Jump to a detailed profile or search site with Google Custom Search

Bridge Statistics for North Hudson, New York (NY)
Condition, Traffic, Stress, Structural Evaluation, Project Costs


  • National Bridge Inventory (NBI) Statistics
  • 25Number of bridges
  • 213ft / 64.8mTotal length
  • $31,528,000Total costs
  • 45,505Total average daily traffic
  • 10,666Total average daily truck traffic
  • National Bridge Inventory (NBI) Registered Bridges for North Hudson
  • No street view available for this location

New bridges in North Hudson, NY - historical statistics
  • New bridges - historical statistics
  • 11920-1929
  • 21930-1939
  • 11950-1959
  • 141960-1969
  • 31990-1999
  • 12000-2009
  • 12010-2019
  • 22020-2022
Reconstructed bridges in North Hudson, NY - Historical Statistics
  • Reconstructed bridges - Historical Statistics
  • 11980-1989
  • 21990-1999
  • 02000-2009
  • 22010-2019
Average Bridge Daily Traffic in North Hudson, NY
Average Bridge Truck Traffic in North Hudson, NY
Bridge Condition - Deck
  • Bridge Condition - Deck
  • 5.9%Excellent
  • 17.6%Very good
  • 23.5%Good
  • 41.2%Satisfactory
  • 11.8%Fair
Bridge Condition - Superstructure
  • Bridge Condition - Superstructure
  • 11.1%Excellent
  • 33.3%Very good
  • 22.2%Good
  • 27.8%Satisfactory
  • 5.6%Fair
Bridge Condition - Substructure
  • Bridge Condition - Substructure
  • 11.1%Excellent
  • 16.7%Very good
  • 22.2%Good
  • 33.3%Satisfactory
  • 16.7%Fair
Bridge Condition - Channel
  • Bridge Condition - Channel
  • 5.9%Excellent
  • 17.6%Very good
  • 41.2%Good
  • 29.4%Satisfactory
  • 5.9%Poor
Bridge Condition - Culverts
  • Bridge Condition - Culverts
  • 33.3%Excellent
  • 33.3%Good
  • 33.3%Satisfactory
Find on map >>   Show street view

Structure Number: 100581,  Location: RT 9 3 MI N N HUDSON (Lat: 43.986628,  Lng: -73.716253),  Route carried "on" structure: US 9,  Year Built: 1957,  Status: Open,  Structure Length: 1.07m (3.51ft),  Average Daily Traffic: 205 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 213 (year 2040),  Features Intersected: BLACK BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 26.178,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 4.5m (14.8ft)

Condition: Channel: Poor,  Culverts: Good,  Operating Rating: 75.8 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 32.7 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.06m (3.48ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: September 2020,  Bridge Improvement Cost: $252,000,  Roadway Improvement Cost: $148,000,  Total Project Cost: $400,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 100582,  Location: RT 9 5.3 MI S EXIT 30 (Lat: 44.009217,  Lng: -73.697822),  Route carried "on" structure: US 9,  Year Built: 2014,  Status: Open,  Structure Length: 4.79m (15.72ft),  Average Daily Traffic: 205 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 213 (year 2040),  Design Load: HL 93,  Features Intersected: SCHROON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 29.075,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 47.2m (154.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.6m (31.5ft)

