Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for Paramount, California (CA)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 28Number of bridges
  • 991ft / 302mTotal length
  • 2,510,973Total average daily traffic
  • 224,810Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for Paramount
  • No street view available for this location

New bridges in Paramount, CA - historical statistics
  • New bridges - historical statistics
  • 11950-1959
  • 11970-1979
  • 151980-1989
  • 111990-1999
Reconstructed bridges in Paramount, CA - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11960-1969
  • 01970-1979
  • 11980-1989
Average Bridge Daily Traffic in Paramount, CA
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 69.2%Good
  • 7.7%Satisfactory
  • 23.1%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 69.2%Good
  • 30.8%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 84.6%Good
  • 15.4%Fair
Find on map >>   Show street view

Structure Number: 53 0823,  Location: 07-LA-710-14.45-PRM (Lat: 33.896144,  Lng: -118.187969),  Route carried "on" structure: City street L087,  Year Built: 1986,  Status: Open,  Structure Length: 6.92m (22.70ft),  Average Daily Traffic: 18,534 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 26,533 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 710,  Facility Carried by Structure: COMPTON BLVD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Lanes under structure: 8,  Owner: State Highway Agency,  Approaching Roadway Width: 16.5m (54.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 34.4m (112.9ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 16.5m (54.1ft),  Out-to-Out Width: 20.1m (65.9ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 0824,  Location: 07-LA-710-14.98-PRM (Lat: 33.903481,  Lng: -118.186203),  Route carried "on" structure: County highway L079,  Year Built: 1990,  Status: Open,  Structure Length: 12.62m (41.40ft),  Average Daily Traffic: 32,824 (year 2011),  Truck Traffic: 10%,  Average Future Daily Traffic: 49,374 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 710,  Facility Carried by Structure: ROSECRANS AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 16,  Owner: State Highway Agency,  Approaching Roadway Width: 30.5m (100.1ft),  Skew: 33 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 41.1m (134.8ft),  Curb or Sidewalk Widths: Left: 0.2m (0.7ft),  Right: 0.2m (0.7ft),  Curb-To-Curb Width: 30.6m (100.4ft),  Out-to-Out Width: 37.9m (124.3ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2410L,  Location: 07-LA-105-R7.79-LA (Lat: 33.928244,  Lng: -118.274169),  Route carried "on" structure: Interstate 105,  Year Built: 1985,  Status: Open,  Structure Length: 4.88m (16.01ft),  Average Daily Traffic: 110,000 (year 2009),  Truck Traffic: 4%,  Average Future Daily Traffic: 124,999 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: MAIN STREET
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 7.790,  Lanes on structure: 6,  Lanes under structure: 4,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 35.4m (116.1ft),  Skew: 1 degrees,  Material/Design: Prestressed concrete,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 48.8m (160.1ft),  Curb-To-Curb Width: 35.4m (116.1ft),  Out-to-Out Width: 36.5m (119.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Superior to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2419,  Location: 07-LA-105-R13.47-PRM (Lat: 33.912808,  Lng: -118.180892),  Route carried "on" structure: Interstate 105,  Year Built: 1993,  Status: Open,  Structure Length: 37.73m (123.79ft),  Average Daily Traffic: 234,000 (year 2010),  Truck Traffic: 7%,  Average Future Daily Traffic: 224,460 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: W105-S710 CONN
Minimum Vertical Clearance: 5.18m (16.99ft),  Kilometerpoint: 13.470,  Lanes on structure: 10,  Lanes under structure: 11,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 50.5m (165.7ft),  Skew: 31 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 7,  Number Of Approach Spans: 4,  Length of Maximum Span: 48.1m (157.8ft),  Curb-To-Curb Width: 50.5m (165.7ft),  Out-to-Out Width: 66.4m (217.8ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present desirable criteria,  Underclear: Meets minimum limits,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2420F,  Location: 07-LA-710-R16.01-LYN (Lat: 33.910844,  Lng: -118.174603),  Route carried "on" structure: Ramp Interstate 710,  Year Built: 1990,  Year Reconstructed: 1992,  Status: Open,  Structure Length: 109.85m (360.40ft),  Average Daily Traffic: 16,300 (year 2009),  Truck Traffic: 2%,  Average Future Daily Traffic: 20,172 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: RTES 105 & 710, LTR&CONN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 16.010,  Lanes on structure: 2,  Lanes under structure: 29,  Base Highway Network: Yes (Inventory Route: 7,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.7m (35.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 19,  Length of Maximum Span: 66.8m (219.2ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Fair,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Somewhat better than minimum adequacy,  Designated Inspection Frequency: Every 24 months,  Inspection Date: May 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2421K,  Location: 07-LA-105-R13.83-PRM (Lat: 33.911564,  Lng: -118.174617),  Route carried "on" structure: Ramp State highway 105,  Year Built: 1993,  Status: Open,  Structure Length: 13.26m (43.50ft),  Average Daily Traffic: 3,560 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 4,183 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: W105-N&S 710 CONN
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.830,  Lanes on structure: 2,  Lanes under structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.0m (36.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 56.4m (185.0ft),  Curb-To-Curb Width: 11.0m (36.1ft),  Out-to-Out Width: 12.0m (39.4ft)

