-To-Curb Width: 3.7m (12.1ft),  Out-to-Out Width: 4.1m (13.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Very good,  Operating Rating: 90.0 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Equal to present desirable criteria,  Approach Roadway Alignment: High priority of corrective action,  Length Of Structure Improvement: 2.56m (8.40ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Critical Feature Inspection Date: August 2021,  Bridge Improvement Cost: $700,000,  Roadway Improvement Cost: $410,000,  Total Project Cost: $1,109,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 337161,  Location: 3 miles NE of Pike (Lat: 42.572503,  Lng: -78.103967),  Route carried "on" structure: County highway ,  Year Built: 2020,  Status: Open,  Structure Length: 0.88m (2.89ft),  Features Intersected: TRIBUTARY TO EAST KOY CR,  Facility Carried by Structure: LAMONT ROAD
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 7.047,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.2m (26.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Operating Rating: 78.4 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 0.88m (2.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2020,  Bridge Improvement Cost: $154,000,  Roadway Improvement Cost: $90,000,  Total Project Cost: $244,000 ( Estimate for 2021)