Condition: Deck: Excellent,  Superstructure: Excellent,  Substructure: Excellent,  Channel: Good,  Inventory Rating: 70.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 4.78m (15.68ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $1,008,000,  Roadway Improvement Cost: $590,000,  Total Project Cost: $1,598,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100583,  Location: RT 9 2.7 MI S EXIT 30 (Lat: 44.043594,  Lng: -73.678231),  Route carried "on" structure: US 9,  Year Built: 1928,  Year Reconstructed: 1990,  Status: Open,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 205 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 213 (year 2040),  Design Load: HS 20,  Features Intersected: SCHROON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 33.387,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.1m (39.7ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.2m (30.2ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Satisfactory,  Channel: Good,  Inventory Rating: 92.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $512,000,  Roadway Improvement Cost: $300,000,  Total Project Cost: $812,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 100584,  Location: RT 9 1.5 MILES S EXIT 30 (Lat: 44.055303,  Lng: -73.663558),  Route carried "on" structure: US 9,  Year Built: 1998,  Status: Open,  Structure Length: 2.83m (9.28ft),  Average Daily Traffic: 205 (year 2018),  Truck Traffic: 5%,  Average Future Daily Traffic: 213 (year 2040),  Design Load: HS 25 or greater,  Features Intersected: SCHROON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 35.173,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 10.1m (33.1ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 27.1m (88.9ft),  Curb-To-Curb Width: 10.1m (33.1ft),  Out-to-Out Width: 10.8m (35.4ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 87.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 52.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Better than present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.83m (9.28ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $903,000,  Roadway Improvement Cost: $529,000,  Total Project Cost: $1,431,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 1005851,  Location: I87 EXIT 30 (Lat: 44.076569,  Lng: -73.663239),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 5,870 (year 2014),  Truck Traffic: 31%,  Features Intersected: RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.361,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,164,000,  Roadway Improvement Cost: $682,000,  Total Project Cost: $1,845,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1005852,  Location: I87 EXIT 30 (Lat: 44.076272,  Lng: -73.662983),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 4,009 (year 2014),  Truck Traffic: 31%,  Average Future Daily Traffic: 4,774 (year 2040),  Features Intersected: RTE 9
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 37.361,  Lanes on structure: 2,  Lanes under structure: 4,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 37.7m (123.7ft),  Curb-To-Curb Width: 11.8m (38.7ft),  Out-to-Out Width: 12.7m (41.7ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Good,  Operating Rating: 67.1 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Underclear: High priority of corrective action,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,134,000,  Roadway Improvement Cost: $664,000,  Total Project Cost: $1,798,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Epoxy Overlay
Find on map >>   Show street view

Structure Number: 1033701,  Location: JCT I87 & BRANCH R (Lat: 43.949006,  Lng: -73.740169),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 8.29m (27.20ft),  Average Daily Traffic: 4,498 (year 2015),  Truck Traffic: 24%,  Design Load: HS 20+Mod,  Features Intersected: BRANCH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.094,  Lanes on structure: 3,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 13.4m (44.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 26.8m (87.9ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 11.6m (38.1ft),  Out-to-Out Width: 13.1m (43.0ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 82.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of replacement,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 8.29m (27.20ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $2,446,000,  Roadway Improvement Cost: $1,432,000,  Total Project Cost: $3,879,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1033702,  Location: JCT I87 & BRANCH R (Lat: 43.948967,  Lng: -73.739631),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Year Reconstructed: 2017,  Status: Open,  Structure Length: 7.65m (25.10ft),  Average Daily Traffic: 3,104 (year 2015),  Truck Traffic: 31%,  Average Future Daily Traffic: 3,697 (year 2040),  Design Load: HS 20+Mod,  Features Intersected: BRANCH RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.078,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.6m (38.1ft),  Skew: 4 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 25.0m (82.0ft),  Curb or Sidewalk Widths: Left: 0.5m (1.6ft),  Right: 0.5m (1.6ft),  Curb-To-Curb Width: 8.6m (28.2ft),  Out-to-Out Width: 10.1m (33.1ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Satisfactory,  Operating Rating: 81.6 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.0 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 7.65m (25.10ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $1,764,000,  Roadway Improvement Cost: $1,033,000,  Total Project Cost: $2,797,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 1033711,  Location: I87 EXIT 29 (Lat: 43.951686,  Lng: -73.735867),  Route carried "on" structure: Interstate 87,  Year Built: 1966,  Status: Open,  Structure Length: 5.03m (16.50ft),  Average Daily Traffic: 5,870 (year 2015),  Truck Traffic: 26%,  Features Intersected: RTE 910K
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.545,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.2m (59.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Satisfactory,  Substructure: Fair,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 49.9 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 5.02m (16.47ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,511,000,  Roadway Improvement Cost: $885,000,  Total Project Cost: $2,396,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1033712,  Location: I87 EXIT 29 (Lat: 43.951664,  Lng: -73.735539),  Route carried "on" structure: Interstate 87,  Year Built: 1966,  Status: Open,  Structure Length: 4.91m (16.11ft),  Average Daily Traffic: 4,009 (year 2015),  Truck Traffic: 31%,  Average Future Daily Traffic: 4,774 (year 2040),  Features Intersected: RTE 910K
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.545,  Lanes on structure: 2,  Lanes under structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Skew: 3 degrees,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 3,  Length of Maximum Span: 18.5m (60.7ft),  Curb-To-Curb Width: 12.1m (39.7ft),  Out-to-Out Width: 13.0m (42.7ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Operating Rating: 85.3 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 50.8 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Underclear: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 4.90m (16.08ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,444,000,  Roadway Improvement Cost: $845,000,  Total Project Cost: $2,289,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous,  Membrane: Other
Find on map >>   Show street view