Condition: Deck: Fair,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Better than present minimum criteria,  Underclear: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2423,  Location: 07-LA-105-R14.13-PRM (Lat: 33.910694,  Lng: -118.168806),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 9.94m (32.61ft),  Average Daily Traffic: 21,992 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 29,433 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 105, LRT,  Facility Carried by Structure: GARFIELD AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 6,  Lanes under structure: 12,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 23.2m (76.1ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 49.7m (163.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 23.2m (76.1ft),  Out-to-Out Width: 26.8m (87.9ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Fair,  Operating Rating: 27.2 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 21.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Better than present minimum criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2424,  Location: 07-LA-105-R14.34-PRM (Lat: 33.910842,  Lng: -118.165233),  Route carried "on" structure: City street ,  Year Built: 1988,  Status: Open,  Structure Length: 13.14m (43.11ft),  Average Daily Traffic: 1,060 (year 2010),  Truck Traffic: 1%,  Average Future Daily Traffic: 1,184 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 105, LRT, SOMERSET,  Facility Carried by Structure: FACADE AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 14.430,  Lanes on structure: 2,  Lanes under structure: 16,  Owner: State Highway Agency,  Approaching Roadway Width: 9.8m (32.2ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 4,  Length of Maximum Span: 36.7m (120.4ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 9.8m (32.2ft),  Out-to-Out Width: 13.4m (44.0ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Somewhat better than minimum adequacy,  Underclear: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2428,  Location: 07-LA-105-R14.95-PRM (Lat: 33.911903,  Lng: -118.155072),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 12.01m (39.40ft),  Average Daily Traffic: 1,400 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 2,137 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 105, LRT, RAMPS,  Facility Carried by Structure: MERKEL AVENUE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 2,  Lanes under structure: 10,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 61.6m (202.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 12.2m (40.0ft),  Out-to-Out Width: 15.8m (51.8ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Better than present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2429,  Location: 07-LA-105-R15.09-PRM (Lat: 33.912272,  Lng: -118.152225),  Route carried "on" structure: City street ,  Year Built: 1989,  Status: Open,  Structure Length: 7.53m (24.70ft),  Average Daily Traffic: 16,500 (year 2006),  Truck Traffic: 1%,  Average Future Daily Traffic: 20,308 (year 2042),  Design Load: HS 20+Mod,  Features Intersected: ROUTE 105, LRT,  Facility Carried by Structure: DOWNEY AVE
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.000,  Lanes on structure: 5,  Lanes under structure: 6,  Owner: State Highway Agency,  Approaching Roadway Width: 19.2m (63.0ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 38.4m (126.0ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 19.2m (63.0ft),  Out-to-Out Width: 22.9m (75.1ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 2456F,  Location: 07-LA-105-R13.65-PRM (Lat: 33.915628,  Lng: -118.178639),  Route carried "on" structure: Ramp State highway 105,  Year Built: 1992,  Status: Open,  Structure Length: 42.34m (138.91ft),  Average Daily Traffic: 15,091 (year 2010),  Truck Traffic: 2%,  Average Future Daily Traffic: 15,864 (year 2037),  Design Load: HS 20+Mod,  Features Intersected: LOS ANGELES RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 13.650,  Lanes on structure: 1,  Base Highway Network: Yes (Inventory Route: 1,  Subroute: 1),  Owner: State Highway Agency,  Approaching Roadway Width: 10.5m (34.4ft),  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Number Of Spans In Main Unit: 9,  Length of Maximum Span: 49.5m (162.4ft),  Curb-To-Curb Width: 10.5m (34.4ft),  Out-to-Out Width: 11.6m (38.1ft)

Condition: Deck: Good,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 54.1 metric tons,  Method Used To Determine Operating Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Inventory Rating: 32.4 metric tons,  Method Used To Determine Inventory Rating: Assigned rating based on Load Factor Design (LFD) reported in metric tons,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Superior to present desirable criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53C0190R,  Location: 0.1MI E/O I-710 FWY (Lat: 33.903517,  Lng: -118.183453),  Route carried "on" structure: City street L079,  Year Built: 1951,  Year Reconstructed: 1972,  Status: Open,  Structure Length: 18.51m (60.73ft),  Average Daily Traffic: 13,248 (year 2012),  Truck Traffic: 5%,  Average Future Daily Traffic: 15,235 (year 2040),  Design Load: HS 20,  Features Intersected: LOS ANGELES RIV,  Facility Carried by Structure: ROSECRANS AVE E
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 3,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 11.4m (37.4ft),  Skew: 4 degrees,  Material/Design: Concrete,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 8,  Length of Maximum Span: 25.0m (82.0ft),  Curb-To-Curb Width: 11.3m (37.1ft),  Out-to-Out Width: 11.7m (38.4ft)

Condition: Deck: Fair,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 45.0 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 26.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53C0646,  Location: 0.1MI E/O I-710 FWY (Lat: 33.896153,  Lng: -118.187083),  Route carried "on" structure: City street L087,  Year Built: 1976,  Status: Open,  Structure Length: 13.38m (43.90ft),  Average Daily Traffic: 21,024 (year 2012),  Truck Traffic: 2%,  Average Future Daily Traffic: 25,229 (year 2040),  Design Load: HS 20,  Features Intersected: LOS ANGELES RIV,  Facility Carried by Structure: SOMERSET BLVD
Minimum Vertical Clearance: 30.47m (99.97ft),  Kilometerpoint: 0.000,  Lanes on structure: 4,  Owner: City or Municipal Highway Agency,  Approaching Roadway Width: 14.6m (47.9ft),  Material/Design: Concrete continuous,  Design/Construction: Tee Beam,  Number Of Spans In Main Unit: 6,  Length of Maximum Span: 23.8m (78.1ft),  Curb or Sidewalk Widths: Left: 1.5m (4.9ft),  Right: 1.5m (4.9ft),  Curb-To-Curb Width: 14.6m (47.9ft),  Out-to-Out Width: 18.2m (59.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Excellent,  Operating Rating: 51.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 30.1 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Deck Structure Type: Concrete Cast-file-Place
Find on map >>   Show street view

Structure Number: 53 0823,  Location: 07-LA-710-14.45-PRM (Lat: 33.896144,  Lng: -118.187969),  Route carried "under" structure: Interstate 710,  Year Built: 1986,  Structure Length: 0. m,  Average Daily Traffic: 234,000 (year 2017),  Truck Traffic: 14%,  Features Intersected: ROUTE 710,  Facility Carried by Structure: COMPTON BLVD
Minimum Vertical Clearance: 5.13m (16.83ft),  Kilometerpoint: 14.450,  Lanes on structure: 4,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 34.4m (112.9ft)