Structure Number: 1033721,  Location: I87 4.3 MI S EXIT 30 (Lat: 44.024442,  Lng: -73.700711),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 5,870 (year 2014),  Truck Traffic: 26%,  Features Intersected: WEST MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.362,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 12.2m (40.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 31.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 24.3 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,199,000,  Roadway Improvement Cost: $702,000,  Total Project Cost: $1,901,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 1033722,  Location: I87 4.3 MI S EXIT 30 (Lat: 44.024292,  Lng: -73.699925),  Route carried "on" structure: Interstate 87,  Year Built: 1965,  Status: Open,  Structure Length: 3.93m (12.89ft),  Average Daily Traffic: 4,009 (year 2014),  Truck Traffic: 26%,  Average Future Daily Traffic: 4,774 (year 2040),  Features Intersected: WEST MILL BROOK
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 30.378,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 11.9m (39.0ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 38.1m (125.0ft),  Curb-To-Curb Width: 11.9m (39.0ft),  Out-to-Out Width: 12.8m (42.0ft)

Condition: Deck: Fair,  Superstructure: Satisfactory,  Substructure: Satisfactory,  Channel: Good,  Operating Rating: 29.8 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 23.0 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.93m (12.89ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: April 2021,  Bridge Improvement Cost: $1,199,000,  Roadway Improvement Cost: $702,000,  Total Project Cost: $1,901,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Monolithic Concrete
Find on map >>   Show street view

Structure Number: 105364,  Location: JCT 2B & SCROON RIVER (Lat: 43.951525,  Lng: -73.734633),  Route carried "on" structure: County highway 910K,  Year Built: 1939,  Year Reconstructed: 1994,  Status: Open,  Structure Length: 3.23m (10.60ft),  Average Daily Traffic: 449 (year 2016),  Truck Traffic: 9%,  Average Future Daily Traffic: 468 (year 2040),  Features Intersected: SCHROON RIVER
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.418,  Lanes on structure: 2,  Base Highway Network: Yes,  Owner: State Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 31.0m (101.7ft),  Curb or Sidewalk Widths: Left: 1.7m (5.6ft),  Right: 1.7m (5.6ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 7.8m (25.6ft)

Condition: Deck: Good,  Superstructure: Fair,  Substructure: Good,  Channel: Satisfactory,  Operating Rating: 69.9 metric tons,  Method Used To Determine Operating Rating: Load Factor (LF),  Inventory Rating: 43.5 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 3.23m (10.60ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Critical Feature Inspection Date: July 2020,  Bridge Improvement Cost: $2,553,000,  Roadway Improvement Cost: $1,495,000,  Total Project Cost: $4,048,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Integral Concrete,  Deck Protection: Epoxy Coated Reinforcing
Find on map >>   Show street view