Find on map >>   Show street view

Structure Number: 53 0824,  Location: 07-LA-710-14.98-PRM (Lat: 33.903481,  Lng: -118.186203),  Route carried "under" structure: Interstate 710,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 240,000 (year 2017),  Truck Traffic: 13%,  Features Intersected: ROUTE 710,  Facility Carried by Structure: ROSECRANS AVE
Minimum Vertical Clearance: 5.51m (18.08ft),  Kilometerpoint: 14.980,  Lanes on structure: 6,  Lanes under structure: 13,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 53 0824,  Location: 07-LA-710-14.98-PRM (Lat: 33.903481,  Lng: -118.186203),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1990,  Structure Length: 0. m,  Average Daily Traffic: 6,700 (year 2015),  Truck Traffic: 2%,  Features Intersected: ROUTE 710,  Facility Carried by Structure: ROSECRANS AVE
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 14.980,  Lanes on structure: 6,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 41.1m (134.8ft)

Find on map >>   Show street view

Structure Number: 53 2419,  Location: 07-LA-105-R13.47-PRM (Lat: 33.912808,  Lng: -118.180892),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 22,700 (year 2010),  Truck Traffic: 13%,  Features Intersected: W105-S710 CONN,  Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 4.95m (16.24ft),  Kilometerpoint: 15.690,  Lanes on structure: 10,  Lanes under structure: 2,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.1m (157.8ft)

Find on map >>   Show street view

Structure Number: 53 2419,  Location: 07-LA-105-R13.47-PRM (Lat: 33.912808,  Lng: -118.180892),  Route carried "under" structure: Interstate 710,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 221,500 (year 2010),  Truck Traffic: 13%,  Features Intersected: W105-S710 CONN,  Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 5.77m (18.93ft),  Kilometerpoint: 15.690,  Lanes on structure: 10,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.1m (157.8ft)

Find on map >>   Show street view

Structure Number: 53 2419,  Location: 07-LA-105-R13.47-PRM (Lat: 33.912808,  Lng: -118.180892),  Route carried "under" structure: Ramp Interstate 710,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 22,700 (year 2010),  Truck Traffic: 13%,  Features Intersected: W105-S710 CONN,  Facility Carried by Structure: ROUTE 105 & LRT
Minimum Vertical Clearance: 5.28m (17.32ft),  Kilometerpoint: 15.690,  Lanes on structure: 10,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 48.1m (157.8ft)

Find on map >>   Show street view

Structure Number: 53 2421K,  Location: 07-LA-105-R13.83-PRM (Lat: 33.911564,  Lng: -118.174617),  Route carried "under" structure: Ramp State highway 710,  Year Built: 1993,  Structure Length: 0. m,  Average Daily Traffic: 31,200 (year 2010),  Truck Traffic: 2%,  Features Intersected: W105-N&S 710 CONN,  Facility Carried by Structure: GARFIELD-W105 ONRA
Minimum Vertical Clearance: 5.26m (17.26ft),  Kilometerpoint: 13.830,  Lanes on structure: 2,  Lanes under structure: 3,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 56.4m (185.0ft)

Find on map >>   Show street view

Structure Number: 53 2423,  Location: 07-LA-105-R14.13-PRM (Lat: 33.910694,  Lng: -118.168806),  Route carried "under" structure: Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 201,050 (year 2010),  Truck Traffic: 9%,  Features Intersected: ROUTE 105, LRT,  Facility Carried by Structure: GARFIELD AVE
Minimum Vertical Clearance: 6.22m (20.41ft),  Kilometerpoint: 14.130,  Lanes on structure: 6,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 49.7m (163.1ft)

Find on map >>   Show street view

Structure Number: 53 2424,  Location: 07-LA-105-R14.34-PRM (Lat: 33.910842,  Lng: -118.165233),  Route carried "under" structure: Interstate 105,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 201,040 (year 2010),  Truck Traffic: 9%,  Features Intersected: ROUTE 105, LRT, SOMERSET,  Facility Carried by Structure: FACADE AVE
Minimum Vertical Clearance: 7.52m (24.67ft),  Kilometerpoint: 14.340,  Lanes on structure: 2,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.7m (120.4ft)

Find on map >>   Show street view

Structure Number: 53 2426,  Location: 07-LA-105-R14.43-PRM (Lat: 33.911014,  Lng: -118.163789),  Route carried "under" structure: Interstate 105,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 201,000 (year 2009),  Truck Traffic: 9%,  Features Intersected: ROUTE 105, LRT, SOMERSET,  Facility Carried by Structure: PEDESTRIAN WALKWAY
Minimum Vertical Clearance: 5.79m (19.00ft),  Kilometerpoint: 14.430,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Single/Spread,  Length of Maximum Span: 35.8m (117.5ft)

Find on map >>   Show street view

Structure Number: 53 2427,  Location: 07-LA-105-R14.38-PRM (Lat: 33.912150,  Lng: -118.164606),  Route carried "under" structure: State highway 105,  Year Built: 1988,  Structure Length: 0. m,  Average Daily Traffic: 220,000 (year 2006),  Truck Traffic: 3%,  Features Intersected: ROUTE 105, LRT, SOMERSET,  Facility Carried by Structure: UP RR
Minimum Vertical Clearance: 6.99m (22.93ft),  Kilometerpoint: 14.380,  Lanes under structure: 12,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 36.6m (120.1ft)

Find on map >>   Show street view

Structure Number: 53 2428,  Location: 07-LA-105-R14.95-PRM (Lat: 33.911903,  Lng: -118.155072),  Route carried "under" structure: Ramp Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 800 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, LRT, RAMPS,  Facility Carried by Structure: MERKEL AVENUE
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 14.950,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 53 2428,  Location: 07-LA-105-R14.95-PRM (Lat: 33.911903,  Lng: -118.155072),  Route carried "under" structure: Ramp Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 750 (year 2006),  Truck Traffic: 1%,  Features Intersected: ROUTE 105, LRT, RAMPS,  Facility Carried by Structure: MERKEL AVENUE
Minimum Vertical Clearance: 5.72m (18.77ft),  Kilometerpoint: 14.950,  Lanes on structure: 2,  Lanes under structure: 1,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 53 2428,  Location: 07-LA-105-R14.95-PRM (Lat: 33.911903,  Lng: -118.155072),  Route carried "under" structure: Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 201,000 (year 2009),  Truck Traffic: 9%,  Features Intersected: ROUTE 105, LRT, RAMPS,  Facility Carried by Structure: MERKEL AVENUE
Minimum Vertical Clearance: 5.64m (18.50ft),  Kilometerpoint: 14.950,  Lanes on structure: 2,  Lanes under structure: 8,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 61.6m (202.1ft)

Find on map >>   Show street view

Structure Number: 53 2429,  Location: 07-LA-105-R15.09-PRM (Lat: 33.912272,  Lng: -118.152225),  Route carried "under" structure: Interstate 105,  Year Built: 1989,  Structure Length: 0. m,  Average Daily Traffic: 201,000 (year 2009),  Truck Traffic: 9%,  Features Intersected: ROUTE 105, LRT,  Facility Carried by Structure: DOWNEY AVE
Minimum Vertical Clearance: 5.33m (17.49ft),  Kilometerpoint: 15.090,  Lanes on structure: 5,  Lanes under structure: 6,  Material/Design: Prestressed concrete continuous,  Design/Construction: Box Beam or Girders - Multiple,  Length of Maximum Span: 38.4m (126.0ft)

Discuss Paramount, California (CA) on our hugely popular California forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.