Structure Number: 330193,  Location: 5 MILES N OF NORTH HUDSON (Lat: 44.017317,  Lng: -73.687875),  Route carried "on" structure: Other road ,  Year Built: 2007,  Status: Open,  Structure Length: 1.62m (5.31ft),  Average Daily Traffic: 50 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 70 (year 2036),  Features Intersected: SCHROON RIVER,  Facility Carried by Structure: GREENOUGH ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.257,  Lanes on structure: 1,  Owner: County Highway Agency,  Approaching Roadway Width: 6.1m (20.0ft),  Material/Design: Steel,  Design/Construction: Truss - Thru,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 15.2m (49.9ft),  Curb-To-Curb Width: 4.3m (14.1ft),  Out-to-Out Width: 4.8m (15.7ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Very good,  Channel: Satisfactory,  Operating Rating: 83.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 40.8 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.61m (5.28ft),  Designated Inspection Frequency: Every 24 months,  Critical Feature Inspection Frequency: Every 24 months,  Inspection Date: June 2021,  Critical Feature Inspection Date: June 2021,  Bridge Improvement Cost: $491,000,  Roadway Improvement Cost: $288,000,  Total Project Cost: $779,000 ( Estimate for 2021),  Deck Structure Type: Steel plate,  Wearing Surface/Protective System: Wearing Surface: Other
Find on map >>   Show street view

Structure Number: 330194,  Location: 3 MI NE NORTH HUDSON (Lat: 43.991103,  Lng: -73.687997),  Route carried "on" structure: County highway ,  Year Built: 1932,  Year Reconstructed: 1997,  Status: Posted for load-capacity,  Structure Length: 1.34m (4.40ft),  Average Daily Traffic: 201 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 209 (year 2040),  Features Intersected: BLACK BROOK,  Facility Carried by Structure: N HUDSN MORIAH RD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 2.590,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 5.5m (18.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 12.4m (40.7ft),  Curb-To-Curb Width: 6.2m (20.3ft),  Out-to-Out Width: 7.1m (23.3ft)

Condition: Deck: Very good,  Superstructure: Very good,  Substructure: Satisfactory,  Channel: Very good,  Operating Rating: 59.5 metric tons,  Method Used To Determine Operating Rating: Field evaluation and documented engineering judgment,  Inventory Rating: 24.9 metric tons,  Method Used To Determine Inventory Rating: Field evaluation and documented engineering judgment,  Structural Evaluation: Equal to present minimum criteria,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 1.34m (4.40ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: June 2020,  Bridge Improvement Cost: $273,000,  Roadway Improvement Cost: $160,000,  Total Project Cost: $433,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330195,  Location: 5 MI NE I87 EXIT 29 (Lat: 43.993583,  Lng: -73.659628),  Route carried "on" structure: County highway ,  Year Built: 1995,  Status: Posted for load-capacity,  Structure Length: 0.91m (2.99ft),  Average Daily Traffic: 201 (year 2015),  Truck Traffic: 10%,  Average Future Daily Traffic: 209 (year 2040),  Design Load: HS 20,  Features Intersected: BLACK BROOK,  Facility Carried by Structure: COUNTY ROAD 4
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 5.181,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.0m (23.0ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 8.5m (27.9ft),  Curb-To-Curb Width: 7.0m (23.0ft),  Out-to-Out Width: 7.4m (24.3ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Fair,  Channel: Good,  Operating Rating: 45.4 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 29.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Somewhat better than minimum adequacy,  Deck Geometry: Meets minimum limits,  Waterway Adequacy: Somewhat better than minimum adequacy,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2021,  Bridge Improvement Cost: $384,000,  Roadway Improvement Cost: $225,000,  Total Project Cost: $609,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330196,  Location: 4.5 MI NE OF NORTH HUDSON (Lat: 44.013283,  Lng: -73.701581),  Route carried "on" structure: Other road ,  Year Built: 1996,  Status: Open,  Structure Length: 1.22m (4.00ft),  Average Daily Traffic: 91 (year 2016),  Truck Traffic: 6%,  Average Future Daily Traffic: 127 (year 2036),  Design Load: HS 20,  Features Intersected: WEST MILL BROOK,  Facility Carried by Structure: PEPPER HOLLOW ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.611,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 4.9m (16.1ft),  Material/Design: Wood or Timber,  Design/Construction: Slab,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 11.5m (37.7ft),  Curb-To-Curb Width: 4.9m (16.1ft),  Out-to-Out Width: 5.3m (17.4ft)

Condition: Deck: Good,  Superstructure: Very good,  Substructure: Very good,  Channel: Good,  Operating Rating: 53.5 metric tons,  Method Used To Determine Operating Rating: Allowable Stress (AS),  Inventory Rating: 39.9 metric tons,  Method Used To Determine Inventory Rating: Allowable Stress (AS),  Structural Evaluation: Equal to present desirable criteria,  Deck Geometry: High priority of corrective action,  Waterway Adequacy: Superior to present desirable criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 1.21m (3.97ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2021,  Bridge Improvement Cost: $205,000,  Roadway Improvement Cost: $120,000,  Total Project Cost: $325,000 ( Estimate for 2021),  Deck Structure Type: Wood or Timber,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330264,  Location: .5 MI E OF EXIT 30 - I87 (Lat: 44.076017,  Lng: -73.659442),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 1.01m (3.31ft),  Average Daily Traffic: 211 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 295 (year 2040),  Features Intersected: NEW POND BROOK,  Facility Carried by Structure: CR 6
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 0.821,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.5m (27.9ft),  Skew: 3 degrees,  Material/Design: Concrete,  Design/Construction: Frame,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft),  Curb-To-Curb Width: 8.5m (27.9ft),  Out-to-Out Width: 9.5m (31.2ft)

Condition: Superstructure: Excellent,  Substructure: Excellent,  Channel: Excellent,  Inventory Rating: 61.7 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Deck Geometry: Equal to present minimum criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Meets minimum limits,  Length Of Structure Improvement: 0.91m (2.99ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: October 2021,  Bridge Improvement Cost: $304,000,  Roadway Improvement Cost: $178,000,  Total Project Cost: $482,000 ( Estimate for 2021)
Find on map >>   Show street view

Structure Number: 330265,  Location: BOREAS ROAD IN NO. HUDSON (Lat: 43.954464,  Lng: -73.836342),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 2.01m (6.59ft),  Average Daily Traffic: 191 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 199 (year 2040),  Features Intersected: TRIB BRANCH RIVER,  Facility Carried by Structure: COUNTY ROAD 2
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 21.384,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 8.2m (26.9ft),  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 19.5m (64.0ft),  Curb-To-Curb Width: 7.3m (24.0ft),  Out-to-Out Width: 8.8m (28.9ft)

Condition: Deck: Satisfactory,  Superstructure: Good,  Substructure: Good,  Channel: Very good,  Operating Rating: 55.4 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 42.4 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Better than present minimum criteria,  Deck Geometry: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Equal to present desirable criteria,  Length Of Structure Improvement: 2.01m (6.59ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: August 2020,  Bridge Improvement Cost: $766,000,  Roadway Improvement Cost: $449,000,  Total Project Cost: $1,215,000 ( Estimate for 2021),  Deck Structure Type: Concrete Cast-file-Place,  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 330267,  Location: IN BLUE RIDGE (Lat: 43.958367,  Lng: -73.790328),  Route carried "on" structure: County highway ,  Year Built: 1965,  Status: Open,  Structure Length: 0.85m (2.79ft),  Average Daily Traffic: 191 (year 2018),  Truck Traffic: 19%,  Average Future Daily Traffic: 199 (year 2040),  Features Intersected: NIAGARA BROOK,  Facility Carried by Structure: BOREAS ROAD
Minimum Vertical Clearance: 30+ m (98+ ft),  Kilometerpoint: 25.583,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 9.1m (29.9ft),  Skew: 2 degrees,  Material/Design: Concrete continuous,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 2,  Length of Maximum Span: 3.9m (12.8ft)

Condition: Channel: Satisfactory,  Culverts: Satisfactory,  Operating Rating: 23.7 metric tons,  Method Used To Determine Operating Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Inventory Rating: 18.1 metric tons,  Method Used To Determine Inventory Rating: Load and Resistance Factor Rating (LRFR) rating reported by rating factor(RF) method using HL-93 loadings,  Structural Evaluation: Somewhat better than minimum adequacy,  Waterway Adequacy: Equal to present minimum criteria,  Approach Roadway Alignment: Better than present minimum criteria,  Length Of Structure Improvement: 0.85m (2.79ft),  Designated Inspection Frequency: Every 24 months,  Inspection Date: July 2020,  Bridge Improvement Cost: $372,000,  Roadway Improvement Cost: $218,000,  Total Project Cost: $590,000 ( Estimate for 2021),  Wearing Surface/Protective System: Wearing Surface: Bituminous
Find on map >>   Show street view

Structure Number: 337178,  Location: .5 MI E OF EXIT 30 - I87 (Lat: 44.076147,  Lng: -73.652850),  Route carried "on" structure: County highway ,  Year Built: 2021,  Status: Open,  Structure Length: 0.98m (3.22ft),  Average Daily Traffic: 211 (year 2020),  Truck Traffic: 7%,  Average Future Daily Traffic: 295 (year 2040),  Design Load: HL 93,  Features Intersected: Ash Craft Brook,  Facility Carried by Structure: Tracy Road
Minimum Vertical Clearance: 32.69m (107.25ft),  Kilometerpoint: 0.837,  Lanes on structure: 2,  Owner: County Highway Agency,  Approaching Roadway Width: 7.6m (24.9ft),  Skew: 1 degrees,  Material/Design: Concrete,  Design/Construction: Culvert,  Number Of Spans In Main Unit: 1,  Length of Maximum Span: 9.1m (29.9ft)

Condition: Channel: Very good,  Culverts: Excellent,  Inventory Rating: 81.6 metric tons,  Method Used To Determine Inventory Rating: Load Factor (LF),  Structural Evaluation: Superior to present desirable criteria,  Waterway Adequacy: Meets minimum limits,  Approach Roadway Alignment: Equal to present desirable criteria,  Designated Inspection Frequency: Every 24 months,  Inspection Date: November 2021
Find on map >>   Show street view

Structure Number: 1005851,  Location: I87 EXIT 30 (Lat: 44.076569,  Lng: -73.663239),  Route carried "under" structure: US 9,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,475 (year 1998),  Features Intersected: RTE 9,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.77m (15.65ft),  Kilometerpoint: 37.812,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 1005852,  Location: I87 EXIT 30 (Lat: 44.076272,  Lng: -73.662983),  Route carried "under" structure: US 9,  Year Built: 1965,  Structure Length: 0. m,  Average Daily Traffic: 2,475 (year 1998),  Features Intersected: RTE 9,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 5.00m (16.40ft),  Kilometerpoint: 37.828,  Lanes on structure: 2,  Lanes under structure: 4,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 37.7m (123.7ft)

Find on map >>   Show street view

Structure Number: 1033711,  Location: I87 EXIT 29 (Lat: 43.951686,  Lng: -73.735867),  Route carried "under" structure: State highway 910K,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 350 (year 2021),  Features Intersected: RTE 910K,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.74m (15.55ft),  Kilometerpoint: 3.009,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.2m (59.7ft)

Find on map >>   Show street view

Structure Number: 1033712,  Location: I87 EXIT 29 (Lat: 43.951664,  Lng: -73.735539),  Route carried "under" structure: State highway 910K,  Year Built: 1966,  Structure Length: 0. m,  Average Daily Traffic: 350 (year 2021),  Features Intersected: RTE 910K,  Facility Carried by Structure: RTE I87
Minimum Vertical Clearance: 4.85m (15.91ft),  Kilometerpoint: 3.041,  Lanes on structure: 2,  Lanes under structure: 2,  Material/Design: Steel,  Design/Construction: Stringer/Multi-beam,  Length of Maximum Span: 18.5m (60.7ft)

Discuss North Hudson, New York (NY) on our hugely popular New York forum.


City-data.com does not guarantee the accuracy or timeliness of any information on this site.  Use at your own risk.
Some parts © 2024 Advameg, Inc.